AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 4 of 11  ELOG logo
Entry  Fri Nov 10 07:00:14 2017, MD, CLW, ASM, TD, Run 80 171110_only2of4cycles_problemRing2.jpg171110_0821_beamstop_6hours_nobeam.jpg

Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
Entry  Fri Nov 10 04:53:34 2017, MD, ASM, Run 79 171110_only2of4cycles_problemRing2.jpg
Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
Entry  Fri Nov 10 04:18:41 2017, MD, ASM, Run 78 
Header: 4.7 MeV/u and Empty frame.
Ender: 
====================================================
Entry  Fri Nov 10 02:12:06 2017, MD, ASM, DK, Run 77 

Header: 4.7 MeV/u and C_09. continue after fixing IHS Cavity (part of normal conducting linac)
Ender: 
Entry  Thu Nov 9 21:31:16 2017, SL, Run 74 Screen_Shot_2017-11-09_at_22.35.20.pngScreen_Shot_2017-11-09_at_22.38.49.pngScreen_Shot_2017-11-10_at_13.54.40.png

Header: 4.7 MeV/u and CH2_30+25. 
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date :
09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) : 
Blocks written : 422
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 20:46:29 2017, SL, Run 73 Screen_Shot_2017-11-09_at_22.38.49.png

Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run
number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) : 
Blocks written : 263
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 18:56:13 2017, SL, Run 72 

Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
Run number : 72
Date : 09/11
Start time :
20:14
Stop time : 21:41
Trigger rate (MIDAS) : 
Blocks written : 570
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 12
1- Gated                        : 10
2- dE                           : 59
3- E        
Entry  Thu Nov 9 19:06:08 2017, SL, Run 68-71 
JUNK
Entry  Thu Nov 9 17:35:32 2017, RG, Run 67 

Header: 4.7 MeV/u and CH2_30+25. 
Ender: 
====================================================
Run number : 67
Date : 09/11
Start time :
18:30
Stop time : 19:57 
Trigger rate (MIDAS) : 10 
Blocks written : 463
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 10
1- Gated                        : 9
2- dE                           : 48
3- E         
Entry  Thu Nov 9 16:30:15 2017, SL, Run 66 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender: 
====================================================
Run
number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS)         : 
Blocks written         : 84
——————————————————————————————
Run
Scalars
0- Ungated                      : 14
1- Gated                        : 12
2- dE                           : 51
3- E                       
Entry  Thu Nov 9 15:55:56 2017, SL, Run 65 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender: 
====================================================
Run
number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS)         : 
Blocks written         : 179
——————————————————————————————
Run
Scalars
0- Ungated                      : 10
1- Gated                        : 10
2- dE                           : 50
3- E                       
Entry  Thu Nov 9 15:34:14 2017, SL, Run 64 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (JUST E, not HI, now ~50% live time)
Ender: Stopping as trigger seems slightly off
====================================================
Run
number : 64
Date : 9 / 11
Start time : 16:38
Stop time : 16:56
Trigger rate (MIDAS)         : 
Blocks written         : 102
——————————————————————————————
Run
Scalars
0- Ungated                      : 10
1- Gated                        : 10
2- dE                           : 75
3- E                       
Entry  Thu Nov 9 15:03:21 2017, SL, Run 63 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (dE+E, not HI, now ~50% live time)
Ender: 
====================================================
Run
number : 63
Date : 9 / 11
Start time : 16:03
Stop time : 16:33
Trigger rate (MIDAS)         : 
Blocks written         : 270
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 56
1- Gated                        : 34
2- dE                           : 43
3- E        
Entry  Thu Nov 9 12:14:05 2017, SL, Run 62 

Header: 4.7 MeV/u and CH2_30+25. 
Ender: 
====================================================
Run number : 62
Date : 9 / 11
Start time :
13:55
Stop time : 16:03
Trigger rate (MIDAS)         : 50
Blocks written         : 1299
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 10:15:38 2017, Sarah Lonsdale, Run 61 

Header: 5.0 MeV/u and Carbon (C_25). 
Ender: 
====================================================
Run number : 61
Date : 9 / 11
Start
time : 11:19
Stop time : 12:04
Trigger rate (MIDAS)         : 1205
Blocks written         : 482
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 500
1- Gated                        : 100
2- dE                           : 5
3- E       
Entry  Thu Nov 9 09:49:03 2017, Sarah Lonsdale, Run 60 

Header: 5.0 MeV/u and Empty Frame.  Tuned beam to lower scatter, solved dE counting issue. Pulser scaler has been added.
Ender: 
====================================================
Run
number : 60
Date : 9 / 11
Start time : 10:50
Stop time : 11:14
Trigger rate (MIDAS)         : 20
Blocks written         : 180
——————————————————————————————
Beam
energy : 5.0 MeV/u
Beam intensity         : 1.5 to 2.0 epA **
Target : #7 Empty Frame
Ladder position         : 52.09 mm
HI Degrader foil (um) :
Entry  Thu Nov 9 06:02:41 2017, Daid. Mirco, Run 57 
Header: Continue with 5.0 MeV/u and CH2.  Laser back on.
Ender: 
====================================================
Entry  Thu Nov 9 05:35:44 2017, Daid. Mirco, Run 56 

Header: 5.0 MeV/u CH2, Laser 2 is turned off on purpose to check background.
Ender: Could not see many real events beside pulser and current was very low
Entry  Thu Nov 9 03:32:55 2017, Daid. Mirco, Run 55 gps-r55.jpgpsb-run55.jpg
Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Entry  Thu Nov 9 01:24:01 2017, Daid. Mirco, Run 54 
Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.  Target current is 2 A (low...should be 430 A).  No beam seen at our FC, although MIDAS seemed to have events.
NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS 
ELOG V3.1.4-unknown