ID |
Date |
Author |
Subject |
83
|
Fri Nov 10 07:00:14 2017 |
MD, CLW, ASM, TD | Run 80 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
====================================================
Run number : 80
Date : 10/11
Start time : 08:00:49
Stop time : 08:35:05
Trigger rate (MIDAS) : 8
Blocks written : 202
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 9
1- Gated : 8
2- dE : 42
3- E : 8
4- HI : 482
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : not checked this run (should be around 1.5pA)
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.745
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.905
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.75E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : 5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
- since 6:20 RF problem on ring2 (although 3 full inj are shown) : ~1.6E+14 protons only
- 8.21 comment on PS: 6 hours of no beam
- 08:35 stop run, because no beam
==================================================== |
82
|
Fri Nov 10 04:53:34 2017 |
MD, ASM | Run 79 | Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 79
Date : 10/11
Start time : 05:52:13
Stop time : 08:00:08
Trigger rate (MIDAS) : 8
Blocks written : 789
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 11
1- Gated : 10
2- dE : 49
3- E : 8
4- HI : 536
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : ~1.8 pA (~1.5 pA @7.30) --> Laser quality is decreasing
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.745
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.895
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.9
Temp (chamber) : 5.6 (from before)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
- since 6:20 RF problem on ring2 (although 3 full inj are shown) : ~1.6E+14 protons only
- 07:34 MIDAS crashed ("arithmetic exception (core dumped)")
- 07:36 restart MIDAS-session: DAQ is still fine, start spectrum viewer, SortSas still open and working, Open
Scalers (tick "Enable Rates") fine)
==================================================== |
81
|
Fri Nov 10 04:18:41 2017 |
MD, ASM | Run 78 | Header: 4.7 MeV/u and Empty frame.
Ender:
====================================================
Run number : 78
Date : 10/11
Start time : 05:18:20
Stop time : 05:49:43
Trigger rate (MIDAS) : 2-3
Blocks written : 165
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 2
1- Gated : 2
2- dE : 31
3- E : 2
4- HI : 11
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : ~2.0 pA (at the end maybe ~1.7 pA)
Target : Empty frame (Pos#7)
Ladder position : 52.09
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.895
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: scaler on HI-det: around 10 --> prescaler = 0. Thats why only E trigger. Check if trigger technique
also suits empty frame runs.
see few dE versus E event --> scattered on target frame (I guess)
==================================================== |
80
|
Fri Nov 10 02:12:06 2017 |
MD, ASM, DK | Run 77 |
Header: 4.7 MeV/u and C_09. continue after fixing IHS Cavity (part of normal conducting linac)
Ender:
====================================================
Run number : 77
Date : 10/11
Start time : 03:13:59
Stop time : 05:14:52
Trigger rate (MIDAS) : 6
Blocks written : 796
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 8
1- Gated : 7
2- dE : 34
3- E : 7
4- HI : 586
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : 2.25 pA
Target : C_09 (Pos#5; ~545 ug/cm2)
Ladder position : 82.44
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.5
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -14
E_hi leakage (uA) : 0.88
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.9
Temp (chamber) : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
before run number increased twice --> no run76
2h of Carbon reference.
==================================================== |
77
|
Thu Nov 9 21:31:16 2017 |
SL | Run 74 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date : 09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) :
Blocks written : 422
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
ISOLDE: (PSB is 1 ring down - CCC operator to return 1st ring when fixed)
Fluctuations in intensity throughout run, as operator attempts to restart.
Final decision made to run with 3 rings and more runs per supercycle at 23:10.
==================================================== |
76
|
Thu Nov 9 20:46:29 2017 |
SL | Run 73 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) :
Blocks written : 263
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |
74
|
Thu Nov 9 18:56:13 2017 |
SL | Run 72 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 72
Date : 09/11
Start time : 20:14
Stop time : 21:41
Trigger rate (MIDAS) :
Blocks written : 570
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 12
1- Gated : 10
2- dE : 59
3- E : 8
4- HI : 672
5- Pulser : 2
6- Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |
75
|
Thu Nov 9 19:06:08 2017 |
SL | Run 68-71 | JUNK |
73
|
Thu Nov 9 17:35:32 2017 |
RG | Run 67 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 67
Date : 09/11
Start time : 18:30
Stop time : 19:57
Trigger rate (MIDAS) : 10
Blocks written : 463
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 10
1- Gated : 9
2- dE : 48
3- E : 7
4- HI : 561
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
saving spectra: /directory/r67/spectra
"Online dE v E and PI v dE+E spectra show foldback for alpha events at
c. 32MeV which implies that the thickness of the E detector is c. 500um."
==================================================== |
71
|
Thu Nov 9 16:30:15 2017 |
SL | Run 66 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS) :
Blocks written : 84
——————————————————————————————
Run Scalars
0- Ungated : 14
1- Gated : 12
2- dE : 51
3- E : 11
4- HI : 672
5- Pulser : 2
6- 1kHz Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.0 x 10^-6 mbar
Pressure (old gauge) : 2.0 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.2 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments: Beam stopped short because the beam went off from PBS towards the end.
==================================================== |
70
|
Thu Nov 9 15:55:56 2017 |
SL | Run 65 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender:
====================================================
Run number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS) :
Blocks written : 179
——————————————————————————————
Run Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 50
3- E : 10
4- HI : 666
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
in sum spectra S4000: Counts above 100 MeV: 12
==================================================== |
69
|
Thu Nov 9 15:34:14 2017 |
SL | Run 64 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (JUST E, not HI, now ~50% live time)
Ender: Stopping as trigger seems slightly off
====================================================
Run number : 64
Date : 9 / 11
Start time : 16:38
Stop time : 16:56
Trigger rate (MIDAS) :
Blocks written : 102
——————————————————————————————
Run Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 75
3- E : 6
4- HI : 90
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
68
|
Thu Nov 9 15:03:21 2017 |
SL | Run 63 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (dE+E, not HI, now ~50% live time)
Ender:
====================================================
Run number : 63
Date : 9 / 11
Start time : 16:03
Stop time : 16:33
Trigger rate (MIDAS) :
Blocks written : 270
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 56
1- Gated : 34
2- dE : 43
3- E : 5
4- HI : 654
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
in sum spectra S4000: Counts above 100 MeV: 8
==================================================== |
66
|
Thu Nov 9 12:14:05 2017 |
SL | Run 62 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 62
Date : 9 / 11
Start time : 13:55
Stop time : 16:03
Trigger rate (MIDAS) : 50
Blocks written : 1299
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
65
|
Thu Nov 9 10:15:38 2017 |
Sarah Lonsdale | Run 61 |
Header: 5.0 MeV/u and Carbon (C_25).
Ender:
====================================================
Run number : 61
Date : 9 / 11
Start time : 11:19
Stop time : 12:04
Trigger rate (MIDAS) : 1205
Blocks written : 482
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 500
1- Gated : 100
2- dE : 5
3- E : 5
4- HI : 2
5- Pulser : 400
——————————————————————————————
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA **
Target : #3 C_25
Ladder position : 112.78 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.085 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.2 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
64
|
Thu Nov 9 09:49:03 2017 |
Sarah Lonsdale | Run 60 |
Header: 5.0 MeV/u and Empty Frame. Tuned beam to lower scatter, solved dE counting issue. Pulser scaler has been added.
Ender:
====================================================
Run number : 60
Date : 9 / 11
Start time : 10:50
Stop time : 11:14
Trigger rate (MIDAS) : 20
Blocks written : 180
——————————————————————————————
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA **
Target : #7 Empty Frame
Ladder position : 52.09 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.085 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.2 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
59
|
Thu Nov 9 06:02:41 2017 |
Daid. Mirco | Run 57 | Header: Continue with 5.0 MeV/u and CH2. Laser back on.
Ender:
====================================================
Run number : 57
Date : 9 / 11
Start time : 06:55
Stop time :
Trigger rate (MIDAS) : 2078
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA
Target : #2 CH2
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.025 uA
E voltage (V) : -350 V
E leakage (uA) : 1.735 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.4 x 10^-6 mbar
Pressure (old gauge) : 2.2 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
58
|
Thu Nov 9 05:35:44 2017 |
Daid. Mirco | Run 56 |
Header: 5.0 MeV/u CH2, Laser 2 is turned off on purpose to check background.
Ender: Could not see many real events beside pulser and current was very low
====================================================
Run number : 56
Date : 9 Nov 2017
Start time : 06:34:45
Stop time : 06:54:37
Trigger rate (MIDAS) : 2030
Blocks written : 2488
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : (cannot be measured)
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.025 uA
E voltage (V) : -350 V
E leakage (uA) : 1.735 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.53 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.4 x 10^-6 mbar
Pressure (old gauge) : 2.2 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : - 10.1 deg
Temp (chamber) : + 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
comment: Why is the trigger rate nearly the same with the laser on and off ??!! |
56
|
Thu Nov 9 03:32:55 2017 |
Daid. Mirco | Run 55 | Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Run number : 55
Date : 9 Nov 2017
Start time : 04:32
Stop time : 06:34
Trigger rate (MIDAS) : 2081
Blocks written : 16180
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : ~2 epA -> (2*10^-12)/(24*1.602*10^-19) = 520833 pps
NB: See https://elog.ph.ed.ac.uk/ISOLDE/54 for factor 24 rather than 20 (theoretical estimate)
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.02 uA
E voltage (V) : -350 V
E leakage (uA) : 1.75 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.52 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.32 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.5 x 10^-6 mbar
Pressure (old gauge) : 2.3 x 10^-5 mbar
Pressure (SEC) : 4.0 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0 deg
Temp (chamber) : +5.4 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: First laser does not have a red peak at the center, but maybe okay for this shift.
Attaching PSB and GPS screenshots, as we need to monitor them regularly.
At 6:18 to 6:40, we started getting four rings from the PS Booster. The 1st ring had a fairly low intensity, and the operators later dropped it. These times were confirmed
exactly with communication with PS operators.
again.
==================================================== |
55
|
Thu Nov 9 01:24:01 2017 |
Daid. Mirco | Run 54 | Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40. Target current is 2 A (low...should be 430 A). No beam seen at our FC, although MIDAS seemed to have events.
NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS
====================================================
Run number : 54
Date : 9 Nov 2017
Start time : 02:24:23
Stop time : 03:02
Trigger rate (MIDAS) : 2181
Blocks written : 8749
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity :
Target : #2 CH2_16 ( 450 ~ 480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.015 uA
E voltage (V) : -350 V
E leakage (uA) : 1.77 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.3 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.75 x 10^-6 mbar
Pressure (old gauge) : 2.5 x 10^-5 mbar
Pressure (SEC) : 4.1 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.1 deg
Temp (chamber) : 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|