Sun Nov 12 09:17:49 2017, CLW, PJW, TD, Run 107
|
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|
Sun Nov 12 09:16:01 2017, CLW, PJW, TD, Run 106
|
junk - ignore |
Sun Nov 12 06:23:36 2017, RG MB, Run 105
|
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: run ends OK to change beam energy from 4.0MeV/u to 4.29MeV/u
====================================================
|
Sun Nov 12 04:22:57 2017, RG MB, Run 104
|
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender:
====================================================
|
Sun Nov 12 01:46:23 2017, RG MB, Run 103
|
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off. Noticed on the HI det scalar
====================================================
|
Sun Nov 12 01:28:26 2017, RG MB, Run 102 - Junk
|
Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity tripped
====================================================
|
Sat Nov 11 23:30:25 2017, RG MB, Run 101
|
Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender:
====================================================
Run number : 101
Date : 12/11/2017
Start
time : 00:27
Stop time : 02:29
Trigger rate (MIDAS) : 6
Blocks written : 484
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 146151
3- E |
Sat Nov 11 20:27:28 2017, TD, DK, RG, MB, Run 100
|
Header: Continue CH2 at 4.0 MeV/u
Ender:
====================================================
|
Sat Nov 11 17:08:50 2017, RG, DK, CL, TD, AM, MD, Run 96
|
Header: Continue with 4.0 MeV/u Empty Frame
Ender:
====================================================
|
Thu Nov 9 08:20:21 2017, Claudia, Restarting Target Current & Line Current
|
0) If target or line drop, STOP THE BEAM!!
1) If you SEE target or line current go down (top right window of monitors next to the corridor):
Use Knobs open application (monitor below); remember set value; type 0 in set window; click Mode - Reset; click Mode - On. increase current in |
Fri Nov 10 16:32:19 2017, Claudia, RAL Amplitude Thresholds
|
Thresholds of RAL amplifiers set to: dE 30mV; E 20 mV, HI 20 mV |
Tue Nov 20 16:06:09 2018, dk, Projected Inventory of ISOLDE
|
(To be confirmed / finalized)
==Rack Electronics==
|
Tue Nov 14 14:30:51 2017, SL, Photos inside chamber (detectors, IRIS, etc)
|
|
Thu Sep 27 11:14:34 2018, CBH, Photos and Measurements from August CERN Trip   
|
Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
|
Mon Oct 30 09:46:04 2017, Peter Black, Notes on iris install/operation
|
The iris mounts have 2 superimposed constellations of 3mm mounting holes on them that correspond to those of the S2 detector, however the 85x85 square
is missing one hole and the 110x40 rectangle is rotated by 45°. Either constellation may be used. Fixing is intended with M3x16 bolts into 10mm standoffs
used to attach the detector to its mount. |
Fri Jan 27 11:02:03 2017, DK, PB, Notes from visit to CERN
|
Here I am simply digitizing my notes from our visit to CERN 17~18 January 2017. They may not be perfectly linear or organized, but may be searchable.
==ISOLDE Hall Info==
|
Wed May 24 15:21:37 2017, MD, Notes from visit of ISOLDE at 23rd May 2017
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Wed May 24 16:09:10 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Wed May 24 16:18:22 2017, MD, Notes from visit of ISOLDE at 23rd May 2017   
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Thu Nov 8 10:01:32 2018, CBH, DK, New Struts Installation 8x
|
Struts arrived and were installed on Wednesday. The holes on one side of each of the struts to connect the wheels to were slightly too wide (11.5
cm vs 10.5 cm).
We've taken away part of the wheel holders and now they seem to be fitting in. |