Entry  Sun Nov 12 09:17:49 2017, CLW, PJW, TD, Run 107 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
Entry  Sun Nov 12 09:16:01 2017, CLW, PJW, TD, Run 106 
junk - ignore
Entry  Sun Nov 12 06:23:36 2017, RG MB, Run 105 
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: run ends OK to change beam energy from 4.0MeV/u to 4.29MeV/u
====================================================
Entry  Sun Nov 12 04:22:57 2017, RG MB, Run 104 
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: 
====================================================
Entry  Sun Nov 12 01:46:23 2017, RG MB, Run 103 
Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off. Noticed on the HI det scalar
====================================================
Entry  Sun Nov 12 01:28:26 2017, RG MB, Run 102 - Junk 
Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity tripped
====================================================
Entry  Sat Nov 11 23:30:25 2017, RG MB, Run 101 

Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: 
====================================================
Run number : 101
Date : 12/11/2017
Start
time : 00:27
Stop time : 02:29
Trigger rate (MIDAS)         : 6
Blocks written         : 484
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 4
1- Gated                        : 4
2- dE                           : 146151
3- E      
Entry  Sat Nov 11 20:27:28 2017, TD, DK, RG, MB, Run 100 
Header: Continue CH2 at 4.0 MeV/u
Ender: 
====================================================
Entry  Sat Nov 11 17:08:50 2017, RG, DK, CL, TD, AM, MD, Run 96 
Header: Continue with 4.0 MeV/u Empty Frame
Ender: 
====================================================
Entry  Thu Nov 9 08:20:21 2017, Claudia, Restarting Target Current & Line Current 
0) If target or line drop, STOP THE BEAM!!

1) If you SEE target or line current go down (top right window of monitors next to the corridor): 

Use Knobs open application (monitor below); remember set value; type 0 in set window; click Mode - Reset; click Mode - On. increase current in
Entry  Fri Nov 10 16:32:19 2017, Claudia, RAL Amplitude Thresholds 
Thresholds of RAL amplifiers set to: dE 30mV; E 20 mV, HI 20 mV
Entry  Tue Nov 20 16:06:09 2018, dk, Projected Inventory of ISOLDE 
(To be confirmed / finalized)

==Rack Electronics==
Entry  Tue Nov 14 14:30:51 2017, SL, Photos inside chamber (detectors, IRIS, etc) OneDrive-2017-11-14_2.zip
 
Entry  Thu Sep 27 11:14:34 2018, CBH, Photos and Measurements from August CERN Trip 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg
Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
Entry  Mon Oct 30 09:46:04 2017, Peter Black, Notes on iris install/operation 
The iris mounts have 2 superimposed constellations of 3mm mounting holes on them that correspond to those of the S2 detector, however the 85x85 square
is missing one hole and the 110x40 rectangle is rotated by 45°. Either constellation may be used. Fixing is intended with M3x16 bolts into 10mm standoffs
used to attach the detector to its mount.
Entry  Fri Jan 27 11:02:03 2017, DK, PB, Notes from visit to CERN 
Here I am simply digitizing my notes from our visit to CERN 17~18 January 2017.  They may not be perfectly linear or organized, but may be searchable.

==ISOLDE Hall Info==
Entry  Wed May 24 15:21:37 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Wed May 24 16:09:10 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpg
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Wed May 24 16:18:22 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpgcorner-possible_offline_setup-1.jpgpower_supply_near_beam-1.jpg
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Thu Nov 8 10:01:32 2018, CBH, DK, New Struts Installation 8x
Struts arrived and were installed on Wednesday. The holes on one side of each of the struts to connect the wheels to were slightly too wide (11.5
cm vs 10.5 cm).
We've taken away part of the wheel holders and now they seem to be fitting in.