|
ID |
Date |
Author |
Subject |
Text |
 |
|
121
|
Sun Nov 12 09:17:49 2017 |
CLW, PJW, TD | Run 107 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|
|
|
120
|
Sun Nov 12 09:16:01 2017 |
CLW, PJW, TD | Run 106 | junk - ignore |
|
|
118
|
Sun Nov 12 06:23:36 2017 |
RG MB | Run 105 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: run ends OK to change beam energy
from 4.0MeV/u to 4.29MeV/u
|
|
|
117
|
Sun Nov 12 04:22:57 2017 |
RG MB | Run 104 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender:
====================================================
|
|
|
116
|
Sun Nov 12 01:46:23 2017 |
RG MB | Run 103 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off.
Noticed on the HI det scalar
|
|
|
115
|
Sun Nov 12 01:28:26 2017 |
RG MB | Run 102 - Junk | Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity
tripped
|
|
|
114
|
Sat Nov 11 23:30:25 2017 |
RG MB | Run 101 |
Header: CH2 #30+25, Beam energy 4.0
MeV/u
Ender:
====================================================
Run
number : 101
Date : 12/11/2017
Start |
|
|
113
|
Sat Nov 11 20:27:28 2017 |
TD, DK, RG, MB | Run 100 | Header: Continue CH2 at 4.0 MeV/u
Ender:
====================================================
|
|
|
106
|
Sat Nov 11 17:08:50 2017 |
RG, DK, CL, TD, AM, MD | Run 96 | Header: Continue with 4.0 MeV/u Empty Frame
Ender:
====================================================
|
|
|
62
|
Thu Nov 9 08:20:21 2017 |
Claudia | Restarting Target Current & Line Current | 0) If target or line drop, STOP THE BEAM!!
1) If you SEE target or line current
go down (top right window of monitors next |
|
|
87
|
Fri Nov 10 16:32:19 2017 |
Claudia | RAL Amplitude Thresholds | Thresholds of RAL amplifiers set to: dE
30mV; E 20 mV, HI 20 mV |
|
|
211
|
Tue Nov 20 16:06:09 2018 |
dk | Projected Inventory of ISOLDE | (To be confirmed / finalized)
==Rack Electronics==
|
|
|
157
|
Tue Nov 14 14:30:51 2017 |
SL | Photos inside chamber (detectors, IRIS, etc) | |
|
|
190
|
Thu Sep 27 11:14:34 2018 |
CBH | Photos and Measurements from August CERN Trip | Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
|
   |
|
35
|
Mon Oct 30 09:46:04 2017 |
Peter Black | Notes on iris install/operation | The iris mounts have 2 superimposed constellations
of 3mm mounting holes on them that correspond
to those of the S2 detector, however the |
|
|
1
|
Fri Jan 27 11:02:03 2017 |
DK, PB | Notes from visit to CERN | Here I am simply digitizing my notes from
our visit to CERN 17~18 January 2017. They
may not be perfectly linear or organized, |
|
|
Draft
|
Wed May 24 15:21:37 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
|
|
Draft
|
Wed May 24 16:09:10 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
 |
|
9
|
Wed May 24 16:18:22 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
   |
|
206
|
Thu Nov 8 10:01:32 2018 |
CBH, DK | New Struts Installation | Struts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide |
8x |