  121   Sun Nov 12 09:17:49 2017 CLW, PJW, TDRun 107Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
  
  120   Sun Nov 12 09:16:01 2017 CLW, PJW, TDRun 106junk - ignore   
  118   Sun Nov 12 06:23:36 2017 RG MBRun 105Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: run ends OK to change beam energy
from 4.0MeV/u to 4.29MeV/u
  
  117   Sun Nov 12 04:22:57 2017 RG MBRun 104Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: 
====================================================
  
  116   Sun Nov 12 01:46:23 2017 RG MBRun 103Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off.
Noticed on the HI det scalar
  
  115   Sun Nov 12 01:28:26 2017 RG MBRun 102 - JunkHeader: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity
tripped
  
  114   Sat Nov 11 23:30:25 2017 RG MBRun 101
Header: CH2 #30+25, Beam energy 4.0
MeV/u
Ender: 
====================================================
Run
number : 101
Date : 12/11/2017
Start
  
  113   Sat Nov 11 20:27:28 2017 TD, DK, RG, MBRun 100Header: Continue CH2 at 4.0 MeV/u
Ender: 
====================================================
  
  106   Sat Nov 11 17:08:50 2017 RG, DK, CL, TD, AM, MDRun 96Header: Continue with 4.0 MeV/u Empty Frame
Ender: 
====================================================
  
  62   Thu Nov 9 08:20:21 2017 ClaudiaRestarting Target Current & Line Current0) If target or line drop, STOP THE BEAM!!

1) If you SEE target or line current
go down (top right window of monitors next
  
  87   Fri Nov 10 16:32:19 2017 ClaudiaRAL Amplitude ThresholdsThresholds of RAL amplifiers set to: dE
30mV; E 20 mV, HI 20 mV
  
  211   Tue Nov 20 16:06:09 2018 dkProjected Inventory of ISOLDE(To be confirmed / finalized)

==Rack Electronics==
  
  157   Tue Nov 14 14:30:51 2017 SLPhotos inside chamber (detectors, IRIS, etc)   OneDrive-2017-11-14_2.zip 
  190   Thu Sep 27 11:14:34 2018 CBHPhotos and Measurements from August CERN TripChamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg 
  35   Mon Oct 30 09:46:04 2017 Peter BlackNotes on iris install/operationThe iris mounts have 2 superimposed constellations
of 3mm mounting holes on them that correspond
to those of the S2 detector, however the
  
  1   Fri Jan 27 11:02:03 2017 DK, PBNotes from visit to CERNHere I am simply digitizing my notes from
our visit to CERN 17~18 January 2017.  They
may not be perfectly linear or organized,
  
  Draft   Wed May 24 15:21:37 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
  
  Draft   Wed May 24 16:09:10 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpg 
  9   Wed May 24 16:18:22 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpgcorner-possible_offline_setup-1.jpgpower_supply_near_beam-1.jpg 
  206   Thu Nov 8 10:01:32 2018 CBH, DKNew Struts InstallationStruts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide
 8x 