Thu Jun 15 09:57:01 2023, Annie, Si Set Up 12x
|
Si Set up images and documentation.
Detector 1 - C6D6D: Distance= 9 cm, Angle= 135 deg relative to BL (check set up pdf for drawing if unsure), Voltage= 1550 V
Detector 2 - C6D6E: Distance= 9 cm, Angle= 135 deg relative to BL, Voltage= 1590 V |
Tue Apr 11 14:07:43 2023, Claudia, Photos of the Zn68 measurement setup    
|
Photos of the 68Zn(n,gamma) measuremement setup at n_TOF EAR-1. |
Fri Jul 29 17:21:47 2022, Ragan, Enriched Si-30 
|
Attached are the pictures of enriched Si-30 metal pieces. |
Sat Mar 19 17:29:43 2022, Nikolay Sosnin, Al26 Experimental Inventory at n_TOF
|
Three aluminium crates contain 26Al(n, alpha) kit from EAR2, and was in the barracks (building 6547) near detector lab by EAR1 entrance. A list is attached
and photos can be found on Dropbox:
https://www.dropbox.com/sh/68k1xove2zr1bmj/AADKvN8wR_Ia2EwZMOXZqdMCa?dl=0 |
Mon Jan 25 16:11:54 2021, Nikolay Sosnin, 25.01.2021: Cross-section Calculation Update
|
|
Mon Oct 5 15:01:04 2020, RG, Monday meeting slides: 05 Oct
|
Summary of work done so far. |
Mon Oct 5 14:54:55 2020, Nikolay Sosnin, Overall Progress: Monday Meeting 05.10.2020
|
|
Fri Oct 2 14:01:24 2020, RG, Monday meeting slides: 28 Sep
|
Further investigation into dedicated and parasitic discrepancy. |
Fri Oct 2 13:59:05 2020, RG, Monday meeting slides: 21 Sep
|
Dedicated and parasitic discrepancy (Au 5eV resonance plateau) - quantified.
Flux and E_exc numalisation after sum WF. |
Fri Oct 2 13:55:52 2020, RG, Monday meeting slides: 14 Sep
|
Discrepancy between dedicated and parasitic pulses histograms in the 5eV gold resonance plateau region.
Corrected tof to En conversion.
E_excitation and flux normalisation of yield. |
Fri Oct 2 13:47:59 2020, RG, Monday meeting slides: 07 Sep
|
Proton consistency test (BCT, SiMon, weighted, unweigted, dedicated, parasitic) - Au cal1 and Se78
BG subtraction
TOF to En conversion |
Tue Sep 29 18:36:03 2020, Nikolay Sosnin, SAMMY Fits to Known Se77 Resonances: Meeting 28.09.2020
|
|
Mon Sep 14 13:47:26 2020, Nikolay Sosnin, Summed WF: Monday Meeting 14.09.2020
|
|
Mon Sep 7 13:57:28 2020, Nikolay Sosnin, SAMMY Fits Au197: Monday Meeting 07.08.2020
|
|
Fri Aug 7 10:57:10 2020, Ruchi, Monday meeting slides: 03 Aug
|
|
Fri Aug 7 10:56:03 2020, Ruchi, Monday meeting slides: 27 Jul
|
|
Fri Aug 7 10:55:43 2020, Ruchi, Monday meeting slides: 20 Jul
|
|
Fri Aug 7 10:53:14 2020, Ruchi, Monday meeting slides: 13 Jul
|
|
Fri Aug 7 10:50:57 2020, Ruchi, Monday meeting slides: 06 Jul
|
|
Fri Aug 7 10:39:18 2020, Ruchi, TTOFSort processing macro and files path
|
/eos/user/r/rugarg/public/2017_10_ng_ZnSe/
Latest 4 processing scripts:
1. process_runs_Au1_Jul20.C = Au runs (Se78 part), empty holder runs (Se78 part), and beam-off runs (Se78 part) processed with Au weighting |