AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 1 of 5  ELOG logo
ID Date Author Subjectdown
  44   Mon Jul 31 10:21:41 2023 Nikolay Sosninn_TOF Data and Filtering
  81   Wed Feb 12 13:51:02 2025 CLWexpected counts B and Li

The rootfiles countsB.root and countsLi.root contain histograms of count spectra that would be expected at n_TOF for a 10B and a 6Li target, respectively. The units in y are arbitrary. This can be used to check, if we can reproduce the expected trend with our Li and B measurements. So the histograms called "counts" can be directly compared to the histograms called "energy" in Sili_deed.c (they should have the same binning). You need to scale the histogram to get a decent overlap. You can use this also to estimate the neutron energy calibration - the thermal bump at low energy will give you a good idea of the flight path length. Structure at high energy will give you a better idea on the offset.

The files 6Li_endf.root and 10B_endf.root are the original cross section files, and countrate_calc.C is the file used to produce the count spectra.

 

  95   Mon Jul 21 10:30:01 2025 SelinThe 2D Energy Spectrum of Ca41

The 2D energy spectrum of Ca41 (36 runs). The expected alpha energies are 4.8 MeV (alpha_0) and 2.7 MeV (alpha_1).

  30   Thu Oct 6 09:34:30 2022 ClaudiaTest setup Photos and cabling

Setup 5.10.22

dE 20 um (ID 2837-33) and 494 um double sided (ID 1194-9)

46 channels (2 connectors missing)

LiF4 in beam 

dE: Big flat cables from preamp 22 and 23 into 1A and 1B

E: from preamp 24+25 go into 2A, 2B and 3A 3B

LEMO converter box: Cable 1: dE

                                   Cable 3: E n+n

                                  unlabeled cable: E p+n

E detector voltage: -133 V, leakage current -0.53 micro-Amp

dE detector voltage -22 V, leakage current -0.03 micro-Amp

For the E detector one of the edge p+n strip bond-wires is suspected broken.

  51   Thu Aug 10 11:30:32 2023 Nikolay SosninSilicons and LiF3+Gafchromic Target
  83   Fri Jun 20 09:49:11 2025 CLWSilicon detector setup description
  36   Sat Oct 8 11:56:49 2022 Nikolay SosninSilicon Strips of Concern

DEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline throughout the campaign.

  85   Fri Jul 11 09:16:18 2025 TDSilena 7710 Quad Bias Supply manual and internal configuration
Manual - see attachment 1


Internal configuration

Voltage full scale - 400V/10uA

JP1/1-4 fitted
JP4 fitted *see note below
DVM card JP1 AB
HV jumpers AB

Current readout resolution - 10nA

DVM card JP2 LM
JP5/1-5 GH


Polarity - channels 1-4 negative

Note with channel 1 voltage set to -180V the output voltage measured by DMM is -40V.
The output impedance of the Silena 7710 outputs may be comparable to the input impedance of the DMM (DMM typically c. 20-40M) so the measured voltage will be a *lower* 
limit.

With JP4 removed (per manual instructions for voltage full scale 400V/10uA) the front panel reads -20V with an output voltage measured by DMM of -40V.
Again, the measured voltage will be a lower limit.

By observation of the behaviour of the electronic noise of p+n junction and n+n Ohmic strips as a function of bias for MSL type W1 DSSSD 3353-4 (75um) the voltage 
applied to the DSSSD is > depletion.
MSL QA tests report depletion voltage 28V and test/operating voltage 28+10V = 38V.
  58   Fri Aug 11 13:06:54 2023 AnnieSignal Spreadsheet info

Spreadhseet made for shifters to manually enter that they have checked each signal and that they can see gamma-flashes. It is saved as "26Al_EAR2_Signal_Checks.ods", it is located on the second monitor on the right of the control room, next to the monitor used to see the beam intensity (same monitor used to see signals).

It will stay open throughout the campeign. Shifters have been told to check signals more than just the once to record that they're okay, and there is a comments box for shifters to add any comments/issues that arises after they have recorde that they have checked the signals at least once.

  26   Fri Sep 2 12:03:40 2016 SarahSPD card changed

14 bit card replaced for DEED 9-12, to prevent issue with pulser arriving before gamma flash.

  90   Wed Jul 16 08:55:22 2025 SelinRun221141 Boron Uncalibrated Data

Plots of Boron #1 run (221141) from the Ca41 campaign with the right voltage applied (11.07.2025).

1- Uncalibrated amplitude spectra of strip 1 (dedicated).

2- Uncalibrated 2d energy plot of Boron dedicated data.

3- Uncalibrated amplitude spectra of strip 22 (dedicated). The alpha-0 on the back strips has lower counts.

  89   Wed Jul 16 08:51:06 2025 SelinRun221136 Lithium Uncalibrated Data

Plots of Lithium #3 run (221136) from the Ca41 campaign with the right voltage applied (11.07.2025).

1- Uncalibrated amplitude spectra of strip 1 (dedicated).

2- Uncalibrated amplitude spectra of strip 1 (parasitic).

3- Uncalibrated 2d energy plot of Lithium dedicated data.

  86   Sat Jul 12 10:30:06 2025 Francisco García InfantesReport Experimental SetUp Ca41

I'm attaching a report for the experimental setup so far.

There is a main problem which haven't been solved yet and I don't know if that can cause problem in the future analysis.

Channels #23, #24, #31 and #32 are not working well. The signal os these channels look attenuated from the pulser, make impossible to see then in the Boron run.

As these channels are in the back side of the detector, it could be possible to run like? Unless we have more ideas about to solve the problem.

The front channels work well all of them, and the rest of the back channels work well as well.

I attach the current for the +15 and -15 volt applied to the PreAmp (low voltage) and the leakage current from the detector is 0.1 uA.

  62   Mon Aug 14 11:00:13 2023 TDRAL108 +/-15V PSU test in ISOLDE hall
This morning 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient noise is observed at the +/-15V PSU 
outputs - this was confirmed. See https://elog.ph.ed.ac.uk/nToF/63

Following this test the same 2x RAL108 +/-15V PSUs were tested in the ISOLDE hall ( 19" rack adjacent to the HIE-ISOLDE GP scattering chamber ). 


PSU #1 Coutant HSC15-3.0

Setup and PSU details - attachments 1-4

DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 5mV/div x: 400ns, 4us & 40us/div - attachments 5-7


PSU #2 Farnell MX2

Setup and PSU details - attachments 8-10

DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 5mV/div x: 400ns, 4us & 40us/div - attachments 11-13


Conclusion 

The noise of the 2x RAL108 +/-15V PSUs differed somewhat ( frequency and structure of HF transients ) from each other in the ISOLDE test.

Compared to the EAR2, n_TOF test the amplitudes were c. 10x smaller and the HF transient frequency and structure differed.

This appears to confirm that the primary problem is the ac mains power in EAR2, n_TOF - input and/or output filtering is required.
  63   Tue Aug 15 10:17:39 2023 TD, NSRAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August
On the morning of Monday 14 August 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient 
noise is observed at the +/-15V PSU outputs.


PSU #2 Farnell MX2

Setup - attachment 1

DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 50mV/div x: 1us, 500ns, 250ns & 25us/div - attachments 2-5



PSU #1 Coutant HSC15-3.0

Setup - attachment 6

DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 50mV/div x: 25us/div - attachment 7


Conclusion

Observe same amplitude and HF structure with all 3x RAL108 +/-15V PSUs
  67   Mon Aug 21 12:08:59 2023 TDRAL108 +/-15V PSU test - JCMB 21.8.23
PSU Calex

Setup, PSU and ac mains filter - attachments 1-3


DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 50mV/div x: 100ns, 200ns, 1us, 2us, 10us/div

Without ac mains filter - attachments 4-8



DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 10mV/div x: 100ns, 200ns, 1us, 2us, 10us/div

With ac mains filter - attachments 9-13

Conclusion - Claud Lyons Ltd STF Series Surge & Transient Power Filter produces c. x 2 attenuation of HF noise transients
  66   Sat Aug 19 14:14:26 2023 TDRAL108 +/-15V PSU test - JCMB 18.8.23
PSU Calex

Setup and PSU details - attachments 1-3

DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 20mV/div x: 100ns, 200ns, 1us, 2us, 10us, 20us & 100us/div - attachments 4-10
  99   Wed Aug 6 11:20:52 2025 SelinPulser Test

The pulser test was performed with a frequency of 500 Hz and with voltage settings of: 2V, 1.6V, 1.2V, 0.8V, 0.6V, 0.4V, 0.3V, 0.2V, 0.1V, 0.05V, 0.025V.

The run was started with calibration settings and then the voltage was changed every 2.5-3 minutes.

From the attached plots, it can be seen that everything is as expected. This means that the pulser multipolarity is consistent with front and back strips, pulser signals are more frequent and the pulser amplitude decreases with decreasing V.

The front and back pulser tests have been done with separate runs and the settings have been reverted to their original values (100 Hz, 2V, pulser is off).

  54   Fri Aug 11 09:11:04 2023 AnniePulse Settings
  57   Fri Aug 11 10:12:02 2023 AnniePressure, voltage and current check
ELOG V3.1.4-unknown