AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 1 of 5  ELOG logo
Entry  Mon Jul 31 10:21:41 2023, Nikolay Sosnin, n_TOF Data and Filtering Al26_Filtering.pptx
Entry  Wed Feb 12 13:51:02 2025, CLW, expected counts B and Li 6x
Entry  Mon Jul 21 10:30:01 2025, Selin, The 2D Energy Spectrum of Ca41 Screenshot_from_2025-07-21_08-51-09.png
Entry  Thu Oct 6 09:34:30 2022, Claudia, Test setup Photos and cabling 20221005_174742.jpg20221005_174759.jpg20221005_184752.jpg20221005_184801.jpg20221005_174742.jpg
Entry  Thu Aug 10 11:30:32 2023, Nikolay Sosnin, Silicons and LiF3+Gafchromic Target 18x
Entry  Fri Jun 20 09:49:11 2025, CLW, Silicon detector setup description SiliSetupEAR2.pdf
Entry  Sat Oct 8 11:56:49 2022, Nikolay Sosnin, Silicon Strips of Concern 
Entry  Fri Jul 11 09:16:18 2025, TD, Silena 7710 Quad Bias Supply manual and internal configuration Silena_7710_quad_bias_supply.pdf
Entry  Fri Aug 11 13:06:54 2023, Annie, Signal Spreadsheet info IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG
Entry  Fri Sep 2 12:03:40 2016, Sarah, SPD card changed 
Entry  Wed Jul 16 08:55:22 2025, Selin, Run221141 Boron Uncalibrated Data B_Strip1.pngB_ded_2d.pngB_Strip22.png
Entry  Wed Jul 16 08:51:06 2025, Selin, Run221136 Lithium Uncalibrated Data Li_Strip1.pngLi_Strip1_Par.pngLi_ded_2d.png
Entry  Sat Jul 12 10:30:06 2025, Francisco García Infantes, Report Experimental SetUp Ca41 Experimental_Setup_Ca41.pdfCurrent_Value_Voltage_-15.jpegCurrent_Value_Voltage_15.jpegLeakage_Current_Detector.jpeg
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
Entry  Fri Aug 11 09:11:04 2023, Annie, Pulse Settings IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG
Entry  Fri Aug 11 10:12:02 2023, Annie, Pressure, voltage and current check IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG
Entry  Fri Jul 18 12:04:36 2025, CLW, Presence at CERN 
ELOG V3.1.4-unknown