AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
nToF, Page 1 of 5
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
91 Entries
Goto page 1,
2
,
3
,
4
,
5
Next
All
Selected entries:
ID
Date
Author
Subject
Text
44
Mon Jul 31 10:21:41 2023
Nikolay Sosnin
n_TOF Data and Filtering
81
Wed Feb 12 13:51:02 2025
CLW
expected counts B and Li
The rootfiles countsB.root and countsLi.root
contain histograms of count spectra that
would be expected at n_TOF for a 10B and
6x
95
Mon Jul 21 10:30:01 2025
Selin
The 2D Energy Spectrum of Ca41
The 2D energy spectrum of Ca41 (36 runs). The
expected alpha energies are 4.8 MeV (alpha_0)
and 2.7 MeV (alpha_1).
30
Thu Oct 6 09:34:30 2022
Claudia
Test setup Photos and cabling
Setup 5.10.22
dE 20 um (ID 2837-33) and 494 um
double sided (ID 1194-9)
51
Thu Aug 10 11:30:32 2023
Nikolay Sosnin
Silicons and LiF3+Gafchromic Target
18x
83
Fri Jun 20 09:49:11 2025
CLW
Silicon detector setup description
36
Sat Oct 8 11:56:49 2022
Nikolay Sosnin
Silicon Strips of Concern
DEED 6 and 9 no signal throughout the campaign.
EFED 27 high oscillations in baseline
throughout the campaign.
85
Fri Jul 11 09:16:18 2025
TD
Silena 7710 Quad Bias Supply manual and internal configuration
Manual - see attachment 1
58
Fri Aug 11 13:06:54 2023
Annie
Signal Spreadsheet info
Spreadhseet made for shifters to manually
enter that they have checked each signal
and that they can see gamma-flashes. It is
26
Fri Sep 2 12:03:40 2016
Sarah
SPD card changed
14 bit card replaced for DEED 9-12, to
prevent issue with pulser arriving before
gamma flash.
90
Wed Jul 16 08:55:22 2025
Selin
Run221141 Boron Uncalibrated Data
Plots of Boron #1 run (221141) from
the Ca41 campaign with the right voltage
applied (11.07.2025).
89
Wed Jul 16 08:51:06 2025
Selin
Run221136 Lithium Uncalibrated Data
Plots of Lithium #3 run (221136) from the
Ca41 campaign with the right voltage applied
(11.07.2025).
86
Sat Jul 12 10:30:06 2025
Francisco García Infantes
Report Experimental SetUp Ca41
I'm attaching a report for the experimental
setup so far.
There is a main problem which haven't
62
Mon Aug 14 11:00:13 2023
TD
RAL108 +/-15V PSU test in ISOLDE hall
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE
13x
63
Tue Aug 15 10:17:39 2023
TD, NS
RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August
On the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether
7x
67
Mon Aug 21 12:08:59 2023
TD
RAL108 +/-15V PSU test - JCMB 21.8.23
PSU Calex
Setup, PSU and ac mains filter - attachments
13x
66
Sat Aug 19 14:14:26 2023
TD
RAL108 +/-15V PSU test - JCMB 18.8.23
PSU Calex
Setup and PSU details - attachments 1-3
10x
54
Fri Aug 11 09:11:04 2023
Annie
Pulse Settings
57
Fri Aug 11 10:12:02 2023
Annie
Pressure, voltage and current check
94
Fri Jul 18 12:04:36 2025
CLW
Presence at CERN
Excel sheet for presence at CERN during
41Ca run. Please update if required.
https://docs.google.com/spreadsheets/d/19OzH7bpnHb-YeOskNBGlrhEkPZmDsPDw9y0tleU0Soo/edit?gid=0#gid=0
Goto page 1,
2
,
3
,
4
,
5
Next
All
ELOG V3.1.4-unknown