Entry  Tue Feb 17 06:32:24 2015, CG, AE, TD, Tues 17th Feb progress 22x
17/02/15
1515: Installed detector BB18 2977-7 with 3 modified kapton cables, one unmodified (in nnaida1) with 207Bi source.
           Bias voltage @ -100V with leakage current -11.6uA @ ambient temp of ~20oC.
Entry  Thu Sep 18 11:18:46 2014, Patrick Coleman-Smith, Trying the Liverpool HV supply 
The SY1527 supply was delivered with three modules.
A cable has been made with LEMO00 connectors to connect to the detector adaptor HV inputs.
The SY1527 needed an external VGA display and ps2 keyboard. The software appears to be windows 98 based and won't boot until the bios is told to
Entry  Thu May 5 14:44:48 2016, Patrick, Trigger selection explanations Explanations_for_the_Trigger_selections_in_AIDA.pdf
Please request more information if the attached is not clear.
Entry  Thu Oct 2 15:23:38 2014, Patrick Coleman-Smith and Chris Griffin, Trial with Filtered AIDA PSU 
Assembled three more of the filter boards and installed them in the AIDA PSU with the first, wired to use the switchmode power supply.
Powered up nnaida14 first and went fine. Just the boot sequence and measure the voltages for stability.
Powered up the remainder and all was well.
Entry  Sat Apr 18 09:30:11 2015, CG, To do list 19/04/15 - 21/04/15 
To do (roughly in order):

     Move shipped boxes down from Gabor's office to the experimental area. Check contents. Should include:
    
        3x
3Tb HDD
        NIM floating HV supply
        2x Si detector boxes, containing MSL type BB18 detectors 3131-9 + 3131-11 and 3058-9
Entry  Thu Mar 5 12:11:44 2015, TD, To Do list - March 2015 
A draft 'to do' list in preparation for further AIDA tests at RIKEN from mid-April.

Please feel free to add your comments, suggestions, other items etc.
Entry  Thu Jun 1 00:00:25 2017, TD, PV, CB, Thusrday 1 June 08.00-16.00 17x
07.57 run continues
      BRIKEN start run 55
      BigRIPS start run 1066
Entry  Thu May 12 16:55:37 2016, AE, VP, BM, Thursday May 12 7x
Continued work on beta-trigger for EURICA. However the system seems to have different noise condition than before, which 
we think appeared after we changed power source for FEE's PSU (https://elog.ph.ed.ac.uk/AIDA/220). This is high frequency 
noise of low amplitude, with a period of 10 usec.
Entry  Thu Nov 8 00:55:18 2018, CA, CB, TD, OH, Thursday 8th November 14x
09.57 DAQ still running (R29_29)
      System wide checks ok, except nnaida7 ADC calibration failure
      
Entry  Thu Jun 8 08:11:39 2017, NN, PV, Thursday 8 June 16:00 - 24:00 (evening shift) 22x
16:13  DAQ still running

16:34  BigRIPS and BRIKEN stop their DAQ
Entry  Thu Jun 8 00:54:26 2017, OH, PW, Thursday 8 June 00:00-16-00 6x
08:54 DAQ still running

09:01 BRIKEN and BigRIPS stop daqs
Entry  Thu May 7 01:32:39 2015, JA, TD, AE, CG & JLT, Thursday 7 May 2015 
09.25 R69 continues
      100Kr setting, degrader 4mm + 0.4mm (variable) Al
      DSSSD #1 off due to detector failure ( https://elog.ph.ed.ac.uk/AIDA/101 )
Entry  Thu Dec 7 17:30:36 2023, NH, CC, VP, TD, Thursday 7 December 8x

Stack re-assembled - upstream to downstream
Entry  Thu Oct 6 11:16:40 2016, CG & TD, Thursday 6 October 9x

DSSSD bias voltages and leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
Entry  Thu Jun 6 08:55:15 2019, TD, Thursday 6 June 13x
16.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
Entry  Thu May 5 11:10:36 2016, CG,PV,TD, Thursday 5 May 2016  8x
Detector configuration - see https://elog.ph.ed.ac.uk/AIDA/193

Ribbon cable to nnaida19 FEE adaptor PCB disconnected due to noise issues
Entry  Wed Mar 29 18:02:12 2017, OH, TD, DK, CG, Thursday 30th March 31x
02:02 Recovered DAQ from crash. Merger became clogged and the system required a full restart. Raspberry pi also
required a restart to regain control of the USB power relay.
      AIDA R16 started
Entry  Thu May 30 03:13:04 2019, TD, Thursday 30 May 16x

11.13 DAQ continues OK
Entry  Thu Apr 30 01:06:44 2015, JA, LHB, TD, AE, CG & VP, Thursday 30 April 2015 16x
Overnight
      Degrader OUT
      DAQ ran OK - data file R22
Entry  Thu Nov 3 01:25:30 2016, TD, CG, Thursday 3 November 11x
10.20 DAQ found stalled

      DSSSD bias & leakage current OK - see attachments 1 & 2