AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 36 of 46  ELOG logo
Entry  Fri May 13 06:18:53 2016, AE, VP, BM, Friday May 13th 9x
11 am: Changed configuration of power source for AIDA PSU (see paper logbook). Now both cables with power for
USB relay are connected to the 'C' unit of the F11 power supply. They use different socket pads, and share them
with power cables for raspberry pi and NIM crates. Situation intermediate to what we have on Tuesday.
Entry  Thu Nov 8 23:35:50 2018, OH, TD, CA, CB, Friday 9 November 23x
08:36 DAQ still running
      Not writing data to disk
Entry  Thu Jun 8 16:06:21 2017, OH, Friday 9 June 00:00-08:00 9x
00:06 System wide checks all ok
      Bias and leakage currents ok - attachment 1
      Good event statistics - attachment 2
Entry  Fri May 8 01:05:18 2015, JA, TD, AE & CG, Friday 8 May 2015 150.png
08.50 FEE64 temperatures (attachment 1)

09.03 R70 ends OK
Entry  Fri Dec 8 11:32:44 2023, NH, CC, VP, TD, Friday 8 December 18x

Change n+n FEE64 aida04 d8:80:39:41:f6:b7
 asic #1 faulty
Entry  Fri Oct 7 02:29:19 2016, TD & CG, Friday 7 October 22x
10.29 DAQ left running overnight
      Histograms only - no data transfer to Merger & TapeServer
Entry  Fri Jun 7 05:30:23 2019, TD, Friday 7 June 17x
14.05 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers
      Temperature +25.6 deg C dew point +10.3 deg C RH 37.7%
Entry  Fri Nov 4 04:35:03 2016, TD, CG, DK, Friday 4 November part 2 36x
13.35 Swapped HDMI cables from master MACB to MACB #3 & #7
      for HDMI cables from MACB #7 ports 1 & 2 to MACB modules #8 & #9
Entry  Thu Nov 3 17:42:37 2016, TD, CG, DK, Friday 4 November 32x

00.40-02.30 Discussion with PJCS
 
Entry  Fri Aug 4 10:04:58 2023, TD, Friday 4 August contd. 17x

10.45 Power cycle and reboot
Entry  Fri Aug 4 09:07:08 2023, TD, Friday 4 August 23x

07.00 DAQ stopped
      Overnight run for background alphas
Entry  Fri May 31 03:31:54 2019, TD, Friday 31 May 14x
11.31 DAQ continues OK

      ASIC settings 2019May19-17.54.03
Entry  Fri Sep 30 03:35:12 2016, TD, Friday 30 September 20.png21.png22.png23.png24.png
11.37 Attempt to use external 50MHz clock for Master MACB (w/ 50MHz front panel label)

      NIM 50MHz -> NIM-TTL translator -> Master MACB (rear panel)
Entry  Thu Nov 2 22:57:53 2017, OH, Friday 3 November 031117_0758_bias.png031117_0759_bias.png031117_0759_stats.png
10.56 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Fri Jun 3 03:10:55 2016, TD, AE, CG & DK, Friday 3 June 2016 12x
11.00 Detector biases and leakage currents - see attachments 1-2
  
      FEE64 temperatures - see attachment 3
Entry  Fri Jun 29 02:26:34 2018, OH, Friday 29 June 180629_1026_bias.png180629_1028_feetemp.png180629_1445_bias.png180629_1954_bias.png
10:27 Bias and leakage currents ok - attachment 1
      Fee temperatures ok - attachment 2
      Temperature 24.7C, Humdidity 44.5%, D.P +11.8C
Entry  Fri Apr 29 11:11:20 2016, CG,PV,TD, Friday 29 April 6x

MSL type BB18 serial # 2977-20 bias +100V I_L +12.0uA T=23 deg C
(biased by nnaida # 3 & 5 )
Entry  Fri Sep 28 02:08:07 2018, OH, TD, Friday 28 September 6x
10:08 Normal system restart ok
      System currently in 8DSSD configuration as was left in June 2018
Entry  Fri Oct 28 06:12:50 2016, TD, Friday 28 October 12x
14.12 DAQ stalled as expected
      Most recent file R86_245 last accessed 06.26
Entry  Fri Oct 27 01:58:44 2017, TD, OH, Friday 27 October 12x
09.56 DAQ stopped OK yesterday

      BNC PB-4
ELOG V3.1.3-7933898