  727   Wed Jun 27 02:23:03 2018 OHWednesday 26 June10:20 Bias and leakage currents ok - attachment
1
      FEE temperatures ok
 180628_1023_Bias.png180628_1023_Bias.png180626_1527_feetemps.png 
  145   Wed Jan 27 14:54:48 2016 TD, CGWednesday 27 January 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature
+20.2 deg C
 11.png14.png 
  360   Wed Sep 28 06:40:40 2016 TD & CGWednesday 28 September14.40 AIDA power up

      Julabo FL11006 set point +20 deg C
 1.png2.png3.png4.png 
  78   Wed Apr 29 01:03:41 2015 JA, LHB, TD, AE, CG & VPWednesday 29 April 2015Overnight
      Beam tuning, PID tests - beam stopped
in scintilator detector + 1" thick Pb bricks
 16x 
  80   Wed Apr 29 11:00:29 2015 TDWednesday 29 April 2015 - R20 screenshots1230: Attachments 

19.00 Screenshots taken during R20
 10x 
  539   Wed Mar 29 00:02:49 2017 TDWednesday 29 March08.02 DAQ halted overnight

      System checks OK *except* for nnaida1
 21x 
  819   Wed May 29 06:11:34 2019 TDWednesday 29 May14.10 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 12x 
  747   Wed Oct 3 01:48:21 2018 OH, TDWednesday 3 October09.42 DAQ continues OK - current file Sep18/R2_36

09.42 all system wide checks OK *except*
 30x 
  498   Tue Nov 29 15:12:33 2016 CG, AE, TD, DKWednesday 30 November00.11 Beam stopped for target @F8 change.
      R35 stopped at R35_62.
      BRIKEN file 161129_1951 155->159
 13x 
  615   Tue May 30 16:05:12 2017 OHWednesday 31 May 00:00 - 08:0000:05 BigRIPS and BRIKEN stop their daqs
      AIDA currently on file R1_312
 9x 
  616   Wed May 31 00:02:41 2017 VP, CBWednesday 31 May 08:00 - 16:0008:02 BRIKEN starts run 1032
      BigRIPS starts run 31
      AIDA on file R1_423
 10x 
  617   Wed May 31 08:00:26 2017 NN, CBWednesday 31 May 16:00 - 24:0016:30  Check online data ok (R1_533) see attachment
1
 15x 
  755   Wed Oct 31 00:18:12 2018 TD, OH, CAWednesday 31 October09.18 DAQ continues OK - current file Oct18/R10_7
      alpha background run
 20x 
  203   Wed May 4 03:01:15 2016 TDWednesday 4 May 2016
10.30 Power up.
Normal DAQ startup.
 11x 
  829   Wed Jun 5 06:57:38 2019 TDWednesday 5 June14.50 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 13x 
  370   Wed Oct 5 07:29:29 2016 CG & TDWednesday 5 October (inc AIDA+BRIKEN photos)14.30 Adjusted and checked insertion of AIDA
snout into BRIKEN (CH2)n moderator.
      up-down    AIDA snout appears centred
 11x 
  101   Tue May 5 16:40:23 2015 JA, TD, AE, CG & JLTWednesday 6 May 201500.00 Degrader changed to 4mm + some of variable
(need to confirm)
      Extra 1mm removed.
 140.png 
  641   Wed Jun 7 00:10:24 2017 NN, TDWednesday 7 June 08:00 - 16:0008:12    Analysis of file RIBF128/R6_438 -
zero timewarps, four MBS timewarps - see
attachment 1
 30x 
  642   Wed Jun 7 08:02:42 2017 OH, PVWednesday 7 June 16:00 - 24:0016:02 System wide checks ok
      Good Events statistics (No beam at
time!)- attachment 1
 15x 
  768   Wed Nov 7 01:00:58 2018 CA, CB, TD, OH, PJWWednesday 7 November10.02 DAQ still running, on file Oct18/R27_9
      Merger and TapeServer ok, no error