AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 14 of 21  ELOG logo
ID Date Author Subject Text Attachments
  154   Tue Nov 22 09:26:04 2016 A. Tarifeno-SaldiviaNoise checkRun for checking the noise just after turn
on the crates, without high voltages on the
PREAMPS.
 161122_1820_000_BRIKEN.svg 
  153   Tue Nov 22 08:28:36 2016 A. Tarifeno-Saldivia et alNew directory and Config FileA new directory in the IFICdaq computer has
been created for the parasitic measurements
during the Fallon Beam Time.
  
  152   Sun Nov 20 13:02:06 2016 Jorge, Alavaro, JoseDACQGasific-7.0 Short Manual (Preliminary)  Gasific70Manual.pdf 
  151   Sun Nov 20 12:28:27 2016 Jorge, Alvaro, JoseDACQUpdated run protocol  GasificShort.pdf 
  150   Fri Nov 11 08:07:18 2016 BCR SG NTBBRIKEN Hit VisualizationThese are the files used to create and
visualize the hit patterns of the BRIKEN
detector.
 HybridBRIKENPhysicalHistogram.cppHybridBRIKENPhysicalHistogram.hppHybridBRIKEN_Tube_Info_1.txt 
  Draft   Thu Nov 10 05:05:54 2016 KMHow to convert ridf-file to root-file1. Login to briken@ribfana03.riken.jp

2. Check if the ridf-file you want
to convert is in the directory; /home/briken16/rawdata/bigrips/
  
  148   Wed Nov 9 02:02:22 2016 IrisBoron rubber from IndiaThe boron rubber from India is BR-2871, price
US-$ 2700 for 2pc 1m x 2m x 3.3mm.
52% B content, density 1.61 g/cm3
 BPE2_Clr.jpgquotation_220213.pdfflex_boron_2871.pdf 
  Draft   Wed Nov 9 01:04:35 2016 IrisDrawing of present setupThis is the setup which was used for the Ni
runs (from Nov. 8th evening on).
 Setup-161109-Takechi.pdf 
  146   Wed Nov 9 01:02:53 2016 IrisElogFrom Nov. 9th on we use the Takechi ELOG for
the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ 
  
  145   Tue Nov 8 17:00:27 2016 NTB, CG, ATSi Delta EAt least during the timeframe in between
~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root)
we see that the silicon dE have a very low
  
  144   Tue Nov 8 15:10:24 2016 Many717273Ni RunF7 OUT F11 C-6mm

Start: 00:09
  
  143   Tue Nov 8 14:28:54 2016 Many717273Ni runF7 CH2 F11 C-6mm
Total degrader thickness 6mm
  
  142   Tue Nov 8 13:49:58 2016 Many71,72,73NiF7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN
  
  141   Tue Nov 8 12:51:08 2016 Many717273Ni After removing the lead wall.

Start: 21:45
  
  140   Tue Nov 8 12:30:33 2016 Tain, Ale (who are not on shift)71,72,73Ni run71,72,73Ni  run

We started at approximately 21:00, only online,
  
  139   Tue Nov 8 11:51:28 2016 Alespikes on some spectraSome spectra show spikes or do not look normal.
This should be checked.
  
  138   Tue Nov 8 08:49:51 2016 Tain et alMove ELOGWe will start to use the internal RIKEN ELOG
It is not clear that we can keep the present
ELOG also updated
  
  137   Tue Nov 8 08:31:52 2016 Tain et al424344Ca runSequence of settings:
1) No target at F7 and Empty target at F11
(up to t=1E6ms)
  
  136   Tue Nov 8 06:39:25 2016 Tain. IrisDrawing of present setup

Attached is the present setup including all
 Full_BRIKEN_Setup-includingTakechi.pdf 
  135   Tue Nov 8 06:13:11 2016 Tain et alNew plastic detector in F11There is a new plastic scintillator
after the MUSIC chambers
 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg 
ELOG V3.1.4-unknown