AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 13 of 21  ELOG logo
ID Date Author Subject Text Attachments
  174   Sat Nov 26 16:21:08 2016 Briken collaboration41Al run 2-1513:08 Beam is still OFF. Background acquisition
is started.
Degrader:
  
  173   Sat Nov 26 09:31:05 2016 Gabor Kiss, Ariel Tarifeno, Alvaro TolosaOutput signals from G7RedPreamplifier of crystal G7Red was replaced.

Output signals from G7Red are weird.
 G7red_01.svg02.svg03.svg06.svg 
  172   Sat Nov 26 06:37:37 2016 AT41Al run 111:07  New acquisition is started for tungsten
degraders 
1mm W + 1mm Al
  
  171   Sat Nov 26 06:30:30 2016 ATSetupSetup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u
  
  170   Sat Nov 26 00:15:12 2016 AT41Al run008:15    BigRips tunning for centering 41Al.
Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
 161126_0815_000_RateBRIKEN.svg 
  169   Sat Nov 26 00:04:15 2016 ATElogRIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
  
  168   Fri Nov 25 23:18:04 2016 BRIKEN collaborationFallon Parasitic experiments=====   START OF PARASITIC EXPERIMENTS  ======   
  167   Fri Nov 25 21:50:42 2016 ATNew Conf File161125Conf_BrikenFull.xlsx   
  166   Fri Nov 25 21:49:36 2016 ATBackground Beam OFF21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
  
  165   Fri Nov 25 21:48:49 2016 ATDACQ19:00  Test calibration    
  164   Fri Nov 25 21:47:05 2016 ATBackground Beam OFF16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after
 161125_1617_017_BRIKEN.svg161125_1617_017_RateBRIKEN.svg 
  163   Fri Nov 25 03:49:44 2016 ATBackground Beam ON16/11/25 12h28min: Background measurement
beam ON 19B
  
  162   Fri Nov 25 03:41:40 2016 ATRun setupsRun setups during preparation of Fallon Parasitic
experiments (Kanungo experiment beam time)
can be found on 
 RUNsum_kanagoda.pdf 
  161   Fri Nov 25 03:37:23 2016 ATBackground Beam OFF/ON16/11/24 21h06min: Background measurement
Beam OFF + Beam ON tunning and 22C
 161124_2106_013_BRIKEN.svg161124_2106_013_Rings.svg161124_2106_013_RateBRIKEN.svg 
  160   Fri Nov 25 03:15:46 2016 AT Background Beam ON16/11/24 19h38min:  
Background measurement during tunning of
BigRips from 27-29F to 22C is started.
  
  159   Thu Nov 24 14:57:55 2016 ATBackground Beam ONStarting from today 12:22, the background
generated by the different setups on BigRips
is monitorized.
 161124_1222_010_BRIKEN.svg161124_1222_010_RateBRIKEN.svg 
  158   Thu Nov 24 14:36:27 2016 AT252CfCheck of calibrations and rates for neutron
detectors with Conf File 161107Conf_BrikenFull.xlsx
 CalibrationCheck_161122.xlsx 
  157   Thu Nov 24 02:30:56 2016 CGRIBF123R1 Local ELogsPDFs of the local ELog for the RIBF123R1
experiment Nov 2016
 9x 
  156   Tue Nov 22 10:22:07 2016 PV, LiuNo current observed when turning on the HV for the D4 Clover19:00
We've turned on the High Voltage for the
D4 Clover up to ~ 1.5 kV. 
  
  155   Tue Nov 22 10:17:57 2016 ATS, PV, LIU252CfMeasurement with 252Cf at Z=22.5cm from the
moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
 161122_2208_003_BRIKEN.svg 
ELOG V3.1.4-unknown