ID |
Date |
Author |
Subject |
215
|
Wed Mar 29 18:42:25 2017 |
RCF | 40Mg Run 003 |
Date: 30/03/2017
Start: 02:39
BRIKEN run: 003
AIDA Run: R16_5
BigRIPS run: 144
DLT: 170330_0239_Mg40_003.dlt
BRIKEN Rate: 4cps
F11 Rate: 12
(First part of the run in the rate histogram was overlapping the previous data. The reason is not understood).
Date: 30/03/2017
Stop: 03:27
BRIKEN run:003
AIDA Run:R16_21
BigRIPS run:145 (just started)
Online not erased.
Root file:170330_0216_0326_B003_Mg40.root (accumulated with previous root)
Syncronization terminals on screenshots to compare with previous run. Due to the updates on each terminal are not with the same frequency it is hard to observe in the screenshots, but on live seems to be constant. |
214
|
Wed Mar 29 18:16:58 2017 |
RCF | 40Mg Run 002 |
Date: 30/03/2017
Start: 02:16
BRIKEN run: 002
AIDA Run: R16_4
BigRIPS run: 143
DLT: 170330_0216_Mg40_002.dlt
BRIKEN Rate: 6cps
F11 Rate: 13
Date: 30/03/2017
Stop: 02:38 (bigrips started new file 15 minutes ago)
BRIKEN run:002
AIDA Run:R16_5
BigRIPS run:144
Online not erased since JL left. Just Start File.
Root file: HISTOGRAMS NOT SAVED FOR THIS RUN
Observation: AIDA recovered at 02:15
Synchronization plot not generated. Some screenshots rom terminals attached. AIDA terminal has additional messages and between both terminals (AIDA/BIGRIPS) there is a constant offset apparently. |
213
|
Wed Mar 29 17:15:21 2017 |
JLT | New Config file |
New configuration file:
170330_Conf_BrikenFull.xlsx
Tha gain of F11_PL TFA was changed from x2 to x4
In Conf file histogram ranges were changed for
F11_PL_L and _R: 30 MeV
F11_PL_L_HG and _R_HG: 200 MeV
Si_T and _B: 200 MeV
the gain for F11_PL_* was changed to 0.0025 (x2)
Thhe gain for Si_* was changed to 0.0007 (x10)
A new gated spectrum was added: F11RgateSiT |
212
|
Wed Mar 29 15:16:17 2017 |
Many | 40Mg Run 001 |
Date: 29/03/2017
Start: 23:13
BRIKEN run: 1
AIDA Run: R13_36
BigRIPS run: 141
DLT: 170329_2213_Mg40_001.dlt
BRIKEN Rate: 6cps
F11 Rate: ?
Date: 30/03/2017
Stop: 00:18
BRIKEN run:001
AIDA Run:R13_52
BigRIPS run:141
Previous online not erased
Root file:170329_2213_0018_B001_Mg40.root
Observation: AIDA crash at 23:59 |
211
|
Wed Mar 29 14:14:58 2017 |
Many | 40Mg RUN 000 |
Date: 29/03/2017
Start: 22:13
BRIKEN run: 0
AIDA Run: R13_18
BigRIPS run: 140
DLT: 170329_2213_Mg40_000.dlt
BRIKEN Rate: 6cps
F11 Rate:
Stop: 23:10
BRIKEN run: 0
AIDA Run: R13_35
BigRIPS run: 140
Root file: 170329_2213_2310_B000_Mg40.root
Observations:
- We should increase the gain of F11 plastic (now a bit to small)
say by a factor of 2. Calibration is probably wrong!? |
210
|
Wed Mar 29 13:31:37 2017 |
J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL Tain | Start of parasitic |
Start of parasitic Ca beam
(main experiment "New isotope search", Ahn et al.)
New directory: /data/1703Ahn/
Configuration file: 170329_Conf_BrikenFull.xlsx |
209
|
Wed Mar 29 11:02:40 2017 |
PV, Liu, JA, JLT | F11 plastic |
New calibration of F11 plastic
We decided to have both a low gain and a high gain
for F11 plastic dividing the signal from the TFA
with a "T" and using in one branch a 20db attenuator (reduction by 10)
and sending to two different DACQ channels.
The gain of the TFA was also reduced to x2
V1A7C3: F11_PL_R (Low gain: ~60MeV)
V1A7C4: F11_PL_L
V1A7C5: F11_PL_R_HG (High gain: ~600MeV)
V1A7C5: F11_PL_L_HG |
208
|
Wed Mar 29 07:34:16 2017 |
J. Agramunt | BrikenTools repository installed at d05 |
The last version of Briken tools repository has ben installed at d05, this repository includes the Merger and the BrikenOffline codes, as well as a CommonTools folder to share scripts and code.
For update versions, just type in the desired directory "svn update". |
207
|
Wed Mar 29 03:02:02 2017 |
J. Agramunt | Synchronization test procedure (update) |
To Launch the processes:
Open 4 terminals:
Terminal 1 (DataSink) type:
>ssh aida@d05
>cd /home/aida/DataPackage/DataSink/Linux64
>DataSink -i 3
Terminal 2 (SynCheck) type:
>ssh aida@d05
>cd /home/aida/SyncCheck
>./SynCheck
Terminal 3 (BigRIPS Data Relay) type:
>ssh aida@d05
>cd /home/aida/ribfts/ribftssender
>./ribftssender_mar17ca debug
(specific for current 40Ca parasitic run because we are not sending
a pulse signal to BigRIPS as trigger but receiving triggers from
BigRIPS to create the pulses)
Terminal 4 (AIDA Data Relay) type:
>npg@aidas1
>DataRelayFilter -n 10.32.0.12 -p 10307 -I 2
"-I 2" selects ID 2 as the one for the AIDA data stream,
which must correspond to the one expected by the DataSink in the d05 PC.
The programming transmitting the data from AIDA to the DataSink includes an
intermediate filtering step. This selects only correlation scalers from one
module (and possibly ADC values from one channel in that module).
Gasific MainWindow (Briken Data Relay):
In the DAQ Control tab: Click "Start Sync Monitoring" button.
In the pop up window set server ip and port (ip:10.32.0.12, port:10305)
By default this perform a check on the differences RIBF-BRIKEN and AIDA-BRIKEN.
In case that BRIKEN is not running, the option "SynCheck -M 1" check the differences
AIDA-RIBF and BRIKEN-RIBF, while "SynCheck -M 2" checks RIBF-AIDA and BRIKEN-AIDA
To synchronize:
In the Gasific MainWindow, DAQ Control tab: Click "Send Sync Pulse" button |
206
|
Tue Mar 28 17:02:19 2017 |
DK | Applying Biases |
Today, Gabor and I discussed with Nathan from ORNL about the biasing system used for Ge, 3He, Plastic, and others. Phong is also a bit familiar with the system (edit also
Shintaro
Go). While there
is supposed to be a manual, Gabor and I did not find it.
In case of trouble: contact Nathan Brewer Gmail: Brewer.nathant@gmail.com Skype: nathan.t.brewer
Log in to high voltage PC:
$ ssh -Y pixie16@10.32.6.161
passwd: ************
For HV readout, run firefox in the background
$ firefox &
You can probably check the history or restore pages, but it should be pointed
at 192.168.13.239
It updates automatically every several seconds. Unless the HV monitor is
running, it may show nothing...
For temperatures:
$ cd ~/DAQ_1/kelvin
$ ./kelvin-read
(there are options to kill all temperatures)
For applying existing HVs (BE CAREFUL!)
$ cd ~/DAQ_1/hv-mpod
$ ./hvmon
If you want to change the voltages (up or down) kill this with Ctrl+C
To alter bias values or change which ones are on, you can edit the file:
$ ~/DAQ_1/include/hvmon.conf
Once the file is saved, restart hvmon.
We are running the above in a GNU screen session, with firefox on one computer. It has a note taped to it. Please don't use this computer for other purposes unless necessary!
Let me note that the PC we log in through has essentially no .screenrc file so you can barely understand you are actually using screen. If you are not very familiar with
screen, better not to touch it. I will put a better .screenrc later (but I also don't want to change the setup now).
28 Mar 2017 15:47:31
Ge voltage application
LN2 filling was done yesterday before lunch
D is the beam left side Ge
MPOD name
U300 D4K
U301 D4R
U302 D4G
U303 D4B
83.7 K, with 300 V
G is the beam right side Ge
MPOD name
U304 G7K
U305 G7R
U306 G7G
U307 G7B
79.6 K with 250 V (except G7R at 300 V)
All analog signals are seen in the oscilloscope with reasonable behavior
28 Mar 2017 15:56:03
Ramp up all Ge clovers.
D at 3000 V for all
G at 2500 V for all (except G7R is 3000)
28 Mar 2017 16:26:39
Biases are all applied (maybe several minutes earlier)
D4 temp 83.7 K
G7 temp 79.6 K
28 Mar 2017 17:51:09
Now we ramp up 3He and plastics. We keep the Ge on during this time.
D4 83.7 K
G7 79.6 K
Everything looks good! |
205
|
Tue Mar 28 09:10:09 2017 |
Many | 152Eu |
152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration with 60Co source.
File: 170328_1707_152Eu_CloverCal.root
Calibration parameters in file:
170328_1707_CloverCalibration.ods
(attached) |
204
|
Tue Mar 28 06:56:15 2017 |
PV, Liu, JA, JLT | F11 Plastic |
Calibration of new F11 plastic
(see photo)
The new plastic is 1mm thick instead of 0.2mm used last year.
Dimensions:120mm x 100mm x 1mm
HV applied: -1800V
Anode signal connected to Ortec 474 TFA
Gain: 20 x minimum; Int: 200ns; Diff: 100ns; Invert
60 Co source
THIS WAS WRONG! POLARITY OF SIGNALS WAS REVERSED.
***************************************************************
*File: 170328_1507_F11PL_60Co.root
*See attached wrong picture 170328_1507_F11_PL_RandL.pdf (R:Red, L:Black)
*
*Calibration (Gain=20):
*V1C7C3_EFIR (R): Peak(<E>=1.25MeV):2077.1 -> a1=0.0006028 MeV/u
*V1C7C4_EFIR (R): Peak(<E>=1.25MeV):1924.0 -> a1=0.0006507 MeV/u
***************************************************************
CORRECT SPECTRUM:
File: 170328_1838_F11PLCal.root
Picture: 170328_1838_F11PLCal.pdf
*************************************************************
Stopping power calculation (SRIM):
50 MeV/A 40Mg: S=102*1.184=120.8 MeV/mm
100 MeV/A 40Mg: S=102*0.7129= 72.7 MeV/mm
(Later: according LISE simulations energy loss of 40Mg is 88MeV)
What is the energy loss of the "light" particles? |
203
|
Mon Mar 27 11:53:15 2017 |
PV,Liu | Turn on dE detector |
We applied a bias voltage of 100 V to the dE detector
Current read = 0.660 uA
compare with https://elog.ph.ed.ac.uk/BRIKEN/190. it is slighly lower.
Attachment 1-2: signal and noise level from Co60 source for the dE top
Attachment 3-4: signal and noise level from Co60 source for the dE bottom
|
202
|
Mon Mar 27 09:32:55 2017 |
JLT JA CG OH DK TD RC VP GK LJ SN | 252Cf |
252Cf at the center for BRIKEN calibration
Start: 17:31
Stop: 18:00
File: 170327_1800_252Cf.root
3He tube calibration done with script BrikenCal.cpp
Result stored in 170327_1800_252Cf_Cal.ods (attached)
After visual superposition of all spectra we decided
to change only the parameters of He003 and He133
in the new calibration file. |
201
|
Mon Mar 27 03:50:13 2017 |
JLT JA CG OH DK TD RC VP SN | Background |
Background measurement while they play with the beam.
Start: 11:40
Stop: 16:40
File: 170327_1640_Background.root
There seems to be a second component of noise or background
above 50keV which was not there yesterday.
Beam related? |
200
|
Sat Mar 25 13:42:23 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero | Background |
BRIKEN system powered and DACQ started after movement.
All looks fine.
Background measurement:
Start: aprox 12:00
Stop: 22:24
File: 170325_2224_Background.root |
199
|
Sat Mar 25 13:33:12 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero | BRIKEN+AIDA relocated |
We moved AIDA+BRIKEN by 107cm upstream.
See attached photos.
BRIKEN was aligned with the laser and
AIDA aligned to BRIKEN. |
198
|
Fri Mar 24 03:28:39 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Background |
Background measurement overnight
Start: 19:45
Stop: 10:40
File: 170324_1040_BackgroundOvernight.root |
197
|
Thu Mar 23 10:03:51 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | 252Cf |
252Cf source at the center for calibration
23/03/2017
Start: 19:02
Stop: 19:38
Root file: 170323_1902_1938_252Cf.root |
195
|
Thu Mar 23 09:30:58 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Power-up and 1st spectrum |
Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
DACQ configuration file: 170323Conf_BrikenFull.xlsx
(copied from from 161125Conf_BrikenFull_23.16.xlsx)
Short background run: 170323_1841_Background.root.
Neutron spectrum looks OK (see attached graph)
All the tubes look Ok. |