AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 11 of 21  ELOG logo
ID Date Author Subjectdown Text Attachments
  335   Sat Oct 21 07:26:13 2017 NB, RY, BD, MSCorrected Calibration D4  K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
 D4Oct19.ods 
  175   Sat Nov 26 16:54:17 2016 AT & ATCloversCalibration of clovers   
  300   Thu May 25 13:38:11 2017 AT, PC, KR, JLT, AAClover, detectors in new positionBoth clover detectors were moved. They are
in a symmetrical position. The end on the
clover nose is of the order
 CLOVER-sketch.jpgD4-insertion.jpgG7-insertion.jpg 
  298   Thu May 25 12:53:47 2017 AT, PC, JLT, KR, AAClover, 60Co60Co source 

Source ID: CD395
  
  297   Thu May 25 12:49:55 2017 AT, JLT,PC,AAClover, 133Ba, LN2 fillingWe started the measurement of the source when
the N2 filling started. Just to  check if
there are funny things
  
  341   Sun Oct 22 08:52:17 2017 KR,JA,ATD,JLTClover resolutionResolution check using 40K 1460 keV line 
in the background measurement overnight
(File: 171022_0126_1101_bck.root)
  
  406   Mon Nov 5 06:46:30 2018 KR, YR, MW, JLT, ...Clover check
With detectors still on the floor we check
signals and found
 Screenshot_from_2018-11-05_15-57-40.pngScreenshot_from_2018-11-05_16-23-12.png 
  331   Wed Oct 18 08:46:23 2017 NB, SG, AT, JLClover G7 resolutionG7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
 171018_1627_152Eu_G7.root 
  317   Mon May 29 04:17:34 2017 YSClover EfficiencyClover gamma detection efficiency calculation
with 152Eu
Date of the measurement: 2017-05-26 10:15
 eff_crystal.pdfeff_total.pdfEURICA_efficiency.jpg 
  340   Sun Oct 22 05:15:26 2017 RG,RY,MS,ATD,JA,JLTCheck of YSOWe start a systematic check of YSO in BRIKEN
DACQ
 12x 
  21   Tue May 5 05:04:00 2015 J.L. Tain, J. Agramunt, G. KissChange of degrader thicknessFor EURICA measurements degrader thickness
were increased
trying to decrease MACI and AIDA trigger
  
  347   Tue Oct 24 13:14:47 2017 RYCalibration data for cloversfor energy calibration with 152Eu source

171024_1858_152Eu_G7.root
171024_2112_152Eu_D4.root
 171024_1858_152Eu_G7.root171024_2112_152Eu_D4.root 
  332   Fri Oct 20 05:33:11 2017 KR, NB, SG, RY, JL, AT: Calibration and Resolution of D4 (after Repair) Green and Red channels were repaired by
crimping and securing the grounding of the
cables and fixing the cables securely to
 IMG_20171019_105549066.jpgD4Oct19.ods 
  86   Fri Oct 14 04:12:50 2016 JL Tain et alCONFNew configuration file: 
161014Conf_BrikenFull.xlsx
  
  299   Thu May 25 13:24:02 2017 AT,PC,KR,JLT,AACLOVER, detector not in its rigth positionWe have noticed that D4 is not in its right
position. That explains the different number
of counts in the
  
  295   Thu May 25 09:51:37 2017 A.T, A.ACLOVER, Ba133Source details:

Diameter: 25.05 mm
 170525_133Ba_D4_D4pulser.png 
  306   Fri May 26 03:52:23 2017 AT,AA,JLTCLOVER, 137Cs137Cs, No AIDA, Efficiency calibration

Source ID: 393
  
  296   Thu May 25 10:15:02 2017 A.T, G. K, A.M, A. ACLOVER, 133Ba no pulser
Source in position z=0 with the carton (cardboard)
high-end, high-tech holder, but no AIDA (of
  
  305   Fri May 26 03:24:38 2017 GK,VP, AT, AACLOVER, 133Ba133Ba source efficiency calibration, no AIDA

Start: 11:23
  
  316   Sun May 28 11:41:24 2017 YSCLOVER energy calibrationClover calibration with 152Eu

Used peaks [keV]: 121.7817, 244.6975, 344.2785,
  
ELOG V3.1.4-unknown