AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 10 of 21  ELOG logo
ID Date Author Subjectdown Text Attachments
  87   Fri Oct 14 04:42:40 2016 JL Tain et alElectronicsChange of main power line for MPOD and CLOVER
preamp
 D4All-CsCo-zoom-newlineCL.pdfBRIKEN-newlineCL.pdf 
  55   Wed Jul 20 16:55:48 2016 K.Gabor, K. Matsui, A. TarifeņoElectronicDrying of preamplifiers

PA8, PA9 and PA10 are removed and brought
  
  100   Wed Nov 2 02:26:22 2016 Roger CaballeroEfficiency callibration calculator (Excel file)Attached the updated excel file. In the first
sheet there is the calculator to calculate
the efficiency from an given energy.
 cloversEff.xls 
  97   Tue Nov 1 13:00:55 2016 Roger CaballeroEff callibration parameters for G7-CloverEfficiency calibration for the G7 clover (data
acquired in July).
The attached plots show the parameters for
 G7-Blue.pdfG7-Green.pdfG7-Red.pdfG7-Black.pdf 
  99   Wed Nov 2 01:19:46 2016 Roger CaballeroEff callibration parameters for D4-CloverEfficiency calibration for the D4 clover (data
acquired in October).
The attached plots show the parameters for
 D4-Black.pdfD4-Red.pdfD4-Green.pdfD4-Blue.pdf 
  292   Sun Apr 2 16:18:57 2017 AllEND OF PARASITIC RUN    
  59   Fri Jul 22 12:50:29 2016 J.L. TainEND20/JUL/2016 20:00 
End of the test measurements
  
  91   Sun Oct 16 13:30:43 2016 AllEND... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO
 Sashimi.jpg 
  193   Thu Mar 23 09:01:33 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraELOG Start PreparationWe started the preparation of 2017 campaign   
  35   Sat Jul 9 21:26:25 2016 J.L. TainEDACQElectronics and DACQ for July 2016 assembly:
hardware and connections
 EDACQ-July2016.pdf 
  136   Tue Nov 8 06:39:25 2016 Tain. IrisDrawing of present setup

Attached is the present setup including all
 Full_BRIKEN_Setup-includingTakechi.pdf 
  Draft   Wed Nov 9 01:04:35 2016 IrisDrawing of present setupThis is the setup which was used for the Ni
runs (from Nov. 8th evening on).
 Setup-161109-Takechi.pdf 
  334   Sat Oct 21 04:18:17 2017 NBDraft of Instructions for HVSetup:

  
  128   Mon Nov 7 09:05:09 2016 IrisDraft for Run sheetAttached is the draft for the paper run sheet
(version 2). If something is missing, please
let me know.
 Run_sheet-Nov16-v2.pdfRun_sheet-Nov16-v2.docx 
  189   Mon Nov 28 16:18:07 2016 AEDAQ synchronization Please see: https://elog.ph.ed.ac.uk/AIDA/493   
  58   Wed Jul 20 17:21:59 2016 J. Agramunt, A. TolosaDACQDACQ configuration parameters

The last configuration file used was: 160718Conf_BrikenFull_cal5.xlsx
 160718Conf_BrikenFull_cal5.xlsx 
  70   Sat Oct 8 01:18:51 2016 JL Tain et alDACQWe increased the pretrigger delay for ADC5
from 350 to 400
  
  151   Sun Nov 20 12:28:27 2016 Jorge, Alvaro, JoseDACQUpdated run protocol  GasificShort.pdf 
  152   Sun Nov 20 13:02:06 2016 Jorge, Alavaro, JoseDACQGasific-7.0 Short Manual (Preliminary)  Gasific70Manual.pdf 
  165   Fri Nov 25 21:48:49 2016 ATDACQ19:00  Test calibration    
ELOG V3.1.4-unknown