ID |
Date |
Author |
Subject |
Text |
 |
87
|
Fri Oct 14 04:42:40 2016 |
JL Tain et al | Electronics | Change of main power line for MPOD and CLOVER
preamp
|
 |
55
|
Wed Jul 20 16:55:48 2016 |
K.Gabor, K. Matsui, A. Tarifeņo | Electronic | Drying of preamplifiers
PA8, PA9 and PA10 are removed and brought |
|
100
|
Wed Nov 2 02:26:22 2016 |
Roger Caballero | Efficiency callibration calculator (Excel file) | Attached the updated excel file. In the first
sheet there is the calculator to calculate
the efficiency from an given energy.
|
|
97
|
Tue Nov 1 13:00:55 2016 |
Roger Caballero | Eff callibration parameters for G7-Clover | Efficiency calibration for the G7 clover (data
acquired in July).
The attached plots show the parameters for |
   |
99
|
Wed Nov 2 01:19:46 2016 |
Roger Caballero | Eff callibration parameters for D4-Clover | Efficiency calibration for the D4 clover (data
acquired in October).
The attached plots show the parameters for |
   |
292
|
Sun Apr 2 16:18:57 2017 |
All | END OF PARASITIC RUN | |
|
59
|
Fri Jul 22 12:50:29 2016 |
J.L. Tain | END | 20/JUL/2016 20:00
End of the test measurements |
|
91
|
Sun Oct 16 13:30:43 2016 |
All | END | ... and sashimi (see photo)
The detectors (BRIKEN tubes, CLOVER, VETO |
|
193
|
Thu Mar 23 09:01:33 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | ELOG Start Preparation | We started the preparation of 2017 campaign |
|
35
|
Sat Jul 9 21:26:25 2016 |
J.L. Tain | EDACQ | Electronics and DACQ for July 2016 assembly:
hardware and connections |
|
136
|
Tue Nov 8 06:39:25 2016 |
Tain. Iris | Drawing of present setup |
Attached is the present setup including all |
|
Draft
|
Wed Nov 9 01:04:35 2016 |
Iris | Drawing of present setup | This is the setup which was used for the Ni
runs (from Nov. 8th evening on).
|
|
334
|
Sat Oct 21 04:18:17 2017 |
NB | Draft of Instructions for HV | Setup:
|
|
128
|
Mon Nov 7 09:05:09 2016 |
Iris | Draft for Run sheet | Attached is the draft for the paper run sheet
(version 2). If something is missing, please
let me know. |
 |
189
|
Mon Nov 28 16:18:07 2016 |
AE | DAQ synchronization | Please see: https://elog.ph.ed.ac.uk/AIDA/493 |
|
58
|
Wed Jul 20 17:21:59 2016 |
J. Agramunt, A. Tolosa | DACQ | DACQ configuration parameters
The last configuration file used was: 160718Conf_BrikenFull_cal5.xlsx
|
|
70
|
Sat Oct 8 01:18:51 2016 |
JL Tain et al | DACQ | We increased the pretrigger delay for ADC5
from 350 to 400 |
|
151
|
Sun Nov 20 12:28:27 2016 |
Jorge, Alvaro, Jose | DACQ | Updated run protocol |
|
152
|
Sun Nov 20 13:02:06 2016 |
Jorge, Alavaro, Jose | DACQ | Gasific-7.0 Short Manual (Preliminary) |
|
165
|
Fri Nov 25 21:48:49 2016 |
AT | DACQ | 19:00 Test calibration |
|