AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 12 of 21  ELOG logo
Entry  Thu Mar 23 09:01:33 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, ELOG Start Preparation 
We started the preparation of 2017 campaign
Entry  Fri Dec 9 05:25:26 2016, PV, Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment Schematic_PbShielding_FallonRun.pdfIMG_1414.JPG
This Pb shielding structure is right behind the variable degrader
Entry  Thu Dec 8 04:17:49 2016, PV, Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer Screenshot_from_2016-12-08_13-30-16.png
All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:

https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing

To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro)
Entry  Tue Nov 29 00:30:42 2016, PV,SN, Sillicon dE bias voltage increased 
We increase the bias voltage of the dE detector from 20 V to 100 V

Leakage current:

Before: ~0.590 uA
Entry  Mon Nov 28 16:18:07 2016, AE, DAQ synchronization  
Please see: https://elog.ph.ed.ac.uk/AIDA/493
Entry  Mon Nov 28 10:48:21 2016, JLT, Online analysis analysis-271116.pdf
Comparison of current spectra with spectra from Takechi's run

(See attachment)
Entry  Mon Nov 28 05:59:28 2016, briken , run 

=======    START    =======
Date 2016/11/28
Start time : 11:12
BRIKEN run : 056
Daq Conf. File : 161128Conf_BrikenFull.xlsx
DLT File name :
161128_1112
AIDA run : R28-0
AIDA start : 11:08
BigRIPS run : 1049
BigRIPS start : 09:15
 
---------------------------
Shifters:  AT GK KD
=======
   Setup    =======
Central fragment:  41Al @F8
--- Degraders ---
 Fixed: 3mm Pb between Musics chambers
 Included lead shieldings around the beam.
Entry  Mon Nov 28 01:22:50 2016, BRIKEN collaboration, Elog RIBF123 & BigRIPS 6x
Full RIB123 Elog entries for Takechi && Fallon parasitic experiments
Update:03Dec16
Instructions:
Entry  Sun Nov 27 23:14:49 2016, BRIKEN coll, run 036 
=======    START    =======
Date 2016/11/27
Start time : 19:28
Entry  Sun Nov 27 11:23:54 2016, PV, GK, AE, TD , 40Mg. Run 35  
=======    START    =======
Date 2016/11/27
Start time : 18:59
Entry  Sun Nov 27 11:15:42 2016, PV, GK, AE, TD , 40Mg. Run 34 
=======    START    =======
Date 2016/11/27
Start time : 17:29
Entry  Sun Nov 27 11:07:02 2016, PV, GK, AE, TD, 40Mg. Run 33 - junk 
=======    START    =======
Date 2016/11/27
Start time : 17:17
Entry  Sun Nov 27 10:47:20 2016, PV,TD,GK, 40Mg. Run 32 
=======    START    =======
Date 2016/11/27
Start time : 16:20
Entry  Sun Nov 27 07:10:29 2016, BRIKEN colaboration, Run 31 
=======    START    =======
Date 2016/11/27
Start time : 13:53
Entry  Sun Nov 27 04:38:15 2016, BRIKEN collaboration, Run 030 
=======    START    =======
Date 2016/11/27
Start time : 10:41
Entry  Sun Nov 27 04:36:16 2016, BRIKEN collaboration, Run 020-023 
=======    START    =======
Date 2016/11/26
Start time : 20:05
Entry  Sat Nov 26 20:50:13 2016, GK, AT&AT, run 16-19 161126_1823_016_019_Rates.png161126_1823_016_019_Rings.png
=======    START    =======
Date 2016/11/26
Start time : 17:21
Entry  Sat Nov 26 20:48:16 2016, BRIKEN collaboration, run 
=====   Start of measurements 41Al  ======
Entry  Sat Nov 26 16:54:17 2016, AT & AT, Clovers 
Calibration of clovers
Entry  Sat Nov 26 16:21:08 2016, Briken collaboration, 41Al run 2-15 
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb   ONLY!
ELOG V3.1.4-unknown