Thu Mar 23 09:01:33 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, ELOG Start Preparation
|
We started the preparation of 2017 campaign |
Fri Dec 9 05:25:26 2016, PV, Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment 
|
This Pb shielding structure is right behind the variable degrader |
Thu Dec 8 04:17:49 2016, PV, Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer
|
All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:
https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing
To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro) |
Tue Nov 29 00:30:42 2016, PV,SN, Sillicon dE bias voltage increased
|
We increase the bias voltage of the dE detector from 20 V to 100 V
Leakage current:
Before: ~0.590 uA |
Mon Nov 28 16:18:07 2016, AE, DAQ synchronization
|
Please see: https://elog.ph.ed.ac.uk/AIDA/493 |
Mon Nov 28 10:48:21 2016, JLT, Online analysis
|
Comparison of current spectra with spectra from Takechi's run
(See attachment) |
Mon Nov 28 05:59:28 2016, briken , run
|
======= START =======
Date 2016/11/28
Start time : 11:12
BRIKEN run : 056
Daq Conf. File : 161128Conf_BrikenFull.xlsx
DLT File name :
161128_1112
AIDA run : R28-0
AIDA start : 11:08
BigRIPS run : 1049
BigRIPS start : 09:15
---------------------------
Shifters: AT GK KD
=======
Setup =======
Central fragment: 41Al @F8
--- Degraders ---
Fixed: 3mm Pb between Musics chambers
Included lead shieldings around the beam.
|
Mon Nov 28 01:22:50 2016, BRIKEN collaboration, Elog RIBF123 & BigRIPS 6x
|
Full RIB123 Elog entries for Takechi && Fallon parasitic experiments
Update:03Dec16
Instructions:
|
Sun Nov 27 23:14:49 2016, BRIKEN coll, run 036
|
======= START =======
Date 2016/11/27
Start time : 19:28
|
Sun Nov 27 11:23:54 2016, PV, GK, AE, TD , 40Mg. Run 35
|
======= START =======
Date 2016/11/27
Start time : 18:59
|
Sun Nov 27 11:15:42 2016, PV, GK, AE, TD , 40Mg. Run 34
|
======= START =======
Date 2016/11/27
Start time : 17:29
|
Sun Nov 27 11:07:02 2016, PV, GK, AE, TD, 40Mg. Run 33 - junk
|
======= START =======
Date 2016/11/27
Start time : 17:17
|
Sun Nov 27 10:47:20 2016, PV,TD,GK, 40Mg. Run 32
|
======= START =======
Date 2016/11/27
Start time : 16:20
|
Sun Nov 27 07:10:29 2016, BRIKEN colaboration, Run 31
|
======= START =======
Date 2016/11/27
Start time : 13:53
|
Sun Nov 27 04:38:15 2016, BRIKEN collaboration, Run 030
|
======= START =======
Date 2016/11/27
Start time : 10:41
|
Sun Nov 27 04:36:16 2016, BRIKEN collaboration, Run 020-023
|
======= START =======
Date 2016/11/26
Start time : 20:05
|
Sat Nov 26 20:50:13 2016, GK, AT&AT, run 16-19 
|
======= START =======
Date 2016/11/26
Start time : 17:21
|
Sat Nov 26 20:48:16 2016, BRIKEN collaboration, run
|
===== Start of measurements 41Al ====== |
Sat Nov 26 16:54:17 2016, AT & AT, Clovers
|
Calibration of clovers |
Sat Nov 26 16:21:08 2016, Briken collaboration, 41Al run 2-15
|
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb ONLY!
|