AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 12 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Mar 23 09:01:33 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, ELOG Start Preparation 
We started the preparation of 2017 campaign
Entry  Fri Dec 9 05:25:26 2016, PV, Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment Schematic_PbShielding_FallonRun.pdfIMG_1414.JPG

This Pb shielding structure is right behind the variable degrader

Entry  Thu Dec 8 04:17:49 2016, PV, Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer Screenshot_from_2016-12-08_13-30-16.png

All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:

https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing

To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro)

- Extract the downloaded file:

tar -xvzf elogBRIKEN2016.tar.gz

- Go to the extracted directory and execute make

cd elogBRIKEN2016

make

- Run elogd service:

./elogd start

then it will display:

elogd 3.1.2 built Dec  8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ... 
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
 

- Go to your web browser, enter 

http://localhost:3333

-  It will ask you to register a new elog account, fill in your prefered information

Login name:   (name may not contain blanks)
Full name:  
Email:  
Password:  
Retype password:

and press Save button

- Next, it will ask you to choose which logbook you want to subcribe, in this case we should choose: RIBF123, then press Save buttom at the top left connner (see attached photo)

- The experimental log should be displayed then. Select RIBF123.

 


 

Ubuntu 16

Please, update/install the following packages:

sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev

 

Entry  Tue Nov 29 00:30:42 2016, PV,SN, Sillicon dE bias voltage increased 

We increase the bias voltage of the dE detector from 20 V to 100 V

Leakage current:

Before: ~0.590 uA

After 0.695 uA

Entry  Mon Nov 28 16:18:07 2016, AE, DAQ synchronization  

Please see: https://elog.ph.ed.ac.uk/AIDA/493

Entry  Mon Nov 28 10:48:21 2016, JLT, Online analysis analysis-271116.pdf
Comparison of current spectra with spectra from Takechi's run

(See attachment)
Entry  Mon Nov 28 05:59:28 2016, briken , run 
=======    START    =======
Date 2016/11/28
Start time	: 11:12
BRIKEN run	: 056
Daq Conf. File	: 161128Conf_BrikenFull.xlsx
DLT File name	: 161128_1112
AIDA run	: R28-0
AIDA start	: 11:08
BigRIPS run	: 1049
BigRIPS start	: 09:15
 
---------------------------
Shifters:  AT GK KD
=======    Setup    =======
Central fragment:  41Al @F8
--- Degraders ---
 Fixed: 3mm Pb between Musics chambers
 Included lead shieldings around the beam.
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN

=======  COMMENTS   =======
09:13 Clover G7Red Plugged in again. 

AIDAPL gain has been increased by SN from 900V to 1000V.

------  Rates  ------
BRIKEN	:     Hz
F11R	:     Hz
Clovers	:     Hz
VPLT	:     Hz
VPLB	:     Hz
AIDAPL	:     Hz

=========   END   =========
Date 2016/11/28
BRIKEN run	: 
BRIKEN stop	: 
ROOT online	: 
AIDA run	: 
AIDA stop	: 
BigRIPS RUN	: 
Entry  Mon Nov 28 01:22:50 2016, BRIKEN collaboration, Elog RIBF123 & BigRIPS 6x
Full RIB123 Elog entries for Takechi && Fallon parasitic experiments
Update:03Dec16
Instructions:
1) Download RIBF123FullEntries.tar.gz-part-aa and RIBF123FullEntries.tar.gz-part-ab

2) Join and uncompress the file on the terminal: 
    # cat RIBF123FullEntries.tar.gz-part-*| tar xz
3) cd RIBF123FullEntries

4) Open with a Browser ELOGRIBF123_161203_2030_fullWeb.html
-----------------------------------------------------------
HTML elogs for BigRIPS are found by unziping BigRIPSRunSummary.zip and EXPDBRunSummary.zip   

-----------------------------------------------------------
The full elog is also included in pdf file. See:

ElogRIBF123_161203_2030_Full_part1.pdf 

ElogRIBF123_161203_2030_Full_part2.pdf 
Entry  Sun Nov 27 23:14:49 2016, BRIKEN coll, run 036 
=======    START    =======
Date 2016/11/27
Start time	: 19:28
BRIKEN run	: 36
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161128_1928
AIDA run	: R24
AIDA start	: 19:28
BigRIPS run	: 1034
BigRIPS start	: 18:33
 
---------------------------
Shifters:  PV, KG, TD
=======    Setup    =======
Central fragment:  41Al @F8
--- Degraders ---
 Fixed: 3mm Pb between Veto plastics up and down + 1mm Al 
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======
TimeStamp has been reset two times during this run.

ERROR!  Data acquisition with errors during this ring because not restarted after Liquid Nitrogen refilling.

------  Rates  ------
BRIKEN	:     Hz
F11R	:     Hz
Clovers	:     Hz
VPLT	:     Hz
VPLB	:     Hz
AIDAPL	:     Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 036
BRIKEN stop	: 20:38
ROOT online	: 161127_1928_036.root
AIDA run	: R25_0
AIDA stop	: 
BigRIPS RUN	: 1035
Entry  Sun Nov 27 11:23:54 2016, PV, GK, AE, TD , 40Mg. Run 35  
=======    START    =======
Date 2016/11/27
Start time	: 18:59
BRIKEN run	: 035
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1859
AIDA run	: R23_0
AIDA start	: 19:19
BigRIPS run	: 40Mg-1034
BigRIPS start	: 18:33
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27
19:19: There is a transient, AIDA DAQ found stopped due the incompleted LN2 filling.

------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 035
BRIKEN stop	: 19:23
ROOT online	: 
AIDA run	: R23_4
AIDA stop	: 19:19
BigRIPS RUN	: 1034
Entry  Sun Nov 27 11:15:42 2016, PV, GK, AE, TD , 40Mg. Run 34 
=======    START    =======
Date 2016/11/27
Start time	: 17:29
BRIKEN run	: 034
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1729
AIDA run	: R22_2
AIDA start	: 17:29
BigRIPS run	: 40Mg-1033
BigRIPS start	: 17:24
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27


------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 034
BRIKEN stop	: 18:28
ROOT online	: 
AIDA run	: R22_14
AIDA stop	: 
BigRIPS RUN	: 1033
Entry  Sun Nov 27 11:07:02 2016, PV, GK, AE, TD, 40Mg. Run 33 - junk 
=======    START    =======
Date 2016/11/27
Start time	: 17:17
BRIKEN run	: 033
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1717
AIDA run	: R22_0
AIDA start	: 17:17
BigRIPS run	: 40Mg-1033 (and part of 40Mg-1032)
BigRIPS start	: 17:24
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27


------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 032
BRIKEN stop	: 17:15
ROOT online	: 
AIDA run	: R22_1
AIDA stop	: 
BigRIPS RUN	: 1033
Entry  Sun Nov 27 10:47:20 2016, PV,TD,GK, 40Mg. Run 32 
=======    START    =======
Date 2016/11/27
Start time	: 16:20
BRIKEN run	: 032
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1620
AIDA run	: R21_0
AIDA start	: 16:19
BigRIPS run	: 40Mg-1032
BigRIPS start	: 16:20
 
---------------------------
Shifters:  PV, TD, GK
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27
~16:10: Beam Off for a while, we entered F11 area and attached 1mm Al degrader to the beam hole in BRIKEN PE
shielding, then start the new run
~17:00: AIDA merger stopped

------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 032
BRIKEN stop	: 17:15
ROOT online	: 
AIDA run	: R21_8
AIDA stop	: 17:04
BigRIPS RUN	: 1032
Entry  Sun Nov 27 07:10:29 2016, BRIKEN colaboration, Run 31 
=======    START    =======
Date 2016/11/27
Start time	: 13:53
BRIKEN run	: 031
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1353
AIDA run	: R20_0
AIDA start	: 13:51
BigRIPS run	: 1028
BigRIPS start	: 12:32:36
 
---------------------------
Shifters:  
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

------  Rates  ------
BRIKEN	:  Hz
F11R	:  Hz
Clovers	:  Hz
VPLT	:   Hz
VPLB	:   
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/26
BRIKEN run	: 031
BRIKEN stop	: 16:04
ROOT online	: 161127_1353_031.root
AIDA run	: R20_27
AIDA stop	: 16:04
BigRIPS RUN	: 1030
Entry  Sun Nov 27 04:38:15 2016, BRIKEN collaboration, Run 030 
=======    START    =======
Date 2016/11/27
Start time	: 10:41
BRIKEN run	: 030
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161126_1041
AIDA run	: R17_0
AIDA start	: 10:41
BigRIPS run	: 1025
BigRIPS start	: 08:57:33
 
---------------------------
Shifters:  
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======
13:00 The syncro was lost. The TimeStamp was reset. We did not stop recording data. AIDA was writing
file R18_28, BRIKEN was writing file 161126_1041_030.dlt (@637MB). Notice that BRIKEN online histograms were not
reset, and the rates will not be plane.

------  Rates  ------
BRIKEN	: 200 Hz
F11R	: 100 Hz
Clovers	: 275 Hz
VPLT	:  18 Hz
VPLB	:   8 Hz
AIDAPL	:  10 Hz

=========   END   =========
Date 2016/11/26
BRIKEN run	: 030
BRIKEN stop	: 13:26
ROOT online	: 161126_1326_029_030.root
AIDA run	: R28_33
AIDA stop	: 13:26
BigRIPS RUN	: 1028
Entry  Sun Nov 27 04:36:16 2016, BRIKEN collaboration, Run 020-023 
=======    START    =======
Date 2016/11/26
Start time	: 20:05
BRIKEN run	: 020
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161126_2004_
AIDA run	: R10-0
AIDA start	: 20:05
BigRIPS run	: 40Mg-1011
BigRIPS start	: 19:30
 
---------------------------
Shifters:  AT&AT, AE, GK
=======    Setup    =======
Central fragment:  41Al
--- Degraders ---
 Fixed: 3mm Pb  attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN

=======  COMMENTS   =======

2016/11/27
02:48 Beam Off for a while.

07:15 Two peaks appeared in the syncMonitor for Ribf-AIDA. It was after the refilling of Liquid Ni. Not clear if
the possible sync problem affected the measurements.   

07:20 Beam OFF

------  Rates  ------
BRIKEN	:   1.90963e+02  Hz
F11R	:   9.75134 Hz
Clovers	:   2.03958e+02  Hz
VPLT	:   1.87119e+01  Hz
VPLB	:   7.76665  Hz
AIDAPL	:   1.00896e+01  Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 023
BRIKEN stop	: 06:25
ROOT online	: 161126_2004_020_023.root
AIDA run	: R10-211
AIDA stop	: 06:25
BigRIPS RUN	: 1022
Entry  Sat Nov 26 20:50:13 2016, GK, AT&AT, run 16-19 161126_1823_016_019_Rates.png161126_1823_016_019_Rings.png
=======    START    =======
Date 2016/11/26
Start time	: 17:21
BRIKEN run	: 016
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161126_1721_016
AIDA run	: R9-24
AIDA start	: 16:35
BigRIPS run	: 40Mg-1009
BigRIPS start	: 
---------------------------
Shifters:  GK, AT&AT
=======    Setup    =======
Central fragment:  41Al
--- Degraders ---
 Fixed: 3mm Pb between Musics 
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN

=======  COMMENTS   =======
High gamma counting is affecting rings 1-4. (gammas in beam!?) 

------  Rates  ------
BRIKEN	:    1.12118e+02 cps
F11R	:    6.26962 cps
Clovers	:    1.72406e+04 cps
VPLT	:    1.82165e+01 cps
VPLB	:    9.08055 cps
AIDAPL	:    7.42954 cps

=========   END   =========
Date 2016/11/26
BRIKEN run	: 019
BRIKEN stop	: 18:04
ROOT online	: 161126_1823_016_019.root
AIDA run	: R9-43
AIDA stop	: 18:12
BigRIPS RUN	: 
Entry  Sat Nov 26 20:48:16 2016, BRIKEN collaboration, run 
=====   Start of measurements 41Al  ======
Entry  Sat Nov 26 16:54:17 2016, AT & AT, Clovers 
Calibration of clovers
Entry  Sat Nov 26 16:21:08 2016, Briken collaboration, 41Al run 2-15 
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb   ONLY!

13:25 Signal cables for clover G7 are connected, now G7 spectra are visible in ONLINE.

13:35 Beam Off!

14:00 Beam ON

15:08 Beam OFF, still problems with beam!

15:11 Beam ON 

15:18 Acquisition is stopped. Files 
   161126_1308_002.dlt to 161126_1308_015.dlt
   161126_1308_002.root (online)

Rates:
F11R	:  4.2 & 1.0  & 9.3 Hz
BRIKEN	:  150 & 12.9 & 160 Hz
ELOG V3.1.4-unknown