Sat Nov 5 01:25:24 2016, Tain et al, End of Beam Line Setup 9x
|
Some photos of the elements in the last part of the beam line
during Takechi run.
|
Fri Nov 4 13:16:42 2016, JLTain,ATolosa,JAgramunt, Neutron Background   
|
Beam tuning in BigRIPS
At 19:00 access to Exp. Area was closed and the tuning
|
Thu Nov 3 05:27:48 2016, Alvaro, Tain, Gabor, Ale, 152Eu
|
Energy calibration for clovers, 152Eu
|
Fri Nov 4 03:37:27 2016, Roger Caballero, Energy calibration for Ge clovers
|
Energy Calibration: See attached pdf
Detector Slope Offset
|
Thu Nov 3 23:28:01 2016, A. Tolosa, BRIKEN Bkg + 152Eu 
|
Measurement over night with a 152Eu source inside
Start: 22:48 (03/11/2016)
|
Thu Nov 3 15:09:52 2016, A. Tarifeno-Saldivia, C. Domingo-Pardo, J.L. Tain, BRIKEN neutron efficiency  
|
Geant4 BRIKEN Neutron efficiency calculations as a function of neutron energy and for some spectra: Ga84-vandle, Br88-endf71, Rb94-endf71, Rb95-endf71,
I137-endf71, Cf252-MCNPX
|
Thu Nov 3 14:02:49 2016, Nepal, J Ha, PV, Liu J, The degrader system has been set 
|
We used the laser to align the degrader (see attached photos)
According to the LISE calculation, equivalent effective thickness for 6 mm of Carbon target is 4.5 mm thick Aluminum.
Therefore, we've set the degrader system as follow: |
Thu Nov 3 05:46:48 2016, Iris, Ale, Background measurement
|
Background measurement for threshold determination
|
Thu Nov 3 04:46:24 2016, Alvaro Tolosa, 252Cf
|
Check of BRIKEN calibration and thresholds
Source more or less at the center
|
Thu Nov 3 04:40:02 2016, All, START
|
Start of commissioning preparation
|
Tue Nov 1 09:27:02 2016, Alvaro Tolosa, CLOVER 
|
Efficiency calibration
File "cloversEff.ods" and "cloversEff.xls" contains the experimental efficiency from different measurements
|
Tue Nov 1 13:00:55 2016, Roger Caballero, Eff callibration parameters for G7-Clover   
|
Efficiency calibration for the G7 clover (data acquired in July).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of a 152Eu source.
|
Wed Nov 2 01:19:46 2016, Roger Caballero, Eff callibration parameters for D4-Clover   
|
Efficiency calibration for the D4 clover (data acquired in October).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of 152Eu, 60Co and 137Cs sources.
|
Wed Nov 2 02:26:22 2016, Roger Caballero, Efficiency callibration calculator (Excel file)
|
Attached the updated excel file. In the first sheet there is the calculator to calculate the efficiency from an given energy.
The Jackel function used is:
|
Mon Oct 31 23:56:37 2016, J. Agramunt, First AIDA BRIKEN correlation plot
|
From the 252Cf data. |
Tue Oct 18 09:41:43 2016, Alvaro Tolosa, 2016 - July, Logbook
|
Paper logbook for July-2016
For correct visualization,
please download it. |
Tue Oct 18 09:36:07 2016, Alvaro Tolosa, 2016-Oct, Logbook
|
Paper logbook for October-2016
For correct visualization,
please download it. |
Mon Oct 17 05:21:46 2016, Phong, Liu J J, dE detector position and output signal from preamplifier  
|
dE detector is mounted onto the back side of the shielding (attached photo: dE_position.JPG)
The detector consists of 26 strips. In this setup, the detector is devided into 2 parts corresponding to 2 readout channels. Each part consists of 13 strips |
Sun Oct 16 13:30:43 2016, All, END
|
... and sashimi (see photo)
The detectors (BRIKEN tubes, CLOVER, VETO detectors, AIDA)
|
Sun Oct 16 12:58:34 2016, All, BRIKEN  
|
Installation of BRIKEN PE shielding for beam
related neutrons
|
Fri Oct 14 14:06:38 2016, All, First measurement of BRIKEN and AIDA
|
Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common clock.
|
Fri Oct 14 13:32:52 2016, NT BREWER, S Go, JM Allmond, Ge preamp power loss and solution.
|
As previously recorded (81), on Thur Oct 13th, A NIM crate failure caused preamp power loss to the HPGe's. While D4 recovered with nominally the
same resolution as before. G7 would not recieve power to the preamps without an alarm from the NIM crate.
It was determined that there was a short along the lines of +12V and Ground , -12V and Ground, and between +-12V. |
Fri Oct 14 04:42:40 2016, JL Tain et al, Electronics 
|
Change of main power line for MPOD and CLOVER preamp
|
Fri Oct 14 04:12:50 2016, JL Tain et al, CONF
|
New configuration file:
161014Conf_BrikenFull.xlsx |