AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 9 of 33  ELOG logo
ID Date Author Subject Text Attachments
  499   Thu Feb 8 14:59:59 2024 JM, TDChange p+n FEE64 settingsASIC settings for the pn FEEs has been reset
to the default aida settings. This was done
to combat the observed dropping of several
  
  498   Thu Feb 8 11:22:28 2024 JMShifters instruction 2024EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  497   Wed Feb 7 13:50:20 2024 Elena Hanu, Carlo Bruno, Michael LestinskyAfternoon shift14:50

 

Temperature, Statistics fine (see
 Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png 
  496   Wed Feb 7 10:09:14 2024 CB, JG, EMMorning Shift 11:00

Changed slow comp threshold to
0x32 (500 keV). Checkloaded.
 Screenshot_from_2024-02-07_11-10-08.pngScreenshot_from_2024-02-07_11-10-59.pngScreenshot_from_2024-02-07_11-15-53.pngScreenshot_from_2024-02-07_11-20-38.png 
  495   Tue Feb 6 09:39:54 2024 CBDetector bias tests10:30 Found ADC#4 on aida 1 and 4 are suddenly
noisy. See attach 1-2. Checkloaded multiple
times - no effect.
 13x 
  494   Mon Feb 5 20:15:31 2024 CB, TDDetector move in/out signals17.43 setup signals from detector movement
controller.
 20240205_174307.jpg 
  493   Mon Feb 5 19:43:52 2024 CB, TD, MLBuTIS reference for VETAR2
16.40 CB/ML install fibre optic cable from
patch panel beneath dipole downstream of
 20240205_173029.jpg20240205_172957.jpgScreenshot_from_2024-02-05_16-43-18.png 
  492   Mon Feb 5 12:48:50 2024 CB TDPulser walkthough - Run4
13.41 DAQ start - file G22-88/R4
 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png 
  491   Mon Feb 5 05:45:26 2024 CB TDRun3 - end06.40 DAQ continues file G22-88/R3_42

      DSSSD bias OK - attachment 1
 47x 
  490   Sun Feb 4 08:40:04 2024 CB TDRun3 - contd09.30 DAQ continues file G22-88/R3_17

      DSSSD bias OK - attachment 1
 22x 
  489   Sat Feb 3 15:05:10 2024 CB, TD[How To] Restart Anydesk1. Check Proxy server is correct

localhost : 8080

incoming connections 7070
  
  488   Sat Feb 3 00:13:03 2024 CB TDRun1 end - R3 start
01.07 DAQ continues file G22-88/R1_46
      background alpha
 50x 
  487   Fri Feb 2 09:58:58 2024 TDTapeServer not writng data to disk - plus fix DAQ and NewMerger appear to be cofigured correctly.

Can allocate device, create volume and open
 7x 
  486   Fri Feb 2 08:59:36 2024 JM, TD, CBRun1 start - pulser widths spreadsheetCurrent pulser widths excel spreadsheet attached

09.58 DSSSD bias OK - attachment 1 
 20x 
  485   Thu Feb 1 14:45:09 2024 JM, CBNewMerger setupTo include alll 16 FEE modules in the NewMerger
we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi
from MERGE.LinksAvailable string 5 to MERGE.LinksAvailable
  
  484   Thu Feb 1 10:04:11 2024 JM, CBShaping time testingArrived at the control room to find we
had lost connection to the power relay. We
rebooted the nnrpi1 and re-connected according
 31x 
  483   Wed Jan 31 09:49:38 2024 JM, TDOptimising - Wednesday 31Removed ground from DSSD #1 to the chamber
and set MACBs so that timestamp is from the
NIM WR emulator not the VME VETAR2.
 25x 
  482   Tue Jan 30 14:04:30 2024 NH[HowTo] Update MACB FirmwareThis is how to update the MACB firmware using
the opensource tool xc3sprog
 xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed 
  481   Tue Jan 30 09:14:50 2024 JM, TDTuesday 30 January
09.00 CARME IE514 5.1e-11mbar
 32x 
  480   Mon Jan 29 15:32:08 2024 TD, JMMonday 29 January contd.
Test + and test - daisy chain cabling extended
from DSSSD #1 to #2 to DSSSD #1 to DSSSD
 16x 
ELOG V3.1.4-unknown