Entry  Fri Jan 19 11:17:50 2024, JG, TD, Friday 19 January 18x

12.20 CARME IE514 4.1e-11mbar, ambient temperature 16.7 deg C
Entry  Thu Jan 18 17:21:00 2024, TD, Thursday 18 January Capture.PNG
Network ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC settings/rfs filesystems configured

Entry  Wed Jan 17 19:21:20 2024, TD, AIDA spares 

Spare AIDA hardware 
Entry  Wed Jan 17 19:15:47 2024, TD, Wednesday 17 January 

CAEN N1419ET remote control via carme-gsi and nnrpi1 - see https://elog.ph.ed.ac.uk/CARME/472
Entry  Wed Jan 17 10:31:05 2024, TD, Remote control of CAEN N1419ET from nnrpi1 Capture.PNG

Login to nnrpi1 from carme-gsi using ssh
Entry  Tue Jan 16 16:01:48 2024, TD, Change CARMEraspberrypi to nnrpi1 Capture.PNG

Change RPi from CARMEraspberrypi to nnrpi1 to provide carme-gsi access to Rly16 to control USB-controlled ac mains relay.
nnrpi1 is already defined in carme-gsi:/etc/dhcp/dhcpd.conf
Entry  Tue Jan 16 14:36:30 2024, TD, CARME configuration dhcpd.confOptionsSettingsstartup.tclrfs

FEE64
Entry  Tue Jan 16 08:57:44 2024, JG, DR, TD, Tuesday 16 January 8x
10.00 Outflow manifold returned from workshop with leaking attachment point welding re-worked.

11.30 Outflow hoses re-attached to outflow manifold. Faulty male Swagelok replaced.
Entry  Mon Jan 15 18:51:28 2024, JG, DR, TD, Monday 15 January 

Cooling water manifolds
Entry  Sun Jan 14 12:31:32 2024, JM, CB, FEE positions mac addresses CARME-FEEs.jpg
*Updated following FEE changes. Correct as of 31/01/24

FEE modules are labelled according to the diagram in attachment. Note attachment is looking downstream. Each FEE module is also labelled with
its assigned number and whether it is a bias connection on the FEE holders. MAC addresses and FEE descriptions are as follows;
Entry  Sat Jan 13 14:32:21 2024, CB, JM, Leaky manifold and cable management 20240112_111838.jpg20240112_105936.jpg20240113_183019.jpg
Found two leaks in the welding of the manifolds, marked them in tape. Manifold to be repaired on Monday. Remember to re-install missing hoses, which
are  in a bucket in the cave.

See attached how it is supposed to look like.
Entry  Sat Jan 13 14:25:05 2024, CB, JM, Bias tests with all FEEs connected Screenshot_2024-01-13_15-24-40.png20240113_150158.jpg
Connected all FEEs.

The two top fees corresponding to the bottom right detector are connected to damaged flexi rigid PCBs. The top one is missing an pin that should
not be connected to anything, while the bottom one has a slightly cracked connector and is missing the top left pin. Spares should be in Edinburgh.
Entry  Thu Jan 11 19:57:20 2024, CB, JM, All FEE holders mounted 
After discussions with Davide, changed the holes in the FEE holders for the bottom-right detector to slots in order to slightly change the angle that
the FEE inserts into the flexi rigid PCB. This was sufficient, with some difficulties, to insert both FEEs into the flexi rigid.

Attempted to finally mount the last two fees, the top two for the bottom-right detector, which should have been very easy. Somehow managed to
Entry  Wed Jan 10 19:27:08 2024, CB, JM, Manifold and more bias tests 
Mounted water manifold on CARME with help from GSI plumber. Connected all the hoses with Swagelok self-locking connectors. Tested for water leaks - it
leaks from nearly every port. The issue appear to be the connections between the manifold and the plugs, as opposed to the plugs and the hoses which do
not leak.
Entry  Wed Jan 10 10:22:41 2024, CB, JM, Some FEEs mounted - issues with Det#2 (bottom left) Screenshot_2024-01-10_11-59-39.pngScreenshot_2024-01-10_12-56-36.png
Started mounting some FEEs. We ran into some mechanical issues due to the new ERNI connectors on the new flexi-rigid adaptor PCBs. Davide skimmed 6.5
mm off the edge with the groove (the groove is gone). This is suffiicent to support the flexi-rigid and in spite of our earlier concerns, the flexi-rigid
can be mated/un-mated with the FEEs without major alignment issues.
Entry  Mon Jan 8 19:29:57 2024, CB, JM, Manifold repaired + fee assembly in bench  20240108_164756.jpg20240108_163218.jpg20240108_163916.jpg20240108_164010.jpg
Davide extracted the stuck blind plugs and re-threaded all missing ports. Completed manifold assembly, except for main inlet/outlet - left for plumber.

Cut 8x2 2m hoses and assembled with Swagelok quikfit and teflon ferrules.

We're missing back ferrules in brass for the repaired fees. It should be possible to buy them from GSI.
Entry  Mon Jan 8 19:27:36 2024, CB, JM, Leak current tests overnight  Screenshot_2024-01-08_09-56-20.png
Left bias in overnight. Leakage current decreased and stabilised. See attached. Bias off as we prepare to mount the fees.
Entry  Sun Jan 7 15:38:57 2024, CB, JM, Manifolds mostly assembled + bias overnight check Screenshot_2024-01-07_16-38-26.png
Assembled most of the connectors on the new (green) manifolds. Two blanking pulgs stuck when mounting - cannot remove them or tighten them. Swarf? Will
ask Davide's help tomorrow. Cannot use the manifold until this is fixed.

Checked FEE assembly in cassette. Need to shorten black Delrin supports by ~6 mm. Holes should end up in the correct position thanks to rails
Entry  Fri Jan 5 12:29:10 2024, JM, CB, Further bias tests 
Biased detectors this morning to 150V, the leakage current for all detectors appears stable and is ~3.5 uA. We have also replaced the CAEN bias module
so that all channels are now functional. Detectors are connected as follows;

CHN0 -> Top left
Entry  Thu Jan 4 13:15:10 2024, CB, JM, Tent removed - bias test Bias.png
Removed tent, octagon, Neg cables.

Disconnected and removed Baking Pi, TC08, thermocouples.

Tested new rails, plates, fees - it fits. Need to check on the flange next.