Entry  Wed Mar 2 14:15:16 2022, JM, PM, Current status 6x
15:15

Temperature setpoint = 113 K

Target density is OK for now. S1 vaies between 2E-8 and 3.5E-8 mbar. E4 between 1E-9 and 1E-8 mbar.
Entry  Wed Mar 2 17:21:35 2022, JM, PM, Current status 8x
18:21

Temperature setpoint = 113k

Target density OK S1 varies between 2E-8 and 2.5E-8 mbar, E4 between 1E-9 and 5E-9 mbar. (slightly lower than previous check)
Entry  Wed Mar 2 19:25:25 2022, JM, PM, Current status 10x
20:25

Observed short burst of low energy noise on aida1, lasted <30s (attachment 8).

Temperature setpoint = 113 K
Entry  Wed Mar 2 21:16:06 2022, JM, PM, Current status 
22:16

Temperature setpoint = 113k

Not observed noise burst again
Entry  Wed Jan 12 20:07:20 2022, JM, OH, TD, FEE holder installation 10x
4 FEE holders installed on CARME. Mounting procedure devised due to limited working space to install.

Mounting procedure:
>Install FEE holder mounts (image 1) onto feedthrough flange
Entry  Thu Jan 13 10:33:24 2022, JM, OH, TD, Adaptor Board misallignment 20220112_160951.jpg20220113_145105.jpg20220113_145147.jpg
The ERNI connector is not central on the adaptor boards causing misallignment with the FEE. 

The adaptor board is 80mm long. The ERNI connector is 50mm long. The connector is 13mm from the 2x Lemo side and 17mm from the 3x Lemo side.
This results in misallignment between the FEE and adaptor board. 
Entry  Sat Jan 15 15:38:25 2022, JM, OH, TD, FEE installation, cable management 20220114_104819.jpg20220114_105152.jpg20220114_105213.jpg20220115_133808.jpg20220115_133820.jpg
All 8 FEEs have been installed in their holders.

The damaged feedthrough does not have the D-connector on the adaptor board inserted into the falnge but the FEE is connected to the adaptor board. 

FEE's were carefully installed, with one person inserting FEE and another making sure FEE was straight and on the correct pin positions.
Entry  Wed Jan 26 19:16:18 2022, JM, OH, Water cooling, FEE MAC address 20220126_162435.jpg20220126_162448.jpg20220126-142809.jpg
Water cooling has been connected to the FEE's. Flow meter installed to outlet manifold by way of two right angled pieces. No leaks observed
rom any points in the coolant loop, loop will be bled using taps tomorrow. Water turned OFF overnight. 

FEE's powered up with the MAC addresses of each read. 1 is the very bottom FEE and 8 the very top. FEE's have also labelled with the
Entry  Thu Jan 27 21:33:40 2022, JM, OH, AIDA config files, remote access, motor test 20220127_101513.jpg
Power, Ethernet and HDMI cables connected to FEEs. To prevent cables coming out of connectors, power and HDMI cables are zip tied to FEE cooling pipe
(see attached image).

Correct FEE MAC addresses have been updated in /etc/dhcp/dhcpd.conf
Entry  Sat Jan 29 11:04:07 2022, JM, OH, Grounding and Pulser Silkscreen_Top.pdf
Grounding

Ground cables have been daisy chained together from FEE to FEE. Ground cables are screwed into a feee bolt hole on the FEE body using an M3 bolt. 

LEMO cables have been connected in a similar way between the grounds on the adaptor boards for each FEE. Short LEMO cables go between J6 on pairs
Entry  Thu Mar 3 15:14:21 2022, JM, OH, CARME packing up 
Pulser walkthrough taken for motor position 23.1mm and motor position 67.43mm.

Points taken at 30,50,70,90,110,130,150,170,190,210,230 for 23.1mm position and 230,210,190,170,150,130,110 for 67.43mm position.

Motors moved to fully OUT position and pin put back in. Current positions before closing program 19.1mm and 19.57mm. 
Entry  Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm)
Entry  Mon Jun 17 06:26:45 2024, JM, OF, AK, CB, Change to 5+ beam 7x
07:00

We are changing to 5+ beam so that we can access higher energies and possibly observe a higher lying, wider resonance.

Beam energy change to 1.06 MeV/u.
Entry  Sun Feb 27 22:03:51 2022, JM, OF, Current Status 9x
23:00

Target Temperature setpoint 95 K

Current in the ring ~ 5e7 pps
Entry  Sun Feb 27 23:17:33 2022, JM, OF, Current status 10x
00:20

Temperature setpoint 115 K

Rutherford rate appears fairly stable. Fluctuations from a max peak of 10^2 to a minimum of ~40 peak hieght. Fluctuates remain lower than at
Entry  Mon Feb 28 00:24:05 2022, JM, OF, Current status 7x
01:23

Temperature setpoint = 115 k

Rutherford rates still appears stable. Max peak ~10^2 counts, min peak ~50 counts per 20 seconds. Greater fluctuations in YR07 plot however do
Entry  Mon Feb 28 01:16:02 2022, JM, OF, Temperature decrease 115K to 110K 20220228_021455.jpg20220228_023832.jpg20220228_025416.jpg
02:15

Density remains stable at 155 K

Temperature setpoint decreased by 1K. Aim to get to 110 K to see if higher stable density can be achieved. 
Entry  Mon Feb 28 02:16:00 2022, JM, OF, Current status 6x
03:21

Temperature setpoint 110 K

Rutherford rate stable. Min peak height ~ 10^2 counts, max ~ 3*10^2 counts.
Entry  Mon Feb 28 03:16:37 2022, JM, OF, Current status 6x
04:24

Temperature setpoint 110 K

Rates appeared stable throughout the hour ~10^2 peak height. Last 5 minutes rutherford peak height appears reduced, cycling from 10^1 to 10^2.
Entry  Mon Feb 28 04:14:26 2022, JM, OF, Current status 9x
05:20

Temperature setpoint = 110 k

Rates are stable however are slightly lower than previous. Min peak height ~40 counts, max ~ 10^2.