AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 17 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  364   Wed Mar 2 14:15:16 2022 JM, PMCurrent status15:15

Temperature setpoint = 113 K

Target density is OK for now. S1
 6x 
  365   Wed Mar 2 17:21:35 2022 JM, PMCurrent status18:21

Temperature setpoint = 113k

Target density OK S1 varies between
 8x 
  366   Wed Mar 2 19:25:25 2022 JM, PMCurrent status20:25

Observed short burst of low energy
noise on aida1, lasted <30s (attachment
 10x 
  367   Wed Mar 2 21:16:06 2022 JM, PMCurrent status22:16

Temperature setpoint = 113k

Not observed noise burst again
  
  170   Wed Jan 12 20:07:20 2022 JM, OH, TDFEE holder installation4 FEE holders installed on CARME. Mounting
procedure devised due to limited working
space to install.
 10x 
  171   Thu Jan 13 10:33:24 2022 JM, OH, TDAdaptor Board misallignmentThe ERNI connector is not central on the
adaptor boards causing misallignment with
the FEE. 
 20220112_160951.jpg20220113_145105.jpg20220113_145147.jpg 
  174   Sat Jan 15 15:38:25 2022 JM, OH, TDFEE installation, cable managementAll 8 FEEs have been installed in their
holders.

The damaged feedthrough does not
 20220114_104819.jpg20220114_105152.jpg20220114_105213.jpg20220115_133808.jpg20220115_133820.jpg 
  175   Wed Jan 26 19:16:18 2022 JM, OHWater cooling, FEE MAC addressWater cooling has been connected to the
FEE's. Flow meter installed to outlet
manifold by way of two right angled pieces.
 20220126_162435.jpg20220126_162448.jpg20220126-142809.jpg 
  180   Thu Jan 27 21:33:40 2022 JM, OHAIDA config files, remote access, motor testPower, Ethernet and HDMI cables connected
to FEEs. To prevent cables coming out of
connectors, power and HDMI cables are zip
 20220127_101513.jpg 
  181   Sat Jan 29 11:04:07 2022 JM, OHGrounding and PulserGrounding

Ground cables have been daisy chained
together from FEE to FEE. Ground cables are
 Silkscreen_Top.pdf 
  369   Thu Mar 3 15:14:21 2022 JM, OHCARME packing upPulser walkthrough taken for motor position
23.1mm and motor position 67.43mm.

Points taken at 30,50,70,90,110,130,150,170,190,210,230
  
  519   Fri Feb 16 10:02:41 2024 JM, OF, CB, AR, EMRun 35 - cooled beam on target11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5
 27x 
  649   Mon Jun 17 06:26:45 2024 JM, OF, AK, CBChange to 5+ beam07:00

We are changing to 5+ beam so that
we can access higher energies and possibly
 7x 
  315   Sun Feb 27 22:03:51 2022 JM, OFCurrent Status23:00

Target Temperature setpoint 95
K
 9x 
  316   Sun Feb 27 23:17:33 2022 JM, OFCurrent status00:20

Temperature setpoint 115 K

Rutherford rate appears fairly
 10x 
  317   Mon Feb 28 00:24:05 2022 JM, OFCurrent status01:23

Temperature setpoint = 115 k

Rutherford rates still appears
 7x 
  318   Mon Feb 28 01:16:02 2022 JM, OFTemperature decrease 115K to 110K02:15

Density remains stable at
155 K
 20220228_021455.jpg20220228_023832.jpg20220228_025416.jpg 
  319   Mon Feb 28 02:16:00 2022 JM, OFCurrent status03:21

Temperature setpoint 110 K

Rutherford rate stable. Min peak
 6x 
  320   Mon Feb 28 03:16:37 2022 JM, OFCurrent status04:24

Temperature setpoint 110 K

Rates appeared stable throughout
 6x 
  321   Mon Feb 28 04:14:26 2022 JM, OFCurrent status05:20

Temperature setpoint = 110 k

Rates are stable however are slightly
 9x 
ELOG V3.1.4-unknown