| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
364
|
Wed Mar 2 14:15:16 2022 |
JM, PM | Current status | 15:15
Temperature setpoint = 113 K
Target density is OK for now. S1 |
6x | |
|
365
|
Wed Mar 2 17:21:35 2022 |
JM, PM | Current status | 18:21
Temperature setpoint = 113k
Target density OK S1 varies between |
8x | |
|
366
|
Wed Mar 2 19:25:25 2022 |
JM, PM | Current status | 20:25
Observed short burst of low energy
noise on aida1, lasted <30s (attachment |
10x | |
|
367
|
Wed Mar 2 21:16:06 2022 |
JM, PM | Current status | 22:16
Temperature setpoint = 113k
Not observed noise burst again |
| |
|
170
|
Wed Jan 12 20:07:20 2022 |
JM, OH, TD | FEE holder installation | 4 FEE holders installed on CARME. Mounting
procedure devised due to limited working
space to install. |
10x | |
|
171
|
Thu Jan 13 10:33:24 2022 |
JM, OH, TD | Adaptor Board misallignment | The ERNI connector is not central on the
adaptor boards causing misallignment with
the FEE. |
  | |
|
174
|
Sat Jan 15 15:38:25 2022 |
JM, OH, TD | FEE installation, cable management | All 8 FEEs have been installed in their
holders.
The damaged feedthrough does not |
    | |
|
175
|
Wed Jan 26 19:16:18 2022 |
JM, OH | Water cooling, FEE MAC address | Water cooling has been connected to the
FEE's. Flow meter installed to outlet
manifold by way of two right angled pieces. |
  | |
|
180
|
Thu Jan 27 21:33:40 2022 |
JM, OH | AIDA config files, remote access, motor test | Power, Ethernet and HDMI cables connected
to FEEs. To prevent cables coming out of
connectors, power and HDMI cables are zip |
| |
|
181
|
Sat Jan 29 11:04:07 2022 |
JM, OH | Grounding and Pulser | Grounding
Ground cables have been daisy chained
together from FEE to FEE. Ground cables are |
| |
|
369
|
Thu Mar 3 15:14:21 2022 |
JM, OH | CARME packing up | Pulser walkthrough taken for motor position
23.1mm and motor position 67.43mm.
Points taken at 30,50,70,90,110,130,150,170,190,210,230 |
| |
|
519
|
Fri Feb 16 10:02:41 2024 |
JM, OF, CB, AR, EM | Run 35 - cooled beam on target | 11:01
Run 35 started cooled beam on target
Detectors IN (left arm pot =36.5 |
27x | |
|
649
|
Mon Jun 17 06:26:45 2024 |
JM, OF, AK, CB | Change to 5+ beam | 07:00
We are changing to 5+ beam so that
we can access higher energies and possibly |
7x | |
|
315
|
Sun Feb 27 22:03:51 2022 |
JM, OF | Current Status | 23:00
Target Temperature setpoint 95
K |
9x | |
|
316
|
Sun Feb 27 23:17:33 2022 |
JM, OF | Current status | 00:20
Temperature setpoint 115 K
Rutherford rate appears fairly |
10x | |
|
317
|
Mon Feb 28 00:24:05 2022 |
JM, OF | Current status | 01:23
Temperature setpoint = 115 k
Rutherford rates still appears |
7x | |
|
318
|
Mon Feb 28 01:16:02 2022 |
JM, OF | Temperature decrease 115K to 110K | 02:15
Density remains stable at
155 K |
  | |
|
319
|
Mon Feb 28 02:16:00 2022 |
JM, OF | Current status | 03:21
Temperature setpoint 110 K
Rutherford rate stable. Min peak |
6x | |
|
320
|
Mon Feb 28 03:16:37 2022 |
JM, OF | Current status | 04:24
Temperature setpoint 110 K
Rates appeared stable throughout |
6x | |
|
321
|
Mon Feb 28 04:14:26 2022 |
JM, OF | Current status | 05:20
Temperature setpoint = 110 k
Rates are stable however are slightly |
9x |
|