AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 32 of 38  ELOG logo
Entry  Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING 20210901_162435.jpg20210901_173059.jpg20210901_174157.jpg20210901_134635.jpg20210901_173059.jpg
Entry  Fri Aug 12 15:12:37 2022, JM, TD, CARME measurements 9x
Entry  Wed Sep 22 14:44:51 2021, JM RSS ML, CARME leak test + bakeout tent 20210922_145646.jpg20210922_145933.jpg20210922_151728.jpg20210922_152052.jpg20210922_152113.jpg
Entry  Mon Sep 20 11:45:45 2021, JM RSS ML, CARME installations 6x
    Reply  Tue Sep 21 08:20:39 2021, ML, CARME installations 
Entry  Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV 
Entry  Wed Apr 9 10:02:21 2025, TD, CARME equipment in CRYRING area moved 20250409_102115.jpg20250409_101705.jpg
Entry  Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  20230426_152121.jpg20230426_162619.jpg20230426_162627.jpg
Entry  Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING 20210902_114031.jpg
Entry  Tue Jan 16 14:36:30 2024, TD, CARME configuration dhcpd.confOptionsSettingsstartup.tclrfs
Entry  Sun Oct 31 08:05:15 2021, CB OH + DR ML, CARME closed again + feedthroughs labeled 11x
Entry  Thu Jul 13 00:12:45 2023, JM, CB, CARME closed Bias110723.pngfullyin.jpgfullyin-measured.jpg
Entry  Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
Entry  Tue Nov 16 12:05:13 2021, CB RSS, CARME baking with tape continues CARMEtemps.png20211116_132048.jpg20211116_155138.jpg20211116_155857.jpg
Entry  Tue Sep 28 12:18:54 2021, RSS JM, CARME baking status -9 Screenshot_from_2021-09-28_13-17-51_1.pngScreenshot_from_2021-09-28_13-18-18.png
Entry  Tue Sep 28 06:40:22 2021, RSS JM, CARME baking status -8 Screenshot_from_2021-09-28_07-38-53.pngScreenshot_from_2021-09-28_07-39-22.png
Entry  Mon Sep 27 21:33:50 2021, CB (remotely), CARME baking status -7 Temps.pngScreen.png
Entry  Mon Sep 27 06:42:45 2021, RSS JM, CARME baking status -6 Screenshot_from_2021-09-27_07-41-06.pngScreenshot_from_2021-09-27_07-41-39.png
Entry  Sun Sep 26 07:41:00 2021, CB (remotely), CARME baking status -4 Temps.pngScreen.png
Entry  Sat Sep 25 19:01:50 2021, CB (remotely), CARME baking status -3 Temps.PNG
ELOG V3.1.4-unknown