|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
CARME, Page 32 of 38 |
 |
|
Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING    
|
Fri Aug 12 15:12:37 2022, JM, TD, CARME measurements 9x
|
Wed Sep 22 14:44:51 2021, JM RSS ML, CARME leak test + bakeout tent    
|
Mon Sep 20 11:45:45 2021, JM RSS ML, CARME installations 6x
|
Tue Sep 21 08:20:39 2021, ML, CARME installations
|
Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV
|
Wed Apr 9 10:02:21 2025, TD, CARME equipment in CRYRING area moved 
|
Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  
|
Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING
|
Tue Jan 16 14:36:30 2024, TD, CARME configuration    
|
Sun Oct 31 08:05:15 2021, CB OH + DR ML, CARME closed again + feedthroughs labeled 11x
|
Thu Jul 13 00:12:45 2023, JM, CB, CARME closed  
|
Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
|
Tue Nov 16 12:05:13 2021, CB RSS, CARME baking with tape continues   
|
Tue Sep 28 12:18:54 2021, RSS JM, CARME baking status -9 
|
Tue Sep 28 06:40:22 2021, RSS JM, CARME baking status -8 
|
Mon Sep 27 21:33:50 2021, CB (remotely), CARME baking status -7 
|
Mon Sep 27 06:42:45 2021, RSS JM, CARME baking status -6 
|
Sun Sep 26 07:41:00 2021, CB (remotely), CARME baking status -4 
|
Sat Sep 25 19:01:50 2021, CB (remotely), CARME baking status -3
|
|