ID |
Date |
Author |
Subject |
Text |
 |
111
|
Wed Oct 6 15:36:14 2021 |
CB RSS | Neg activation tests -3 | Attempted to activate 2xUHV1400 connected
to bottom C4, channel #2 using P 200 W, t
rise 30 min, t hold 90 min.
|
|
112
|
Thu Oct 7 08:40:09 2021 |
CB RSS | CARME in XHV | CARME reached 9E-12 this morning
Ion pumps on
|
|
113
|
Fri Oct 8 17:56:35 2021 |
CB RSS | Motors test | Attempted first motor test in XHV. Wired
and connected limit switches and string potentiometer.
Set up raspberry pi to control |
 |
114
|
Sat Oct 9 09:44:36 2021 |
CB RSS | Heaters removed + motors tests | Removed thermocouples, heaters, RE72 modules
and leftover baking tent. Support octagon
removed except topmost part which requires |
|
144
|
Sat Nov 6 14:21:10 2021 |
CB RSS | Preparation for bakeout tent mounting + to do for next week | Connected pneumatic hoses prepared by Gleb.
Opened flow to pressure reducer set at 2
bar. Ok. Attempted to operate pneumatic motors. |
|
155
|
Tue Nov 16 12:05:13 2021 |
CB RSS | CARME baking with tape continues | CARME baking with heating tape continues
Left overnight at 100C. Turned
up this morning at 9:00 to 120C. |
   |
157
|
Thu Nov 18 12:29:50 2021 |
CB RSS | Conditioning D2000 NEGs | D2000 thermocouples report temperatures
around 100C (D2000 #1,2) and 120C (3,4).
1,2 are in the intermediate chamber, 3,4 |
 |
158
|
Thu Nov 18 13:50:51 2021 |
CB RSS | Thermocamera images | Used thermocamera provided by GSI beam
diagnostic division to take some pictures
of YR09. See attached. |
14x |
159
|
Fri Nov 19 12:03:51 2021 |
CB RSS | Conditionings NEGs | Increased conditioning temperature in D2000
#3 and 4 (behind detectors) to 150C from
130/140C. No appreciable change in temperature. |
 |
607
|
Sun Jun 9 13:45:24 2024 |
CB PMH AG | Run 55 - Data taking | 14:45
New run 55 with:
Right arm at 64.60 mm |
18x |
137
|
Sun Oct 31 08:05:15 2021 |
CB OH + DR ML | CARME closed again + feedthroughs labeled | (Fri 29 October)
Cleaned wire seal recess and labeled
thermocouples and flanges to identify p-n |
11x |
138
|
Sun Oct 31 13:55:13 2021 |
CB OH | Leak tests | Found CARME at 2E-7.
Closed valve on top of roughing
pump. Clamp was not tight. Pressure still |
|
631
|
Fri Jun 14 14:48:02 2024 |
CB NP ML | [How To] Change target pressure. EMERGENCY ONLY! | ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo
is below 820 Hz, pressure in E1 is above
2.5E-1 mbar and experts (Nikos, Andreas) |
 |
61
|
Tue Sep 7 12:40:43 2021 |
CB ML + RH | CARME survey preparation | Rudi and survey group representative came
to CARME.
|
|
59
|
Mon Sep 6 14:13:17 2021 |
CB ML | Motors mounted - first attempt | Mounted both motors on CARME. Started
with outside motor.
|
    |
701
|
Thu May 29 14:39:52 2025 |
CB LB PMH | Run 31 | 15:40
Waiting for Serge to come in to
change beam energy. |
9x |
703
|
Fri May 30 07:27:41 2025 |
CB LB JM NP EM | Waiting for deuterium | 08:27
No run going.
Temperatures OK - attach |
8x |
133
|
Sun Oct 31 07:21:09 2021 |
CB JM RSS | Detectors arrived in GSI | (Tue 26 October)
Two new CARME DSSD arrived in GSI
and collected. Visually inspected both sides. |
6x |
749
|
Mon Jun 16 10:46:11 2025 |
CB JM JG AK | Run82 | Background without beam while source is
optimised. |
|
132
|
Fri Oct 29 15:09:27 2021 |
CB JM + RSS OG DR | Preparation to mount new DSSDs | (Mon 25 October - Tue 26 October)
Considered different strategies
to mount DSSDs inside CARME, while waiting |
6x |