AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 34 of 36
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
713 Entries
Goto page
Previous
1
,
2
,
3
...
33
, 34,
35
,
36
Next
ID
Date
Author
Subject
Text
163
Fri Nov 26 10:01:45 2021
CB (remotely) ML
Power cut in the CRYRING cave
ML reports power cut in CRYRING cave. Reasons
unknown. No effect on vacuum, but top valve
closed for safety reason. Ramping down temperature.
165
Tue Nov 30 10:49:43 2021
CB (remotely) GV
Gate valve opened
GSI vacuum division IE514 gauge connected.
Gleb reports gate downstream opened.
Vacuum goes up and recovers as expected.
9
Sat Sep 12 08:38:52 2020
CB (remotely)
Baking over the weekend
Saturday 12 Sep 08:43
Remotely checked status of baking. See attached.
10
Sun Sep 13 08:06:25 2020
CB (remotely)
Baking over the weekend -2
Sun 13 Sep 08:06
Baking reached 93 C yesterday afternoon at
13
Wed Sep 16 08:52:03 2020
CB (remotely)
Baking status 16-17 September
16 September
08:50
24
Wed Sep 30 08:10:36 2020
CB (remotely)
First bake of CARME with pumps
(NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
19x
29
Thu Oct 22 22:15:00 2020
CB (remotely)
Cooling down after first NEG activation
Thu 22 October
22:15 Temperatures stables, slowly decreasing.
7x
71
Sun Sep 19 09:11:34 2021
CB (remotely)
Baking RasPi status
Accessed Pi remotely
( 1. Without the Internet, the Pi has no
74
Wed Sep 22 08:30:08 2021
CB (remotely)
CARME pressure during first XHV test
CARME pressure moved to
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
77
Thu Sep 23 14:19:27 2021
CB (remotely)
Checking baking remotely - instructions
1. Connect to pi on CRYRING local network
ssh pi@192.168.207.127
81
Fri Sep 24 15:36:34 2021
CB (remotely)
CARME baking status
Current temperature ~64 C
See plots attached
82
Sat Sep 25 07:23:06 2021
CB (remotely)
CARME baking status -2
Current temperature ~90 C
However note setpoint is at 102 C. It appears
we are baking at full power, but too many
83
Sat Sep 25 19:01:50 2021
CB (remotely)
CARME baking status -3
Baking automatically stopped due to negative
gradient in on thermocouple for 10 minutes
straight.
84
Sun Sep 26 07:41:00 2021
CB (remotely)
CARME baking status -4
Current temperature ~87C
See plot and screen attached.
87
Mon Sep 27 11:09:48 2021
CB (remotely)
Temperature vs Pressure plot
Attached.
89
Mon Sep 27 21:33:50 2021
CB (remotely)
CARME baking status -7
Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may
100
Fri Oct 1 21:47:51 2021
CB (remotely)
CARME baking status -16
Current temperature ~132 C (on manual mode
RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
164
Sun Nov 28 15:57:45 2021
CB (remotely)
Nov 2021 temperatures
Attached
166
Tue Dec 7 09:39:59 2021
CB (remotely)
Gate valves closed
Dry run complete.
YR09 section valves closed. Section
isolated. Manual valve between electron target
671
Thu Apr 10 07:02:12 2025
CB (remotely)
Current logging enabled - sort of
There appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns
Goto page
Previous
1
,
2
,
3
...
33
, 34,
35
,
36
Next
ELOG V3.1.4-unknown