AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 34 of 36  ELOG logo
ID Date Authordown Subject Text Attachments
  163   Fri Nov 26 10:01:45 2021 CB (remotely) MLPower cut in the CRYRING caveML reports power cut in CRYRING cave. Reasons
unknown. No effect on vacuum, but top valve
closed for safety reason. Ramping down temperature.
  
  165   Tue Nov 30 10:49:43 2021 CB (remotely) GVGate valve openedGSI vacuum division IE514 gauge connected.

Gleb reports gate downstream opened.
Vacuum goes up and recovers as expected.
 vacplot24.png 
  9   Sat Sep 12 08:38:52 2020 CB (remotely)Baking over the weekendSaturday 12 Sep 08:43

Remotely checked status of baking. See attached.
 20200912_0839_ctrl.png20200912_0839_plot.png 
  10   Sun Sep 13 08:06:25 2020 CB (remotely)Baking over the weekend -2Sun 13 Sep 08:06

Baking reached 93 C yesterday afternoon at
 20201309_0806_ctrl.png20201309_0806_plot.png 
  13   Wed Sep 16 08:52:03 2020 CB (remotely)Baking status 16-17 September16 September

08:50
 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png 
  24   Wed Sep 30 08:10:36 2020 CB (remotely)First bake of CARME with pumps(NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
 19x 
  29   Thu Oct 22 22:15:00 2020 CB (remotely)Cooling down after first NEG activationThu 22 October

22:15 Temperatures stables, slowly decreasing.
 7x 
  71   Sun Sep 19 09:11:34 2021 CB (remotely)Baking RasPi statusAccessed Pi remotely 

( 1. Without the Internet, the Pi has no
  
  74   Wed Sep 22 08:30:08 2021 CB (remotely)CARME pressure during first XHV testCARME pressure moved to

https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
  
  77   Thu Sep 23 14:19:27 2021 CB (remotely)Checking baking remotely - instructions1. Connect to pi on CRYRING local network

ssh pi@192.168.207.127
 Temp.png 
  81   Fri Sep 24 15:36:34 2021 CB (remotely)CARME baking statusCurrent temperature ~64 C

See plots attached
 Temp.pngTemps.png 
  82   Sat Sep 25 07:23:06 2021 CB (remotely)CARME baking status -2Current temperature ~90 C
However note setpoint is at 102 C. It appears
we are baking at full power, but too many
 temp_plot.pngtemps.png 
  83   Sat Sep 25 19:01:50 2021 CB (remotely)CARME baking status -3Baking automatically stopped due to negative
gradient in on thermocouple for 10 minutes
straight. 
 Temps.PNG 
  84   Sun Sep 26 07:41:00 2021 CB (remotely)CARME baking status -4Current temperature ~87C

See plot and screen attached.
 Temps.pngScreen.png 
  87   Mon Sep 27 11:09:48 2021 CB (remotely)Temperature vs Pressure plotAttached.  Temps.pdf 
  89   Mon Sep 27 21:33:50 2021 CB (remotely)CARME baking status -7Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may
 Temps.pngScreen.png 
  100   Fri Oct 1 21:47:51 2021 CB (remotely)CARME baking status -16Current temperature ~132 C (on manual mode
RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
 screen.pngTemps.png 
  164   Sun Nov 28 15:57:45 2021 CB (remotely)Nov 2021 temperaturesAttached  211128164424_temperatures.zip 
  166   Tue Dec 7 09:39:59 2021 CB (remotely)Gate valves closedDry run complete.

YR09 section valves closed. Section
isolated. Manual valve between electron target
  
  671   Thu Apr 10 07:02:12 2025 CB (remotely)Current logging enabled - sort ofThere appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns
  
ELOG V3.1.4-unknown