AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 34 of 36  ELOG logo
ID Date Authordown Subject Text Attachments
  82   Sat Sep 25 07:23:06 2021 CB (remotely)CARME baking status -2Current temperature ~90 C
However note setpoint is at 102 C. It appears
we are baking at full power, but too many
 temp_plot.pngtemps.png 
  83   Sat Sep 25 19:01:50 2021 CB (remotely)CARME baking status -3Baking automatically stopped due to negative
gradient in on thermocouple for 10 minutes
straight. 
 Temps.PNG 
  84   Sun Sep 26 07:41:00 2021 CB (remotely)CARME baking status -4Current temperature ~87C

See plot and screen attached.
 Temps.pngScreen.png 
  87   Mon Sep 27 11:09:48 2021 CB (remotely)Temperature vs Pressure plotAttached.  Temps.pdf 
  89   Mon Sep 27 21:33:50 2021 CB (remotely)CARME baking status -7Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may
 Temps.pngScreen.png 
  100   Fri Oct 1 21:47:51 2021 CB (remotely)CARME baking status -16Current temperature ~132 C (on manual mode
RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
 screen.pngTemps.png 
  164   Sun Nov 28 15:57:45 2021 CB (remotely)Nov 2021 temperaturesAttached  211128164424_temperatures.zip 
  166   Tue Dec 7 09:39:59 2021 CB (remotely)Gate valves closedDry run complete.

YR09 section valves closed. Section
isolated. Manual valve between electron target
  
  671   Thu Apr 10 07:02:12 2025 CB (remotely)Current logging enabled - sort ofThere appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns
  
  49   Tue Aug 31 18:56:35 2021 CBCARME status(ELOG does not allow more pictures to be added
to previous entry)
 9x 
  115   Sat Oct 9 09:47:33 2021 CBTo do list for next week0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split.
 Capture.PNG 
  194   Mon Feb 14 09:56:39 2022 CBShifters instructions 2022EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
 10x 
  236   Tue Feb 22 12:23:23 2022 CBSlow comparator thresholds lowered - test run13:20 Stopped run.

Slow comp thresh 0x64 -> 0x32
on all FEEs
  
  282   Fri Feb 25 11:20:30 2022 CBPressure and temperature data savedSaved pressure reading and temperature
data logs from internal target in /TapeServer/22Feb/OtherData

Leakage current data is saved in
  
  437   Wed Aug 30 10:28:36 2023 CBPreparing for pumps onWe need to connect the non-bakeable (max
80C) wire of the ion pump belonging to the
vacuum division, and we also need to connect
  
  438   Thu Aug 31 08:36:34 2023 CBNEG activation Found CARME at 50C, a bit cooler than expected,
probably due to invasive tent changes yesterday
to mount missing wires. Increased heaters
  
  439   Fri Sep 1 08:11:40 2023 CBNEG activation - 29:10 Set heaters temperature 300 ->
250 C in preparation for cooling down and
to help keep DSSD temperature down. Started
  
  440   Sat Sep 2 10:04:55 2023 CBTurbo GV closed Found CARME in XHV at 1.1E-11 mbar. Chamber
temperature around 30C cooling slowly.

Closed GV to top turbo. Pressure
  
  453   Sun Oct 15 09:35:03 2023 CBStarting ramp down10:40 - Status as attached. Heaters setpoint/read
at 250 C, 150 C, 225 C. Power stable at 53%,
41%, 63%
 Screenshot_2023-10-15_10-35-47.pngScreenshot_2023-10-15_17-56-00.png 
  454   Mon Oct 16 08:28:02 2023 CBNEG activation -19:00 - Michael's online vacuum pressure
plot is no longer working - an old image
is being displayed. CARME temperatures around
 Screenshot_2023-10-16_17-17-30.png 
ELOG V3.1.4-unknown