ID |
Date |
Author |
Subject |
Text |
 |
82
|
Sat Sep 25 07:23:06 2021 |
CB (remotely) | CARME baking status -2 | Current temperature ~90 C
However note setpoint is at 102 C. It appears
we are baking at full power, but too many |
 |
83
|
Sat Sep 25 19:01:50 2021 |
CB (remotely) | CARME baking status -3 | Baking automatically stopped due to negative
gradient in on thermocouple for 10 minutes
straight.
|
|
84
|
Sun Sep 26 07:41:00 2021 |
CB (remotely) | CARME baking status -4 | Current temperature ~87C
See plot and screen attached.
|
 |
87
|
Mon Sep 27 11:09:48 2021 |
CB (remotely) | Temperature vs Pressure plot | Attached. |
|
89
|
Mon Sep 27 21:33:50 2021 |
CB (remotely) | CARME baking status -7 | Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may |
 |
100
|
Fri Oct 1 21:47:51 2021 |
CB (remotely) | CARME baking status -16 | Current temperature ~132 C (on manual mode
RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
|
 |
164
|
Sun Nov 28 15:57:45 2021 |
CB (remotely) | Nov 2021 temperatures | Attached |
|
166
|
Tue Dec 7 09:39:59 2021 |
CB (remotely) | Gate valves closed | Dry run complete.
YR09 section valves closed. Section
isolated. Manual valve between electron target |
|
671
|
Thu Apr 10 07:02:12 2025 |
CB (remotely) | Current logging enabled - sort of | There appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns |
|
49
|
Tue Aug 31 18:56:35 2021 |
CB | CARME status | (ELOG does not allow more pictures to be added
to previous entry) |
9x |
115
|
Sat Oct 9 09:47:33 2021 |
CB | To do list for next week | 0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split. |
|
194
|
Mon Feb 14 09:56:39 2022 |
CB | Shifters instructions 2022 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
10x |
236
|
Tue Feb 22 12:23:23 2022 |
CB | Slow comparator thresholds lowered - test run | 13:20 Stopped run.
Slow comp thresh 0x64 -> 0x32
on all FEEs |
|
282
|
Fri Feb 25 11:20:30 2022 |
CB | Pressure and temperature data saved | Saved pressure reading and temperature
data logs from internal target in /TapeServer/22Feb/OtherData
Leakage current data is saved in |
|
437
|
Wed Aug 30 10:28:36 2023 |
CB | Preparing for pumps on | We need to connect the non-bakeable (max
80C) wire of the ion pump belonging to the
vacuum division, and we also need to connect |
|
438
|
Thu Aug 31 08:36:34 2023 |
CB | NEG activation | Found CARME at 50C, a bit cooler than expected,
probably due to invasive tent changes yesterday
to mount missing wires. Increased heaters |
|
439
|
Fri Sep 1 08:11:40 2023 |
CB | NEG activation - 2 | 9:10 Set heaters temperature 300 ->
250 C in preparation for cooling down and
to help keep DSSD temperature down. Started |
|
440
|
Sat Sep 2 10:04:55 2023 |
CB | Turbo GV closed | Found CARME in XHV at 1.1E-11 mbar. Chamber
temperature around 30C cooling slowly.
Closed GV to top turbo. Pressure |
|
453
|
Sun Oct 15 09:35:03 2023 |
CB | Starting ramp down | 10:40 - Status as attached. Heaters setpoint/read
at 250 C, 150 C, 225 C. Power stable at 53%,
41%, 63% |
 |
454
|
Mon Oct 16 08:28:02 2023 |
CB | NEG activation -1 | 9:00 - Michael's online vacuum pressure
plot is no longer working - an old image
is being displayed. CARME temperatures around |
|