Wed Apr 23 11:08:34 2025, TD, JM, Background Run 10x
|
12.08 DSSSD bias & leakage current - attachments 1-2
CAEN logger program crashed sometime this am - now restarted
|
Tue Apr 22 06:44:02 2025, TD, Tuesday 22 April    
|
07.40 DSSSD bias & leakage current - attachments 1-3
CAEN logger program crashed c. 18.00 April 20 - now restarted
|
Sun Apr 20 07:30:29 2025, CB, DSSD leakage currents over Easter  
|
Just after midnight on 20/04 it appears DSSD #4 leakage current has perfectly stabilised. See attached.
DSSDs remain biased.
|
Fri Apr 18 16:18:33 2025, JM, D+D BBN energies test 16x
|
D+D minimum energy Ecm = 150 keV which corresponds to Ed=150 keV/u or Ed=300 keV. Therefore we need a threshold below this.
Test 1 - Current status
Current slow comparator threshold is 0x64 (1 MeV). ADC data items rate in all FEEs is essentially zero with this threshold. (except aida03 and |
Fri Apr 18 08:17:38 2025, JM, More testing 15x
|
09:10
Arrived at GSI. Leakage currents status same as before, DSSD4 is still fluctuating. DSSD1 and DSSD3 currents are definitely lower again compared
to previous days. I am convinced they are decreasing over time, whether this will be enough for our measurement.... |
Thu Apr 17 08:51:29 2025, JM, Grounding cont. 29x
|
09:00
Came in to see the bias for DSSD4 which has been fluctuating for the past few days had tripped during the night. From the gnuplot it looks like
it was fluctuating all night and just after midnight it went above 20uA and tripped. |
Wed Apr 16 08:20:05 2025, JM, Grounding 14x
|
09:00
Leakage currents this morning again appear to have lowered during the night. Current plot shows a day/night variation but I think the minimum
is decreasing ever so slightly. |
Tue Apr 15 12:23:10 2025, JM, Leakage current / CARME issues 18x
|
14/04/25
Arrived at GSI in the afternoon.
Found that the coolant loop on aida08 had popped out which resulted in the high FEE temperatures observed (see attachment 1). Female swagelock |
Thu Apr 10 10:53:14 2025, TD, Thursday 10 April 8x
|
11.50 DAQ continues
Data file APR25/R6_13
|
Thu Apr 10 07:02:12 2025, CB (remotely), Current logging enabled - sort of
|
There appear to be issues with Shahab's caenlogging program. It crashes occasionally, with an error indicating the number of columns in the terminal
is incorrect. We will have to ask Shahab.
For now |
Wed Apr 9 10:02:21 2025, TD, CARME equipment in CRYRING area moved 
|
There was some tidying up of the CRYRING hall in advance of this week's EC evaluation meeting at GSI.
|
Wed Apr 9 02:40:04 2025, TD, Wednesday 9 April 11x
|
03.37 DAQ continues
Data file APR25/R5_8
|
Tue Apr 8 10:46:13 2025, TD, Tuesday 8 April 27x
|
11.30 CRYRING vacuum and temperature - attachments 1-2
|
Mon Apr 7 08:59:41 2025, TD, Monday 7 April 8x
|
10.00 FEE64 power ON
CARME IE514 OFF
|
Sun Apr 6 14:21:53 2025, TD, [How To] Startup CARME
|
- water flow/interlock checks
check water flow to/from inflow/outflow manifolds
|
Sun Apr 6 11:40:48 2025, TD, Options DB reconstructed
|
Options directory corrupted unable to change Options settings per https://elog.ph.ed.ac.uk/CARME/664
Move old Options directory to Options.BAK-060425
|
Sun Apr 6 10:17:49 2025, TD, Sunday 6 April 15x
|
11.15 CARME IE514 ion gauge remains OFF
ML says there are 2x ion gauges with line of sight to the DSSSDs - CARME IE514 (now off) and another controlled by the vacuum group - he will request |
Sat Apr 5 16:15:04 2025, TD, FEE64 power interlock installed 11x
|
Water flow and dew point sensors have been installed on the outlet and inlet cooling water manifolds respectively.
|
Sat Apr 5 16:13:32 2025, TD, Saturday 5 April 7x
|
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
Fri Apr 4 10:17:16 2025, TD, Friday 4 April
|
10.43 Reboot carme-gsi - unable to open a working terminal
|
Mon Mar 10 15:47:27 2025, TD, Analysis data files G22-201 R79_10 & R79_24 
|
Analysis of data files G22-201 R79_10 and R79_24 - attachments 1-2
|
Tue Jul 2 17:43:32 2024, TD, Offline analysis G22-201/R89 9x
|
Offline analysis data file G22-201/R89_0 to R89_13 (c. 6h40m data)
DSSSD#1 & 3 36.54mm -> ~ 2.3-8.6 deg
|
Wed Jun 19 12:11:22 2024, CB, RSS, CARME status
|
DSSD off
FEEs off
Motors out, pin inserted, compressed air closed, power removed from motors box. |
Wed Jun 19 12:08:34 2024, CB + various, Run 101-105
|
Run 101: no target. See ELOG entry by TD.
Run 102: ??
Run 103: ?? |
Wed Jun 19 12:06:50 2024, CB, OF, SS, Run 98/99/100 - higher energy
|
10:21 June 17
New energy: 1.125 MeV/u
Target in. Run 98 started. |
Wed Jun 19 12:04:02 2024, CB + OF, SS, Run 96/97
|
Run 96 - as run 89, while we wait for beam energy change at higher energies
Run stopped around 08:56 June 17
|
Wed Jun 19 12:01:29 2024, TD, 23:00-07:00 Wednesday 19 June 23x
|
23.18 DSSSD bias & leakage current OK - attachment 1
FEE64 temps OK - attachment 2
ADC data item stats attachment 3
|
Wed Jun 19 12:00:56 2024, CB, Run 93/94/95 - background 6x
|
04:00 17 June
Moved the detectors back to the usual configuration (as per run 89).
Moved target away - background run. |
Wed Jun 19 11:54:26 2024, CB, Run 91/92 - moving detectors    
|
~ 2:00 17 June
Run 91 |
Mon Jun 17 23:10:08 2024, CB, Run 90 
|
00:10
As run 89, detectors moved fully out.
|
Mon Jun 17 16:26:00 2024, JM, RSS, CB, Run 89 19x
|
17:20
(Run 87 Junk and Run 88 does not exist)
Beam charge state set to 5+. Energy is ~1.06 MeV/u |
Mon Jun 17 06:26:45 2024, JM, OF, AK, CB, Change to 5+ beam 7x
|
07:00
We are changing to 5+ beam so that we can access higher energies and possibly observe a higher lying, wider resonance.
Beam energy change to 1.06 MeV/u. |
Mon Jun 17 05:47:35 2024, JM, Run 86
|
06:50
No sign of the resonance during night shift. New run started but when operators are avaiable we will likely move to higher energies to try and
observe the (p,a) reaction. |
Mon Jun 17 04:01:16 2024, JM, Run 85
|
05:00
Cooler voltage setpoint 247.45 V.
FC20 read value 246.9 V. |
Mon Jun 17 02:05:37 2024, JM, Run 84
|
03:00
Cooler voltage setpoint 247.7 V.
FC20 read value 247.15 V. |
Mon Jun 17 00:05:13 2024, JM, Run 83
|
01:00
Cooler voltage setpoint 247.6 V.
FC20 read value 247.05 V. |
Sun Jun 16 22:49:22 2024, JM, Run 82
|
23:38
Cooler voltage setpoint 247.5 V.
FC20 read value 246.95 V. |
Sun Jun 16 22:40:11 2024, JM, Target overlap test - R81
|
23:10
Beam set to bunched mode to observe beam lifetime.
Electron cooler voltage setpoint kept at 246.8 V. Note this is 0.5 V lower than the previous test where the setpoint was 247.3 V |
Sun Jun 16 19:01:30 2024, ML, EM, Run 80
|
20:00
Ecooler setpoint 246.8
Readout 246.25 |
Sun Jun 16 13:51:11 2024, CB EM ML, Run 79 7x
|
14:51
Ecooler setpoint 246.9
Readout 246.35 |
Sun Jun 16 13:29:05 2024, RSS CB, Run 78
|
Target clogged? |
Sun Jun 16 06:02:31 2024, RSS, Run 77 20x
|
Run 77 started at 06:48
Cooler voltage setpoint 247.0 V.
|
Sat Jun 15 21:14:56 2024, JM, JS, LC, Run 76
|
22:15
New run 76 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.1 V. |
Sat Jun 15 13:30:18 2024, JM, JS, Run 75  
|
14:30
New run 75 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.2 V. |
Sat Jun 15 06:10:21 2024, EM, PMH, Run 74 6x
|
7:00
Cooler voltage setpoint 247.4 V.
|
Sat Jun 15 00:46:45 2024, TD, CRYRING hall temperature transient
|
CRYRING hall temperature transient - evening of Friday 14 June
Cooling of recirculating water failed on a number of circuits within the GSI experimental hall including S4 and CRYRING
|
Fri Jun 14 22:18:18 2024, RSS, CB, US, Run 73 20x
|
Beam is back.New run started.
Cooler voltage setpoint 247.3 V. |
Fri Jun 14 19:59:14 2024, US, LC, CB, New run with name of 72 is started due to target issue 
|
21:00
Target is lost. Background run is being collected.
New run 72 - beam on target with definite target overlap [coasting] |
Fri Jun 14 14:52:02 2024, JM, Beam-Target Overlap Scan 
|
The orbit of the beam in the ring was re-configured so that the beam position is more central.
With the target density at ~6e11 at/cm2 this allowed a target overlap scan using the beam lifetime to be performed.
Beam put into bunched mode to allow the number of particles to be observed on Grafana. |
Fri Jun 14 14:48:02 2024, CB NP ML, [How To] Change target pressure. EMERGENCY ONLY! 
|
ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo is below 820 Hz, pressure in E1 is above 2.5E-1 mbar and experts (Nikos, Andreas) cannot be reached.
Go to the red cabinet under the stairs. |
Fri Jun 14 14:46:54 2024, LC, JM, CB, TD, US, Run 71 - beam on target   
|
15:45
New run 71 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.3 V. |
Fri Jun 14 13:45:21 2024, JM, JS, CB, TD, EH, Run 70 - beam on target 7x
|
14:45
New run 70 - beam on target with definite target overlap
Cooler voltage setpoint 247.3 V. |
Fri Jun 14 10:21:24 2024, JS, TD, Run 68 9x
|
Frank has been tuning the beam since 08:00
detectors moved fully out
11:20 |
Thu Jun 13 23:01:07 2024, RSS, JS, EH, Run 67 - Night shift 20x
|
Run 67
00:01
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats OK - |
Thu Jun 13 21:07:30 2024, LCS, US, Run 67- beam on target 7x
|
22:05
The energy is changed to 247.4 V.
Read back value is 246.849 V. |
Thu Jun 13 14:46:17 2024, TD, R66 beam overlap test
|
15.45 Start data file G22-201/R66
Beam/target overlap test |
Thu Jun 13 09:48:25 2024, TD, LCS, Run 65 - beam on target 14x
|
10:47
The energy is changed to 247.4 V.
Read back value is 246.849 V. |
Thu Jun 13 06:21:53 2024, TD, LCS, Run 64 - contd 13x
|
07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment 1
|
Thu Jun 13 00:50:33 2024, JM, JS, Run 64 - beam on target
|
01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
Wed Jun 12 07:16:47 2024, RSS, YL, JM, TD, CB, Status 6x
|
07:56 Gleb has taken the beam to try settings for the 5+ charge state. As soon as the target is ready, the 1+ charge state will be given back.
Detectors have been moved out for safety
08:10
Run 63
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
|
Tue Jun 11 21:16:50 2024, TD, Run 63 continued 17x
|
Run 63 continued
22.06 DSSSD bias & leakage current OK - attachment 1
|
Tue Jun 11 20:10:25 2024, JM, Run 63 - Beam only background
|
21:00
Claude has achieved optimal cooling parameters for the beam
No target and internal work inside the cave tomorrow is required |
Tue Jun 11 19:44:48 2024, OF, SS, Target out and at He
|
Target has been moved out and H2 switched off. Changed to He.
Nikos will repair nozzle tomorrow morning. Remote checks until then. |
Tue Jun 11 12:26:07 2024, RSS, JS, JM, CB, Run 62 - Beam optimization + Target change
|
Beam optimization and target change |
Tue Jun 11 08:34:50 2024, JM, RSS, JS, Run 61 - beam on target   
|
New run 61
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
Tue Jun 11 04:36:17 2024, CB, RSS, JS, Run 60 - as 59, left servo in 11x
|
05:36
Run started.
Conditions as before, except left servo now really in. |
Mon Jun 10 20:31:12 2024, JM, AK, EH, CB, Run 59 Beam on target 18x
|
21:32
New run 59
Right arm at 64.60 mm |
Mon Jun 10 18:22:47 2024, JM, Electron cooler calculations  
|
Ion beam energy is calculated using Beamcalc (https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)
Electron current is set to 4.3 mA and can be taken from Grafana
Alpha factor is 50 |
Mon Jun 10 14:26:52 2024, EH, AK, Run 58 8x
|
15:30
Merger OK, Tape server OK
ADC data item statistics OK |
Mon Jun 10 12:49:56 2024, RSS, DB, CB, JM, R58 Space Charge Test   
|
13:53
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment
3
per FEE64 Rate spectra - attachment 4
Beam intensity - ~ 5.0E7 pps
Target density - off
|
Mon Jun 10 07:40:47 2024, RSS, DB, Beam
|
08:26: There is no beam and Gleb is informed.
08:46: Beam is back. |
Mon Jun 10 05:24:49 2024, TD, RSS, DB, R57 16x
|
06:45 New data file G22-201/R57
Right arm at 64.60 mm
|
Sun Jun 9 22:14:23 2024, TD, PM, AG, Run 56 - Data taking 31x
|
23:15 New run 56 with
Right arm at 64.60 mm
|
Sun Jun 9 13:45:24 2024, CB PMH AG, Run 55 - Data taking 18x
|
14:45
New run 55 with:
Right arm at 64.60 mm |
Sun Jun 9 09:45:27 2024, JM, CB, Beam-Target Overlap
|
Target density this morning had stabalised at 7e11 at/cm2
This is sufficient to test the beam/target overlap using the lifetime of the beam in the ring.
Previous attempt at this method was done at 1.5e11 at/cm2 where lifetime from residual gas and target are essentially the same. |
Sun Jun 9 08:30:49 2024, JM, CB, Run 54 - beam on target 7x
|
09:30
New run 54 with:
Electron cooler setpoint 244.1 V |
Sat Jun 8 20:32:17 2024, LB, JM, Run 52 - beam on target    
|
New run 52 with:
Electron cooler setpoint 244.2 V
Electron cooler read 243.66 V |
Sat Jun 8 17:46:12 2024, TD, [How To] Cycle Left DSSSDs
|
Interactive Motion Program [workspace 6, display 2]
|
Sat Jun 8 14:49:14 2024, TD, R51 - contd 30x
|
15.40 DSSSD bias & leakage current OK - attachments 1-2
log shows variations due to ambient temperature changes in CRYRING hall
|
Sat Jun 8 10:13:52 2024, CB, JM, TD, Run 50/51 - data taking 8x
|
11:13
ML enabled ring signals remotely.
Used FakeMotion.dat (read FakeMotion.dat from InteractiveMotion.x). |
Sat Jun 8 06:13:21 2024, CB, Run 47/48/49 - target issues & tests    
|
07:00
After putting the target back, we observe strong periodic (5 s) fluctuations going from 3E11 to 5E12. The reason is unclear. One may warm up
the target to solve this, but will ask Nikos later instead. |
Sat Jun 8 00:14:39 2024, LB, Run 46 - background with beam 22x
|
RUN 46- started at 00:50
Horizontal beam position = 4.0 mm, vertical beam position = -5.0 mm.
Detectors are Left arm OUT = 36.64, right arm IN = 64.60 mm |
Fri Jun 7 22:33:13 2024, LB, Run 45 - tests on beam-target overlap    
|
Tried to double check beam-target overlap by changing beam horizontal coordinate.
In the tablethe counts in the 4000-5200 keV region in each of the detectors are recorded. Counts were taken for a total time of 5 minutes per
beam position. Attached are the xy plots. |
Thu Jun 6 16:23:10 2024, LB CB JM, Run 39 - Run 40 15N 15x
|
Started run 39.
We have the 15N+ beam with 426 keV/nucleon. We see a peak in detector top left (mostly) and bottom right, at 4600 keV. We think it is the beam |
Fri Jun 7 15:53:35 2024, TD, DSSD leakage current increase - temperature increase in CRYRING hall
|
Re-increase in DSSSD leakage current c. 14-15.00 6.6.24
There was a significant temperature spike in the CRYRING hall on the afternoon of 6.6.24 which has, partly, recovered - see attachment 1
Quote:
|
Fri Jun 7 14:09:04 2024, JM, CB, DR, CN, LB, Run 44 - 15N Data Taking
|
15:35
Electron cooler voltage set point = 244.3 V
Electron cooler voltage readout = 243.75 V |
Fri Jun 7 10:05:40 2024, CB, Run 41/42/43 - 15N data taking start 8x
|
11:05
Confirmed overlap is at 4 mm under new settings.
For unclear reasons, the bottom-left detector is not seeing the halo anymore since around 10:00. Rutherford still visible and if the left arm |
Thu Jun 6 05:44:45 2024, DR YL DB LB CB JM, Run 38 - 15N Tests 8x
|
06:45
All system checks OK
Target density 3.4e11 |
Wed Jun 5 13:34:02 2024, JM, Run 37 - Change in thresholds
|
14:20
Target nozzle currently being replaced. No beam
We have decided to switch to 15N beam from now on. |
Wed Jun 5 13:21:45 2024, JM, CB, Run 36 - pulser walkthrough   
|
14:00
Access to the cave as Nikos and Andreas have begun work on the target.
Run 36 started - pulser walkthrough. |
Wed Jun 5 08:34:04 2024, JM. DB, PC, Target nozzle change
|
09:30
Target density has not improved despite efforts last night. Mid 10 - low 11 density range. We will try to change the nozzle.
Target nozzle moved to the out position. |
Tue Jun 4 19:19:26 2024, TD, [How To] Recover DAQ when one FEE64 stops sending data
|
1) STOP DAQ [workspace 2, display 1, browser tab 'Run Control']
all FEE64s should change status from 'going' to 'stopped' *except* whichever FEE64(s) have a problem - typically their status is 'going' or 'error'
|
Tue Jun 4 18:08:04 2024, Boudefla Dounia - CB - LB - SD, Run 34 19x
|
19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm. |
Tue Jun 4 15:25:36 2024, BD US CB, Run 33   
|
16:26
Merger OK, Tape server OK
ADC data item statistics looks as before. OK |
Tue Jun 4 14:13:17 2024, JM, CB, DB, US, Run 32- beam only background
|
15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV. |
Tue Jun 4 06:56:02 2024, DFF, PC, LB, JM,NP,AB, Run 31 contd 
|
8:13
Since 6:40 the target density dramatically dropped to 10^9 since then it has been unstable and did not recover. Currently it is around 8e8.
09:00 |
Tue Jun 4 00:04:39 2024, DR, EH, Run 31
|
Beam energy = 3 MeV
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7 |
Mon Jun 3 21:37:20 2024, CN, EM, CB, Run30  
|
Beam energy = 3 MeV
Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7 |
Mon Jun 3 15:17:41 2024, CN, EM, CB, Run29    
|
16:15
In the previous run while working on the target it was discovered that the valve was closed! Probaly this happened around 10 am, we are not sure.
The gas target inlet valve is open again, working on the target. |
Mon Jun 3 15:10:12 2024, CN, EM, CB, Run28   
|
16:10
We start a new run after doing some test with the motor. Injection time is now a 6s, moving of the motors is working fine.
Merger OK, Tape server OK |
Mon Jun 3 11:46:07 2024, SD, SHB, JM, CN, EM, Run 27 12x
|
12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV |
Mon Jun 3 08:43:22 2024, SD, SHB, Run 26 8x
|
09:44
Run 26 started - Beam no target
Beam energy is being increased from 1.5 to 3 MeV |
Sun Jun 2 23:38:17 2024, JM, EM, Run 25 32x
|
00:38
Run 25 started - Beam on target
Beam energy = 1.5 MeV. |
Sun Jun 2 22:46:47 2024, JM, EM, NP, Run24  
|
23:47
Run 24 started - Beam on target
Beam energy is 1.5 MeV. |
Sun Jun 2 14:30:16 2024, TD, Offline analysis G22-201/R22_0 - R22_11 8x
|
Offline analysis data file G22-201/R22_0 to R22_11
Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
|
Sun Jun 2 13:04:41 2024, JM, AG, CB, DR, Run 23 - vertical beam position and beam lifetime tests
|
14:05
Run 22 stopped. Run 23 started we will now adjust the vertical beam position to see if we observe the beam stripe seen in the last beamtime.
Current vertical beam position 0.0 mm. Horizontal beam position 7.0 mm. Coasting beam. |
Sun Jun 2 08:47:01 2024, CB, AG, Run 22 - longer rung with 20 min storage    
|
09:47
12 seconds pre acc
200x cycles |
Sun Jun 2 06:41:00 2024, CB, AG, Run 21 - tests 10x
|
07:41
Switching to bunched beam to check D vs H content.
8:24 |
Sat Jun 1 21:56:17 2024, JM, EM, EM, TY, CB, AG, Run 20 18x
|
22:56
Run 20 started - beam on target
Beam energy is 1.5 MeV. Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm. |
Sat Jun 1 16:38:13 2024, TD, Offline analysis G22-201/R17 8x
|
Offline analysis data file G22-201/R17
Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
|
Sat Jun 1 13:33:50 2024, TD, Offline analysis APR24/R3 (alpha background) 9x
|
Offline analysis data file APR24/R3 (alpha background)
|
Sat Jun 1 07:16:15 2024, CB, AB, EM, JM, Run 19 - beam target overlap 19x
|
Morning shift
08:16 - as run 18, target off
9:00 Increased storage time to 5 minutes. Aquired data after initial beam loss. Attach 1 &2. Far less H2+ vs D. |
Fri May 31 21:53:20 2024, CB EM, JM,EM AB, Overnight beam tests 17x
|
22:53
Run 15 started
Beam tests. We increased the storage time to 2min and switched to bunched beam so that we can see the beam lifetime over the cycle. |
Fri May 31 21:03:21 2024, CB, EM, Run14  
|
22:03
Before this run we checked quickly beam with the target on but it does not make sense with the current status of the beam.
We removed target and starte Run14 |
Fri May 31 19:12:01 2024, CB, EM, Run 13 - test with beam  
|
20:00
The beam is set at the correct energy, operators cross-checked it again. What we see at 750 is due to the molecular beam. The operotors
are trying to optimize and get rid of this in the next 30min. |
Fri May 31 06:01:55 2024, JM, TY, PW, EM, CB, Run 12 - beam on target 12x
|
07:00
Run 12 started. D+ beam is incident on the target at 1.5 MeV
Beam intensity in the ring is ~4e7 particles |
Thu May 30 13:31:01 2024, JM, CB, PW, YL, Run 11 - beam on target overlap   
|
14:30
Run 11 started. D+ beam in the ring at 1.5 MeV.
No target at the moment. Valves to the interaction chamber will soon be opened. |
Thu May 30 09:30:33 2024, CB, PW, YL, TD, Run 10 13x
|
10:30
Merger OK, Tape server OK
ADC data item statistics looks as before. OK |
Thu May 30 08:33:21 2024, CB, PW, YL, Run 8 & 9- detector motion tests 7x
|
09:34 - Moved to Run 9 in preparation of moving detectors. No target yet. Beam in the ring at 750 keV/A.
Temperatures OK (attach)
System wide checks OK except 16 fails clock and ADC calib |
Thu May 30 07:25:53 2024, Yuri, Phil, Nikos, Gas target
|
The cave is closed and beam is back
The d intensity is about half of the intensity before the break
The gas target is prepared but the valvas cannot be opened. Anton is coming in at around 1 PM to open the gate valves. |
Thu May 30 06:00:51 2024, Yuri Nikos ..., Open the cave
|
Nikos needs to enter the cave to work on the target cooling.
|
Wed May 29 17:42:06 2024, TD, Offline analysis APR24/R2 (pulser walkthrough) 17x
|
ADC offsets using pulser walkthrough data from data file APR24/R2
ch = channel + ( module * 64 ) + ( range * 2048 )
|
Wed May 29 16:46:21 2024, NP, AB, PM, Run7 - Measurements only with ion beam. 
|
18:19 Start or run 7: In beam has been optimzed up to now by Zoran and Claude. ~7E7 particles at injection. From now on, only the injection beamline
is optimized by Operators.
Detectors IN (left arm pot =18.86 mm, right arm pot = 19.80 mm) |
Wed May 29 09:49:35 2024, JM, CB, Threshold changes / D+ beam   
|
09:00
R4 alpha background continues, currently R4_12
Temps OK, system checks unchanged from previous status (OK, aida16 clock and ADC issue) |
Wed May 29 08:10:32 2024, JM, Run4 - alpha background
|
09:00
R4 alpha background continues, currently R4_12
Temps OK, system checks unchanged from previous status (OK, aida16 clock and ADC issue) |
Tue May 28 15:25:21 2024, TD, JM, CB, Pulser tests    
|
R3 started
Pulser ON. Approx 2 kHZ.
1.8*w waveforms attachments 1+2 |
Tue May 28 12:38:31 2024, TD, JM, CB, Run 2 - Alpha background run    
|
13.35 FEE64 temperatures OK - attachment 1
|
Mon May 27 15:25:08 2024, JM, Startup
|
27/05/24
The carme-gsi computer has been moved from the server room into the shifter control room.
Startup of the DAQ looks OK. Settings loaded 2024Apr24 |
Fri May 10 21:23:35 2024, TD, CB, JM, 20Ne7+ test beam 18x
|
22.00
Carsten Brandau stopping e-target experiment Unattended beam overnight. No operators watching.
10^5 (nominal) 20Ne7+ at 380keV/u beam available |
Sun Apr 28 23:12:11 2024, TD, Monday 28 April 21x
|
00.09 DAQ continues data file R3_21
DSSSD bias & leakage current OK - attachment 1
|
Sat Apr 27 23:16:02 2024, TD, Sunday 28 April 37x
|
00.12 DAQ continues data file R3_15
|
Fri Apr 26 23:41:16 2024, TD, Saturday 27 April 37x
|
00.34 DAQ continues data file R3_9
|
Fri Apr 26 07:05:01 2024, TD, Friday 26 April 19x
|
08.02 DAQ continues data file R1_14
|
Thu Apr 25 02:31:25 2024, TD, Thursday 25 April 39x
|
03.27 DAQ continues - file APR24/R1_7
|
Wed Apr 24 13:18:09 2024, TD, Examples of poor CARME cable management/routing 
|
Have observed some instances of poor CARME cable management/routing
Attachment 1 - SAES D-2000 ion pump HV cable (netal braid) transiting FEE64 cabling
|
Wed Apr 24 12:48:35 2024, TD, Wednesday 24 April 21x
|
Replace AIDA ASIC mezzanine of aida01
|
Tue Apr 23 17:44:41 2024, TD, Tuesday 23 April 12x
|
18.43 ASIC settings 2024Feb08-15.59.09
|
Fri Apr 19 02:47:59 2024, TD, Friday 19 April 12x
|
03.45
|
Thu Apr 18 13:34:06 2024, TD, JG, Thursday 18 April 13x
|
14.30
|
Wed Mar 6 10:47:11 2024, JG, TD, Wednesday 6 March - PEXARIA5 WR test   
|
Courtesy Nik Kurz, JG has installed a PEXARIA5 PCIe card adjacent to CARME - BuTIS single-mode fibre input
and HDMI output to root MACB input for distribution to the other MACBs and FEE64s.
|
Wed Feb 21 07:38:32 2024, TD, Wedneday 21 February 24x
|
10.54 23.2.24 Bias OFF |
Tue Feb 20 14:12:32 2024, JM, Shutdown
|
CARME DAQ shutdown. FEEs turned OFF and all MIDAS server windows closed.
Detector bias turned OFF.
Final leakage current plot - attachment 1 |
Tue Feb 20 13:20:44 2024, OF, AG, JG, ML, R48 status check   
|
Doing afternoon check. Checked the leakage currents, all ok. Attachment 1
Temperatures ok, attchment 2
System wide check, all correct. |
Tue Feb 20 09:57:57 2024, OF, AG, ML, Run 48 status check    
|
Doing morning check. Checked the leakage currents, all ok. Attachment 1
Temperatures ok, attchment 2
System wide check, all correct. |
Tue Feb 20 09:51:37 2024, JM, Run 48 beam on target
|
Run 48 started |
Tue Feb 20 08:41:08 2024, OF, AG, still no beam CRYRING
|
We have mosty empty injections into CRYRING. Only sporadically the beam with good intensity is injected.
Michael Lestinsky is currently working on the problem. |
Tue Feb 20 07:50:10 2024, JM, DAQ restart
|
DAQ restarted. Run46. All appears OK, aida01 shows high rates across ASIC 4 even with no beam which could not be resolved via ASIC control. May suggest
some damge.
Merger is running and tape server is writing data to disk. Data rate is about 1300 kB/sec from 800 kb/sec due to increase in aida01 rate. |
Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
|
22:54
We have moved the gas jet target out (y=4000), the density has dropped to zero.
Started a new run (Run45) for background measurement.
|
Mon Feb 19 08:45:22 2024, JM, JG, SHB, EM, EH, Run 44 - cooled beam on target 35x
|
09:43
Run 44 started cooled beam on target
Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm). Stationary. Same as previous runs |
Mon Feb 19 06:01:17 2024, SHB, JM, JG, Run 42 morning shift 6x
|
07:00
Observed reduction in YR09 presure over last few hours in ML online plot. Beam intensity looks OK but target density was fluctuating quite a
lot. Current value was 1.5e11. |
Mon Feb 19 05:10:48 2024, TD, Run 42 night shift contd. 6x
|
06.03 DAQ continues file G22-86/R42_32
DSSSD bias & leakage current - attachments 1-2
|
Sun Feb 18 22:03:56 2024, TD, Run 42 night shift 47x
|
23.03 DAQ continues file G22-86/R42_21
|
Sun Feb 18 13:58:33 2024, AR, OF, JM, Run 42 - cooled beam on target 27x
|
Run 42 - 15:00
Detectors IN (left arm pot =36.54 mm, right arm pot = 70.49 mm). Stationary. Same as run 40
Electron cooler voltage 751.89 V this corresponds to 1.3444 MeV/u. This should be on the right of the peak of the resonance. |
Sun Feb 18 13:10:18 2024, TD, Sunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra    
|
DSSSD 0 aida01 1*L spectra, aida04 **L spectra
|
Sun Feb 18 07:53:51 2024, HW AG, Run 40 Morning Shift 27x
|
08:57 Doing morning check. Checked the leakage currents, all ok. Attachment 1
Tempritures of, attchment 2
System wide check, all correct. |
Sun Feb 18 00:16:55 2024, JM CB, Run 40 - night shift 15x
|
01:17
Run 40 continues.
Beam intensity looks OK. Oscillates between just below 2.5e7 and just below 3e7. (attachment 1) |
Sat Feb 17 14:29:03 2024, JM, CB, AR, AB, Run 40 - cooled beam on target 31x
|
15:27
Run 40 started cooled beam on target
Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm). Stationary. Same as run 35 |
Sat Feb 17 13:21:44 2024, JM, CB, Beam on target - motors tests  
|
14:01
Run 36 started.
We put both detectors to the fully out position. Detectors then driven IN using the pnuematic motor only once the beam is ready and driven fully |
Sat Feb 17 06:19:27 2024, JM, CB, Run 35 - contd    
|
07:10
FEE temperatures OK
System checks OK |
Fri Feb 16 22:03:27 2024, TD, Run 35 - night shift 49x
|
22.51 DAQ continues file G22-86/R35_36
|
Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
|
11:01
Run 35 started cooled beam on target
Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm) |
Thu Feb 15 21:07:00 2024, JM, AB, AR, OF, Run33 - cooled beam on target 22x
|
22:27
Run 33 started cooled beam on target.
Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm) |
Thu Feb 15 13:18:30 2024, JG, MBS DAQ: target & ring values
|
We are running an MBS DAQ to record the attached list of slow control values of the ring and the target. In most cases this is achieved by converting
analog monitor voltages to frequencies and recording them with a VME scaler (VULOM4B with scaler-firmware). The complete list of signals is attached including
a channel mapping. |
Thu Feb 15 12:40:52 2024, JM. CB, AR, AB, Run30 - uncooled beam on target 29x
|
Run started 13:40
Target density 4.3e11, Beam injection is ~1e7, Pressure in the ring is ~1e-10 mbar.
Detectors have been moved IN with servo motors only (left arm pot = 36.5 mm, right arm pot =37.7 mm |
Thu Feb 15 10:39:50 2024, JM, JG, ML, AG, CB, Run29 - beam optimisation
|
11:27
Run 29 started. Beam energy is 1.3435 MeV/u with a cooler voltage of 751.3 V.
We observe significantly greater count rate for top right detector (DSSD#1) now that the beam energy has been lowered. ADC over range? Beam target |
Wed Feb 14 16:52:46 2024, JM, AR, CB, JG, Run28 - beam on target 42x
|
Beam energy - 1.361 MeV/u
17:12 |
Wed Feb 14 14:59:13 2024, JM, CB, NP, ML, AG, AB, Run 27 -Beam on target optimisation
|
Run 27 Started to check optimsation of the beam - target overlap.
Beam intensity at injection is roughly 1e7 particles
Target density apporx 4.2e11 atoms/cm2 and stable. |
Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough
|
15:06
Run25
Pulser walkthrough
EGG Ortec 448 Pulser
Amplitide 90,000-10,000 @ 10,000 step
Normalise 5.0
Attenuators x5 IN
t_r 100ns
Tau_d
50us
Frequency Int Osc 50Hz
Polarity + ( - polarity via Cooknell SA1 Sum & Invert Amp )
|
Wed Feb 14 08:44:32 2024, CB AR JM, Motors test and turbo ON 11x
|
Run number changed 09:44 - Now run 23
Moving motors with the injection
Ring signal very weird, moving in for short time and staying out for 15+ seconds. |
Tue Feb 13 17:19:43 2024, JM, AR, NP, AB, RSS, Run22 - cooled beam on target (definitely maybe) 48x
|
18:05 We believe we have an overlap between the beam and the target. Run 22 started.
CARME detectors in with the servo ONLY. Left arm pot 36.5 mm, right arm pot 37.7 mm
Target density apporx 2e11 atoms/cm2. |
Tue Feb 13 08:34:44 2024, Hw, JM, AR, CB, NP, AB, RSS, Status of DAQ - beam overlap 10x
|
Check the status of the DAQ system, with Tom. All correct. See attachments:
1 Leackage currents
2 ADC data item stats |
Mon Feb 12 01:40:48 2024, TD, JM, CB, AR, RSS, Run17 - Run20 49x
|
02.35 DAQ continues file G22-88/R17_30
|
Sun Feb 11 13:28:46 2024, JM, CB, TD, Run16 - beam on target 30x
|
13:37 Run started - no beam in the ring (One of the ring magnets was still on RED when it should have been set to green by HKR)
14:28 Beam ON - still observe beam halo on DSSD0 (Top left)
YR09 Vertical and horizontal offsets set to -9.0 mm |
Sun Feb 11 07:03:34 2024, TD, Sunday 11 February 20x
|
02.02 DAQ continues G22-86/R15_21
alpha background
|
Sat Feb 10 17:05:13 2024, TD, Run 15 - background 20x
|
17.55 DAQ continues G22-86/R15_11
alpha background
|
Sat Feb 10 10:00:44 2024, AR RSS JM CB, Run 13, 14 23x
|
System checks: all ok
Attatchment 1: Rates ok
Attatchment 2: Temperatures ok |
Fri Feb 9 17:04:39 2024, JM, AR, CB, NH, Run12 - Background
|
|
Fri Feb 9 11:58:04 2024, TD + CB, JM, AR, NH, AB, Run10 contd, Run11 27x
|
12.46 DAQ continues G22-88/R10_14
|
Fri Feb 9 07:57:38 2024, AR, CB, AB, JM, Run10 - First cool beam on target 27x
|
8:58
System wide checks okay, except
|
Thu Feb 8 17:11:50 2024, CB, EH, Pulser walkthrough 
|
17:30 File G22-88/R8
Pulser walkthrough
EGG Ortec 448 Pulser
Amplitide 90,000-10,000 @ 10,000 step
Normalise 5.0
Attenuators x5 IN
t_r
100ns
Tau_d 50us
Frequency Int Osc 50Hz
Polarity + ( - polarity via Cooknell SA1 Sum & Invert Amp )
18:10 Moved to new run R9
Pulser off. Overnight background. |
Thu Feb 8 14:59:59 2024, JM, TD, Change p+n FEE64 settings
|
ASIC settings for the pn FEEs has been reset to the default aida settings. This was done to combat the observed dropping of several channels in pn only
FEE modules
following motors movement. This effect was also observed in 2022 in several pulser walkthroughs conducted pre and post detector movement. No dropped channels |
Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024
|
EMERGENCY SHUTDOWNS
1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)
2. Internal target: |
Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift  
|
14:50
Temperature, Statistics fine (see screenshots). |
Wed Feb 7 10:09:14 2024, CB, JG, EM, Morning Shift   
|
11:00
Changed slow comp threshold to 0x32 (500 keV). Checkloaded.
|
Tue Feb 6 09:39:54 2024, CB, Detector bias tests 13x
|
10:30 Found ADC#4 on aida 1 and 4 are suddenly noisy. See attach 1-2. Checkloaded multiple times - no effect.
Leakage current overnight was stable, but a clear transient can be observed yesterday around the times of the DSSD motion test. We did not observe
this in the cave looking at the CAEN module - it might have been too fast. |
Mon Feb 5 20:15:31 2024, CB, TD, Detector move in/out signals
|
17.43 setup signals from detector movement controller.
See attachment 1
|
Mon Feb 5 19:43:52 2024, CB, TD, ML, BuTIS reference for VETAR2  
|
16.40 CB/ML install fibre optic cable from patch panel beneath dipole downstream of YR09/CARME chamber to VETAR2 front panel fibre connector - see attachments
1 & 2.
|
Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 
|
13.41 DAQ start - file G22-88/R4
|
Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
|
06.40 DAQ continues file G22-88/R3_42
DSSSD bias OK - attachment 1
|
Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
|
09.30 DAQ continues file G22-88/R3_17
DSSSD bias OK - attachment 1
|
Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk
|
1. Check Proxy server is correct
localhost : 8080
incoming connections 7070 |
Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x
|
01.07 DAQ continues file G22-88/R1_46
background alpha
|
Fri Feb 2 09:58:58 2024, TD, TapeServer not writng data to disk - plus fix 7x
|
DAQ and NewMerger appear to be cofigured correctly.
Can allocate device, create volume and open file with TapeServer but cannot write data.
|
Fri Feb 2 08:59:36 2024, JM, TD, CB, Run1 start - pulser widths spreadsheet 20x
|
Current pulser widths excel spreadsheet attached
09.58 DSSSD bias OK - attachment 1
|
Thu Feb 1 14:45:09 2024, JM, CB, NewMerger setup
|
To include alll 16 FEE modules in the NewMerger we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi from MERGE.LinksAvailable string 5 to
MERGE.LinksAvailable string 15
We also edited the file /MIDAS/Linux/startup/NewMerger from ./master64 -i 8 -l 16 -p 11001 & to ./master64 -i 16 -l 16 -p 11001 |
Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
|
Arrived at the control room to find we had lost connection to the power relay. We rebooted the nnrpi1 and re-connected according to the steps laid out
in elog 471 -> all okay
11:00 Restarted daq with no changes to the system from yesterday. Bias consistent with previous days. All pulser peaks are slightly improved |
Wed Jan 31 09:49:38 2024, JM, TD, Optimising - Wednesday 31 25x
|
Removed ground from DSSD #1 to the chamber and set MACBs so that timestamp is from the NIM WR emulator not the VME VETAR2.
Root MACB mode 0x3 -> 0xd - all other MACB modes 0x3 ( unchanged ).
No timestamps observed from the emulator. Re-set to take timestamps from the VETAR" unit -> all timestamps observed. |
Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware   
|
This is how to update the MACB firmware using the opensource tool xc3sprog
|
Tue Jan 30 09:14:50 2024, JM, TD, Tuesday 30 January 32x
|
09.00 CARME IE514 5.1e-11mbar
|
Mon Jan 29 15:32:08 2024, TD, JM, Monday 29 January contd. 16x
|
Test + and test - daisy chain cabling extended from DSSSD #1 to #2 to DSSSD #1 to DSSSD #4
terminated by 50 Ohm at end of daisy chain
|
Mon Jan 29 08:52:07 2024, TD JM, Monday 29 January 32x
|
09.50 CARME IE514 5.1e-11 mbar ( ambient temperature 16 deg C )
|
Sat Jan 27 20:38:15 2024, PJCS, [INFO] Steps to diagnose White Rabbit problems
|
This is a suggested sequence of actions to help with the current problem with the White Rabbit timestamp distribution. Test the system between each intervention.
If a test provides an answer to the problem then proceed accordingly rather than continue with the suggestions.
Please sketch the current MACB wiring.
Unplug and replug the connectors of the VETAR HDMI connecting cable. If possible clean |
Mon Jan 22 16:29:31 2024, TD, Saturday 20 January 30x
|
11.00 No WLAN/WiFi
came-gsi private LAN appears to be OK
|
Fri Jan 19 11:17:50 2024, JG, TD, Friday 19 January 18x
|
12.20 CARME IE514 4.1e-11mbar, ambient temperature 16.7 deg C
|
Thu Jan 18 17:21:00 2024, TD, Thursday 18 January
|
Network ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC settings/rfs filesystems configured
|
Wed Jan 17 19:21:20 2024, TD, AIDA spares
|
Spare AIDA hardware
|
Wed Jan 17 19:15:47 2024, TD, Wednesday 17 January
|
CAEN N1419ET remote control via carme-gsi and nnrpi1 - see https://elog.ph.ed.ac.uk/CARME/472
|
Wed Jan 17 10:31:05 2024, TD, Remote control of CAEN N1419ET from nnrpi1
|
Login to nnrpi1 from carme-gsi using ssh
|
Tue Jan 16 16:01:48 2024, TD, Change CARMEraspberrypi to nnrpi1
|
Change RPi from CARMEraspberrypi to nnrpi1 to provide carme-gsi access to Rly16 to control USB-controlled ac mains relay.
nnrpi1 is already defined in carme-gsi:/etc/dhcp/dhcpd.conf
|
Tue Jan 16 14:36:30 2024, TD, CARME configuration    
|
FEE64
|
Tue Jan 16 08:57:44 2024, JG, DR, TD, Tuesday 16 January 8x
|
10.00 Outflow manifold returned from workshop with leaking attachment point welding re-worked.
11.30 Outflow hoses re-attached to outflow manifold. Faulty male Swagelok replaced.
|
Mon Jan 15 18:51:28 2024, JG, DR, TD, Monday 15 January
|
Cooling water manifolds
|
Sun Jan 14 12:31:32 2024, JM, CB, FEE positions mac addresses
|
*Updated following FEE changes. Correct as of 31/01/24
FEE modules are labelled according to the diagram in attachment. Note attachment is looking downstream. Each FEE module is also labelled with
its assigned number and whether it is a bias connection on the FEE holders. MAC addresses and FEE descriptions are as follows; |
Sat Jan 13 14:32:21 2024, CB, JM, Leaky manifold and cable management  
|
Found two leaks in the welding of the manifolds, marked them in tape. Manifold to be repaired on Monday. Remember to re-install missing hoses, which
are in a bucket in the cave.
See attached how it is supposed to look like. |
Sat Jan 13 14:25:05 2024, CB, JM, Bias tests with all FEEs connected 
|
Connected all FEEs.
The two top fees corresponding to the bottom right detector are connected to damaged flexi rigid PCBs. The top one is missing an pin that should
not be connected to anything, while the bottom one has a slightly cracked connector and is missing the top left pin. Spares should be in Edinburgh. |
Thu Jan 11 19:57:20 2024, CB, JM, All FEE holders mounted
|
After discussions with Davide, changed the holes in the FEE holders for the bottom-right detector to slots in order to slightly change the angle that
the FEE inserts into the flexi rigid PCB. This was sufficient, with some difficulties, to insert both FEEs into the flexi rigid.
Attempted to finally mount the last two fees, the top two for the bottom-right detector, which should have been very easy. Somehow managed to |
Wed Jan 10 19:27:08 2024, CB, JM, Manifold and more bias tests
|
Mounted water manifold on CARME with help from GSI plumber. Connected all the hoses with Swagelok self-locking connectors. Tested for water leaks - it
leaks from nearly every port. The issue appear to be the connections between the manifold and the plugs, as opposed to the plugs and the hoses which do
not leak. |
Wed Jan 10 10:22:41 2024, CB, JM, Some FEEs mounted - issues with Det#2 (bottom left) 
|
Started mounting some FEEs. We ran into some mechanical issues due to the new ERNI connectors on the new flexi-rigid adaptor PCBs. Davide skimmed 6.5
mm off the edge with the groove (the groove is gone). This is suffiicent to support the flexi-rigid and in spite of our earlier concerns, the flexi-rigid
can be mated/un-mated with the FEEs without major alignment issues. |
Mon Jan 8 19:29:57 2024, CB, JM, Manifold repaired + fee assembly in bench   
|
Davide extracted the stuck blind plugs and re-threaded all missing ports. Completed manifold assembly, except for main inlet/outlet - left for plumber.
Cut 8x2 2m hoses and assembled with Swagelok quikfit and teflon ferrules.
We're missing back ferrules in brass for the repaired fees. It should be possible to buy them from GSI. |
Mon Jan 8 19:27:36 2024, CB, JM, Leak current tests overnight
|
Left bias in overnight. Leakage current decreased and stabilised. See attached. Bias off as we prepare to mount the fees. |
Sun Jan 7 15:38:57 2024, CB, JM, Manifolds mostly assembled + bias overnight check
|
Assembled most of the connectors on the new (green) manifolds. Two blanking pulgs stuck when mounting - cannot remove them or tighten them. Swarf? Will
ask Davide's help tomorrow. Cannot use the manifold until this is fixed.
Checked FEE assembly in cassette. Need to shorten black Delrin supports by ~6 mm. Holes should end up in the correct position thanks to rails |
Fri Jan 5 12:29:10 2024, JM, CB, Further bias tests
|
Biased detectors this morning to 150V, the leakage current for all detectors appears stable and is ~3.5 uA. We have also replaced the CAEN bias module
so that all channels are now functional. Detectors are connected as follows;
CHN0 -> Top left |
Thu Jan 4 13:15:10 2024, CB, JM, Tent removed - bias test
|
Removed tent, octagon, Neg cables.
Disconnected and removed Baking Pi, TC08, thermocouples.
Tested new rails, plates, fees - it fits. Need to check on the flange next. |
Wed Oct 18 16:47:36 2023, JG, CB, Power outage
|
Local power outage at the CRYRING today, while JG was trying to activate the ion pumps. Unlcear what caused it.
Valve on scroll worked as intended, but CARME reacehd 1E-7 mbar from turbo (?) venting.
Power restored. Pressure back in the 1E-11 mbar range, decreasing. |
Tue Oct 17 08:43:47 2023, CB, NEG activation -2    
|
09:40 - Found temperature and pressure stablised, but too high to comfortably activate NEGs closest to detectors. Detector temperature around 90C. This
was expected. Ramped down UHV1400 #1,2,3,4 to P=50W (200C?). Ramped down heaters to 100, 80, 100C. Ramped down heating jacket to 60C.
10:00 - Activated set #5 (x2) at 80W tramp=30, thold=infinity; set#6 (x3) at 120W rest as #5. This is different from previous procedure because |
Mon Oct 16 08:28:02 2023, CB, NEG activation -1
|
9:00 - Michael's online vacuum pressure plot is no longer working - an old image is being displayed. CARME temperatures around 80-85C. Lowered heater
temperatures to 150, 100, 150 C for safety. Lowered jacket temperature to 80C
9:15 - Flashed ion pumps several times. Small pressure increase, up to ~7E-9 but not macroscopic |
Sun Oct 15 09:35:03 2023, CB, Starting ramp down 
|
10:40 - Status as attached. Heaters setpoint/read at 250 C, 150 C, 225 C. Power stable at 53%, 41%, 63%
10:45 - Informed HKR ramp down / pump activation is starting for CARME only. Setpoints to 200, 125, 200 C. Monitoring slow ramp down.
14:10 - Heater temperatures reached the set points. Power stabilising. CARME internals temperature dropped to around 100 C and still falling. |
Tue Oct 3 08:48:36 2023, TD, Tuesday 3 October  
|
09.40 CARME IE514 1.79e-8 mbar, ambient temperature 20.7 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
|
Mon Oct 2 08:41:43 2023, TD, Monday 2 October 6x
|
09.35 CARME IE514 1.95e-8 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
|
Sun Oct 1 10:24:50 2023, TD, Sunday 1 October 12x
|
11.20 CARME IE514 3.53e-9 mbar, ambient temperature 20.6 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
|
Sat Sep 30 10:58:14 2023, TD, Saturday 30 September 9x
|
10.50 CARME IE514 7.14e-10 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
|
Fri Sep 29 08:54:29 2023, TD, Friday 29 September 11x
|
09.50 CARME IE514 9.0e-11 mbar, ambient temperature 21.3 deg C
|
Thu Sep 28 09:19:50 2023, TD, Thursday 28 September 
|
10.20 CARME IE514 8.6e-11 mbar
|
Wed Sep 27 15:56:41 2023, TD, Wednesday 27 September  
|
16.55 CARME IE514 8.2e-11 mbar
|
Tue Sep 26 10:13:14 2023, TD, ELOTECH PID Temperature Controller R4000 manual ( German and English ) 
|
|
Tue Sep 26 08:08:42 2023, TD, Tuesday 26 September 7x
|
09.07 IE514 pressure 6.4e-11 mbar, ambient temperature +20.3 deg C
Using appc218 ( account carme ) workstation by the CARME 19" rack
|
Mon Sep 25 16:33:32 2023, TD, Removed tape from heaters TC  
|
17.33 IE514 pressure 6.4e-11 mbar, ambient temperature +20.8 deg C
|
Fri Sep 22 12:35:46 2023, JM, Bakeout plots   
|
Attached are plots for the previous bakeout of CARME which may aid in the bakeout to come in the following week.
Plots relate the heater temperatures and heater powers with the chamber temperature (internal floating thermocouple) and pressure inside CARME. |
Wed Sep 13 15:00:39 2023, ML, Vacuum and Heater temperature plots from Grafana    
|
Attached are the plotted curves from vacuum and heater temperature (actual and set values from ISOHEAT controllers) during the bakeout process. Channel
assignment as per post 433. |
Sat Sep 2 10:04:55 2023, CB, Turbo GV closed
|
Found CARME in XHV at 1.1E-11 mbar. Chamber temperature around 30C cooling slowly.
Closed GV to top turbo. Pressure goes up but appears to recover around 2.5E-11 mbar, on line with several previous observations that sectioning
off the turbo results in a higher reading in the IE514. |
Fri Sep 1 08:11:40 2023, CB, NEG activation - 2
|
9:10 Set heaters temperature 300 -> 250 C in preparation for cooling down and to help keep DSSD temperature down. Started activating set 6 (3 X DSSD)
at 120 W as per previous procedure.
9:15 Realised previous choice is a mistake in the current configuration as the DSSD TC is closer to set 5. Set 6 off. Set 5 to 60W. No effects |
Thu Aug 31 08:36:34 2023, CB, NEG activation
|
Found CARME at 50C, a bit cooler than expected, probably due to invasive tent changes yesterday to mount missing wires. Increased heaters temperature
to 300C
|
Wed Aug 30 10:28:36 2023, CB, Preparing for pumps on
|
We need to connect the non-bakeable (max 80C) wire of the ion pump belonging to the vacuum division, and we also need to connect the two newly-repaired
NEG cables to the D2000 modules. That requires partly opening the tent to gain access.
Set heaters temperature from 450 C -> 400 C - CARME floating TC temperature goes from ~98 C to ~88C. |
Wed Aug 30 09:33:13 2023, CB, OG, NEG cables repaired 
|
Repaired Neg wires for D2000 with Oemer's help.
Cable #2 is fine.
In Cable #4, wires 1 and 2 are swapped but it's impossible this happened when the connector came apart. The pins are crimped and secured |
Mon Aug 14 09:22:56 2023, JM, Bakeout    
|
14/08/23
Temperature in the baking volume is ~ 42 C and the pressure is 4.6e-8 mbar. Current heaters set point is 135 C. This will now be increased to
200 C to start increasing the baking temperature more significantly. |
Sat Aug 12 15:06:51 2023, JM, Initial bakeout tests    
|
12/08/23
Baking testing. Aim to find relationship between heater temperature setpoint and the temperature of the chamber and floating temperature in the
baking volume. Behaviour of the heater tempertures and ability to control the heating is also required. Ambient chamber temperature ~22 C. Interaction |
Sat Aug 12 11:57:51 2023, JM, Updated thermocouple positions and heater channel layouts 6x
|
Heater channel layouts for the interaction chamber and carme in attached documents.
Updated thermocouple positions; (front section is closest to gas-target, rear section is moving detector end)
1-1 Internal TC 1
1-2 Internal TC 2
1-3 Internal TC 3
1-4 CARME - top of the front section
1-5 |
Thu Aug 10 07:51:43 2023, JM, Baking tent and heater testing 8x
|
09/08/23
Attached is the current pumpdown plot taken from grafana.
I have started to re-work the baking tent in order to close gaps from its initial installation. The heaters work and were tested to a temperature |
Thu Jul 27 09:43:56 2023, RSS, Thermocouples connected -2 
|
10:30 IE514 1.80e-08mbar
Most of the CARME is covered by the baking tent. The tent needs to be closed and a bit covered from the front
(upstream), end (downstream), and bottom side. TCs are labeled with a marker in the sequence 1-1 to 2-8.
1-1 Internal TC 1
1-2 Internal TC 2
1-3 Internal TC 3
1-4 CARME front top
1-5 CARME front bottom
1-6 Top hanging middle
1-7 CARME middle |
Wed Jul 26 08:28:09 2023, RSS, Building tent   
|
09:26 IE514 1.96e-08mbar |
Tue Jul 25 09:12:15 2023, RSS, Building tent 
|
10:10 IE514 2.0e-08mbar
Upstream part of the CARME is covered. |
Mon Jul 24 10:40:14 2023, RSS, TD, Pump down continues 
|
11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar
15.15 7d/24h vacuum plots |
Sun Jul 23 10:13:48 2023, RSS, TD, Building tent   
|
11.15 Pirani 1.0e-03mbar IE514 2.72e-08mbar
16.35 Pirani 1.0e-03mbar IE514 2.61e-08mbar |
Sat Jul 22 09:19:59 2023, RSS, TD, Thermocouples connected 10x
|
10.20 Pirani 1e-03mbar IE514 3.26e-08mbar
|
Fri Jul 21 08:21:54 2023, TD, RSS, Baking tent manual
|
09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar
Today - install TCs, connect to Pico controller and test
|
Thu Jul 20 08:29:26 2023, TD, Installing tent. Two NEG power cable broken. 11x
|
09.28 Pirani 1.00e-3 mbar IE514 5.45e-8 mbar
12.10 Bakeout tent frame installed
|
Wed Jul 19 08:17:26 2023, TD, Leak testing
|
09.16 Pirani 1.00e-3 mbar IE514 8.77e-8 mbar
Leak tester c. 5e-12 mbar.l/s (leak tester valved off)
|
Tue Jul 18 08:16:28 2023, TD, Pumping down. Issues found with one detector.
|
09.15 Following overnight pumping of CARME chamber by Leybold turbo
Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
|
Mon Jul 17 08:45:11 2023, TD, Closing CARME again
|
Grosmantage are scheduled to arrive 10.00 to inspect COF600 seals and their fit to the COF600 flange. They may decide to adjust the seals so that they
fit the flange
|
Fri Jul 14 08:27:17 2023, TD, CARME open - inspecting seal
|
09.20 CARME chamber at atmospheric pressure as expected.
|
Thu Jul 13 08:46:44 2023, TD, Replacing wire seal 
|
09.30 CARME chamber status
|
Thu Jul 13 00:12:45 2023, JM, CB, CARME closed  
|
The CARME chamber was closed and pushed back into position on the ring.
Prior to moving back onto the ring, the detectors were bias tested and the distance between the detectors was also checked using the motors.
Bias test was performed before the detector movement tests and before moving the chamber back onto the ring. |
Thu Jul 13 00:12:19 2023, JM, CB, Bellow replaced
|
The left (inside ring) bellow for the motors rod was replaced.
Replacing the bellow involved;
One person holding the metal plate the detectors are mounted on (cabling remains plugged in) while the operation is performed.
The |
Thu Jul 6 15:26:39 2023, JM, Leak update
|
The leak on the actuator arm bellows has been attempted to be sealed using UHV vacuum seal spray. The spray had the opposite to the desired effect and
the leak rate increased. When spraying with helium the leak rate had increased to 1e-9 mbar l/s. After lunch a second application of the vacuum seal spray
was attempted, however the leak was not sealed. The base leak rate had also increased to the 1e-10 level up from in the morning and yesterday. With the |
Wed Jul 5 19:27:13 2023, JM, Pump down and leak test  
|
CARME and the interaction chamber have been pumping for ~26 hours, P=4.15e-7 mbar, attached figures show the current pump down plot in comparison to
the two previous pumpdowns in the last 2 weeks and the pump down with the bare chamber in 2020. The gradient of the pressure reduction appears to be improving
for each pump down, either due to conditioning of the chamber or the reduction in leaks. |
Tue Jul 4 17:08:08 2023, JM, Leak test and venting 
|
This morning the pressure achieved was 1.44E-7 mbar. Leak testing showed an overall leak rate of 1.5E-10 mbar l/s, this is below the previous leak rate
but still significantly above the leak rate from elog 141 of the CARME chamber on its own. Spraying helium, a leak is visible on the VAT gate valve on
the interaction chamber (inside of the ring). The leak rate increases to ~2.3E-10 mbar l/s. No increase in the leak rate was observed elsewhere on CARME |
Mon Jun 26 14:49:05 2023, JM, TD, CARME vented
|
26/06/23
This morning the pressure was 4e-7 mbar. The bolts on the windows and the large flange on the bottom of the interaction chamber were tightend.
No leak was present on the windows following tightening. However, the leak on the rotatable flange, although decreased in magnitude, was still in the 1e-9 |
Sun Jun 25 14:30:06 2023, JM, TD, Motors bias test
|
The motors were moved using the pneumatic only, in and out for several cycles to gauge the effect on the vacuum. For the left arm no change in pressure
was observed. For the right arm a small increase of 0.04e-7 mbar was observed which was quickly reduced by the turbo.
The detectors were then biased to see if movement had any effect on the leakage current (large effects were observed in 2021 beamtime). Movement |
Sun Jun 25 10:08:30 2023, JM, TD, Pump-down   
|
23/06/23
Pumpdown started with the scroll pump 17:15 . The turbo-pump was started 17:55. Gate valve was closed and the turbo turned of at 19:20 due to
no working fan on the turbo. |
Sun Jun 25 09:41:06 2023, JM, TD, Normal turbo-pump operation 6x
|
Attached are images showing the messages for normal turbo-pump operation |
Sat Jun 24 10:38:42 2023, JM, TD, Section 9 closed, begin pumping 
|
23/06/23
The CARME chamber and interaction chamber were connected and section 9 has been fully closed. New valves have been installed on the interaction
chamber, in addition to new diamond windows. A leak cart has been connected to the backing line of CARME. Before begining the pumpdown, the manual valve |
Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring  
|
The wire seal has been tightend further to 160 Nm. Open neg feed-through flange has also been fully tightend.
The CARME chamber was then slid back onto the aluminium frame on the ring. Two carriages were damaged during the sliding process, which have
now been replaced. Carriages were replaced by lifting one end of the upper frame section using the crane by only ~1mm. This was sufficient to slide out |
Wed Jun 21 18:47:36 2023, JM, TD, Closing CARME   
|
Internal CARME installations complete.
New strain reliefs (flange side) installed on each cable harness.
2x sets of SAES UHV1400 NEG pumps installed and connected
to 2x power feed-through flanges -> continuity checked OK -> 3x UHV1400 modules gives a resistance of 7.4 Ohms, 2x UHV1400 modules gives resistance |
Fri May 26 09:08:06 2023, JM, CB, Detector movement 
|
Hopefully we will not be opening the chamber for quite some time so find attached images of all four installed detectors and a video of them both moving
into the beam axis for future reference |
Fri May 26 08:53:54 2023, JM, CB, Strain reliefs (flange side) installed   
|
Strain reliefs on the flange side of the cable harness have been installed for two detectors (top right and bottom right detectors).
We require the strain relief parts from edinburgh in order to install strain reliefs for the left two detectors.
Find attached images for the strain relief installed and a video of the clamped cables during a movement cycle. |
Wed May 24 09:54:56 2023, JM, CB, Maximum detector positions 9x
|
The detectors were moved into the beam axis using the motors to check the maximum distance they can be moved in without collision with one another.
Movement of both pneumatic motors results in a separation of ~ 4 cm between the detectors.
The servo motors for left and right were each moved in by 1 cm -> results in separation of 2 cm between the detectors |
Wed May 24 08:35:12 2023, JM, CB, Strain reliefs (detector side) installed    
|
The new MACOR strain reliefs on the (detector side) have been installed. See attached photos
The two pieces of MACOR are not fully closed but we are confident that the kapton wires are sufficiently clamped.
In order for the strain reliefs to be installed in the correct poisition, two nuts on the jacking plate of the cable harness had to be removed. |
Mon May 15 07:34:22 2023, TD, Monday 15 May
|
08.35 DSSSD#3 bias -149.95V leakage current -6.418uA temperature +19.6 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
DSSSD#3 bias OFF |
Sun May 14 11:55:12 2023, TD, Sunday 14 May
|
12.44 DSSSD#3 bias -149.95V leakage current -6.448uA temperature +19.7 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
CRYRING cave lights ON - leakage current measurements @ 60s intervals
|
Sat May 13 11:34:25 2023, TD, RSS, Saturday 13 May
|
12.34 DSSSD#3 bias -149.95V leakage current -6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
|
Fri May 12 16:24:20 2023, RSS, TD, V-I test 8x
|
Since yesterday evening, the bottom right detector was at -150 V. In the morning, the current was quite stable ~ 6.77 uA. The bias was switched off,
the foils opened, both of the detector arms were moved in and out three times, and the chamber was tightly covered again. A negative bias voltage was applied
from 0 to 150 V in steps of 10 V one by one to all four detectors, and the V-I results can be seen in Attachments 1-4. All detectors seem to be |
Thu May 11 21:22:54 2023, RSS, TD, V-I test 7x
|
Today, the foil was opened, the pins on the bottom right detector were checked and looked fine, the right-hand arm was moved a bit in and then out, and
the foil was tightly closed again. The negative bias voltage was applied from 0 to 50 V in steps of 10 V. During the measurement, the lights in the cave
were switched off to ensure no leakage current from the light*. The results are shown in Attachment 1. To condition the detector, it was left at a negative |
Wed May 10 19:06:18 2023, RSS, TD, V-I test   
|
To test the detectors, adaptors were installed on the feed through flanges. A negative bias voltage was applied in steps of 10 V from 0 to 150 V. The
V-I plots are attached for the four detectors. Three detectors - top right, top left, and bottom left (in the direction of the beam) - are fine. For the
bottom right detector (in the direction of the beam), the current was fluctuating and was considerably high (1st test). The adaptors connecting to this |
Tue May 2 15:02:09 2023, CB, JM, All detectors and harnesses mounted   
|
Completed mounting harnesses and detectors.
The strain relief support for the bottom most two detectors on the feedthrough side was not mounted because we could not find enough MACOR parts
and mounting flanges. We cannot find them in GSI, possibly they are somewhere not obvious in Edinburgh. |
Mon May 1 18:21:18 2023, CB, JM, All detectors mounted  
|
Mounted four detectors on Carme ad well as four cable harnesses.
Cables for new, shorter harnesses appear still too long. Likely the model is not correct somehow. |
Mon May 1 08:26:09 2023, CB, JM, Left hand detectors remounted
|
(31 April)
Remounted 3335-12 on top and new 3335-1 on bottom of left hand plate. Used new dog legs and old standoffs.
|
Sun Apr 30 10:01:39 2023, CB, JM, Left hand detectors unmounted 26x
|
(29 April)
Inspected CARME after opening. See attached. Some key takeaways.
- No visible damage to the detectors or the Kapton cables. No visible deposits or dust on the detectors either. |
Sat Apr 29 10:12:58 2023, CB, JM, CARME opened 8x
|
(28 April)
Mounted rails on dolly. The rails don't smoothly connect to those on the Aluminium frame and some thin metal shims were required to get the
correct height. A metal support had to be placed above the Delrin pads to support the rails above the gap between frames. |
Thu Apr 27 19:43:23 2023, CB, JM, Preparing to open 
|
Removed turbo pump and set aside in a box. Considering switching to the other turbo to avoid degradation due to lack of use.
Installed bellows support and OG devised support to avoid bellows sagging when Carme is split open. |
Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  
|
Disconnected cables from CARME motors and turbo. The turbo has to go to allow Carme to slide out. Crane may be required to lift because it's in a
very hard spot to access.
|
Tue Apr 25 13:22:19 2023, JM, CARME venting 
|
CARME venting using nitrogen gas bottle.
Coolant pipes dismounted from the chamber
Feed-through flange for n+n bias flange for bottom detector has a bent pin image attached. Clearer image of bent pin for ERNI connector used |
Mon Apr 24 21:24:26 2023, JM, Preparation for CARME dismount  
|
CARME currently in vacuum, pressure ~3E-10 mbar. Chamber to be vented tomorrow afternoon by vacuum division. We have active both pirani and hot cathode
gauge to aid.
Equipment removed from the chamber in preparation for dismount of CARME from the ring this week. Equipment removed includes: |
Wed Mar 22 16:33:32 2023, TD, NIM WR source 8x
|
Test of NIM WR source at Edinburgh
|
Wed Jan 18 13:32:36 2023, PJCS, MACB settings with either Emulator or VETAR   
|
When using the VITAR connected to the HDMI port of the root MACB the settings for all the MACB in the system 0x3.
This setting takes the Clock and Data line from the input HDMI and outputs it via teh HDMI output ports.
When using the Emulator connected via the SMA connectors on the back of the root MACB then the setting for the root MACB |
Thu Dec 8 14:41:19 2022, PJCS, Results of tests on AIDA PSU in DL T9 8x
|
We opened one up and soldered a co-ax cable to one of the +6v power contacts at the output of the filter board.
Connecting this to a 'scope we observed a level of +/- 5mv noise with no FEE connected.
Connecting one FEE made little difference. |
Thu Dec 1 08:56:59 2022, AR TD, Thursday 1 December 11x
|
Photos of noise observed at each of the AIDA PSU outputs by digital oscillscope.
DAQ GOing with waveforms enabled.
Connection from AIDA PSU to scope by DMM test probes, twisted cabling, 3mm jack plug/BNC adaptor. |
Wed Nov 30 08:52:59 2022, AR TD, Wednesday 30 November 26x
|
9:40
DSSD bias and leakage current values:
-99.99 V |
Tue Nov 29 14:37:56 2022, AR TD, Tuesday 29 November 22x
|
16:20
DSSD bias and leakage current values:
-99.99 V |
Mon Nov 28 13:14:33 2022, AR TD, Monday 28 November 12x
|
|
Mon Oct 3 16:03:33 2022, OH, CB, TTT14 Photos
|
Photos of the new TTT14 DSSD delivered to GSI.
Photos of detectors are broken up by photos of SN on box
To big to put on elog. Have uploaded to /Disk/ds-sopa-group/np/GSI/CARME/TTT14_Photos.zip and will change permissions to 777 |
Sun Aug 14 06:50:58 2022, TD, JM, Sunday 14 August 10x
|
07.51 DAQ continues files 22Feb/R97
|
Sat Aug 13 10:23:59 2022, JM, TD, Noise tests pt3 and pulser walk 15x
|
Waveforms and discriminator ON. Pulser re-connected to all fees via daisy chain. V=100v, I=8.36uA
Pulser peak widths (ch FWHM) |
Fri Aug 12 15:12:37 2022, JM, TD, CARME measurements 9x
|
measurement 1 -string
intermediate (smaller) chamber - 2144 (mm) circumference, measured half circumference 1072 mm
outer (larger) chamber - 2160 (mm) circumference, measured 1/4 circumference 540mm |
Fri Aug 12 09:06:57 2022, TD, JM, Noise tests pt2 30x
|
10.07 DSSSD bias -100V leakage current -8.65uA
|
Thu Aug 11 09:25:13 2022, JM, TD, Noise tests 14x
|
Moved pneumatic motor in and out several revolutions
Biased detector up to 100 V, I ~ 12.4 uA ambient temp c. 21 deg C |
Wed Aug 10 10:33:03 2022, TD, ML, JM, NP, Meeting at YR09 to discuss options for CARME operations to February 2022   
|
Initial discussions of proposals to provide open CARME chamber and provide access to near and far detector chambers
|
Wed Aug 10 10:30:04 2022, TD, JM, Wednesday 10 August   
|
09.45 Found CARME electrical power off
|
Tue Aug 9 16:07:33 2022, JM, TD, Anydesk setup command line
|
To log into appc218 desktop:
same login and password as to carme@atppc022.gsi.de
To start anydesk |
Tue Aug 9 13:44:16 2022, TD, JM, Tuesday 9 August    
|
14.00 CARME vacuum c. 1.8e-10 mbar - see attachment 1
|
Thu Mar 3 15:14:21 2022, JM, OH, CARME packing up
|
Pulser walkthrough taken for motor position 23.1mm and motor position 67.43mm.
Points taken at 30,50,70,90,110,130,150,170,190,210,230 for 23.1mm position and 230,210,190,170,150,130,110 for 67.43mm position.
Motors moved to fully OUT position and pin put back in. Current positions before closing program 19.1mm and 19.57mm. |
Wed Mar 2 22:29:48 2022, CB, SD, Last shift with beam 9x
|
22:30 Shift handed over. DAQ OK. Target OK. Beam OK.
00:22 Temperatures OK |
Wed Mar 2 21:16:06 2022, JM, PM, Current status
|
22:16
Temperature setpoint = 113k
Not observed noise burst again |
Wed Mar 2 19:25:25 2022, JM, PM, Current status 10x
|
20:25
Observed short burst of low energy noise on aida1, lasted <30s (attachment 8).
Temperature setpoint = 113 K |
Wed Mar 2 17:21:35 2022, JM, PM, Current status 8x
|
18:21
Temperature setpoint = 113k
Target density OK S1 varies between 2E-8 and 2.5E-8 mbar, E4 between 1E-9 and 5E-9 mbar. (slightly lower than previous check) |
Wed Mar 2 14:15:16 2022, JM, PM, Current status 6x
|
15:15
Temperature setpoint = 113 K
Target density is OK for now. S1 vaies between 2E-8 and 3.5E-8 mbar. E4 between 1E-9 and 1E-8 mbar. |
Wed Mar 2 09:38:50 2022, Spillmann, Uwe, ion source restarted
|
detector position
out: 23.1mm |
Wed Mar 2 06:00:49 2022, Spillmann, Uwe, waiting
|
07:00
Target density is hovering between 2.0e-8 and 2.3e-8 |
Wed Mar 2 03:40:40 2022, David, George, Temperature Cycle
|
04:40
Target density is hovering between 2.0e-8 and 2.3e-8, sometimes dipping below 2.0e-8
We will conduct a temperature walkthrough while there is no beam, |
Wed Mar 2 01:24:48 2022, David, George, Ion Source Update
|
02:25
Zoran was unable to ignite the ion source.
He has given some parameters to the control room so they can wiggle stuff around and try and ignite it. |
Tue Mar 1 23:43:15 2022, David, George, Beam Intensity Drop
|
00:38
Intensity in the ring dropped by 2 orders of magnitude to 5e5 on injection
Lost rutherford rate (as seen in last e-log post) |
Tue Mar 1 23:30:04 2022, David, George, Current status  
|
00:30
Pressure in S1 slightly decreased from before but still high enough to measure data.
One new count at 20MeV |
Tue Mar 1 22:10:26 2022, David, George, Current status   
|
Ring current 6.67e7 particles/s
pressure at S1: 2.3-2.8e-8
Merger, Tape server (WS3): 1574 kB/s, writing ok |
Tue Mar 1 21:34:06 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 20:41:28 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 19:41:24 2022, PM, LV, target temperature walkthrough
|
A target temperature walkthrough has been initiated at 20:41 since the target density at S1 had slightly decreased (with ~0.1-0.2)
Current temprature 116K
set to 126K at 20:41 |
Tue Mar 1 19:40:28 2022, PM, LV, check 12x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 18:43:41 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 17:36:04 2022, PM, LV, check 14x
|
no change:
Check Clock Status': Passed 5, Failed 0
Check ADC Calibration: Passed 5, Failed 0 |
Tue Mar 1 16:57:34 2022, CB, LV, PMH, New run
|
Beam issues due to too long storage time in the last hours. Motors moved out and not moving.
Decreased storage time to 70 s. Seems OK now. Restarted motor movement as before
Started new run R86 |
Tue Mar 1 14:01:01 2022, MS, SHB, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' : no change |
Tue Mar 1 12:58:32 2022, CB, MS, SS, ML, Synced pneumatic motion
|
New run R84
Attempting to sync pneumatic movement with ring. Still see something on t out -> p out
Command to move out was being given relative to the wrong time. |
Tue Mar 1 12:33:21 2022, MS, SHB, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': no change |
Tue Mar 1 10:43:36 2022, MS, SHB, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': same
|
Tue Mar 1 10:35:59 2022, MS, SHB, next run on tape server tab
|
old potentiometer position 19.1 mm
new run number: 83
new potentiometer position : 27.58 mm |
Tue Mar 1 08:02:26 2022, SHB, MS, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes |
Tue Mar 1 06:35:42 2022, SHB, MS, check 11x
|
detector motors are still out
'Check Clock Status', 'Check ADC Calibration' : Clock status test result: Passed 5, Failed 0
'Check the White rabbit decoder status' : |
Tue Mar 1 06:04:04 2022, SHB, MS, positions
|
just FYI: current positions saved in files are x=1000 and y=-750. this information is good in case of crash.
|
Tue Mar 1 05:23:02 2022, JM, EM, Current status
|
06:20
Servo motors moved to fully out position as some work on the beam was neccessary. Beam injection had dropped from ~9e7 to around 1e7. Potentiometer
reads 19.10 mm. |
Tue Mar 1 04:07:31 2022, JM, EM, Temperature cycle
|
Have been unable to achieve decent target density with temperature cycling so far. Will attempt to go up to 300 k and back down to around 115 k which
proved successful in previous shifts. |
Tue Mar 1 03:34:28 2022, JM, EM, Current status 7x
|
Temperature setpoint = 116 k
Detector IN potentiometer = 34.89 mm
Rutherford rate is reduced from previous entries. Avergae peak height appears to be ~50 counts. Fluctuations in peak height and E4 pressure are |
Tue Mar 1 03:19:50 2022, JM, EM, Temperature Cycle
|
04:20
Did another temperature cycle (118 K -> 125 K -> 95 K -> 116 K) trying to improve the pressures at the target and the detector count
rate. |
Tue Mar 1 02:15:29 2022, JM, EM, Current status 6x
|
03:15
The nozzle motor control at the target crashed, but operation has been restored.
Temperature setpoint = 116 K |
Mon Feb 28 23:54:02 2022, JM, EM, Current Status, Temperature cycle  
|
00:51
Temperature setpoint = 116 K
Detector position IN potentionmeter = 34.89mm |
Mon Feb 28 22:34:51 2022, JM, EM, Current status    
|
23:35
Temperature setpoint = 116 K
Detector position IN, potentiometer reads 34.89 mm |
Mon Feb 28 14:47:52 2022, CB, TD, Monday 28 February 15:00-23:00 17x
|
15.51 1.8.W spectra 20ms, 2ms, 200us, 20us FSR - attachments 1-8
|
Mon Feb 28 14:42:48 2022, CB, TD, Cryostat set to 115K
|
Cryostat set to 115K |
Mon Feb 28 14:38:15 2022, TD, NewMerger statistics 37x
|
Screenshots of all NewMerger statistics |
Mon Feb 28 13:56:02 2022, JG, CB, Temperature cycle to 125K
|
14:45
Rutherford rate was decreased significantly for longer period.
Temperature increased to 125 K |
Mon Feb 28 13:16:39 2022, JG, AK, CB, Current status 8x
|
14:16
beam intensity at injection: 7e7 ions
Temperature setpoint = 110 k |
Mon Feb 28 11:57:22 2022, JG, AK, CB, Current status 8x
|
12:55
beam intensity at injection: 9e7 ions
Temperature setpoint = 110 k |
Mon Feb 28 10:55:48 2022, JG, US, Current status 8x
|
11:55
beam intensity at injection: 8e7 ions
Temperature setpoint = 110 k |
Mon Feb 28 09:31:48 2022, JG, AK, CB, Current status 8x
|
10:35
beam intensity at injection: 1e8 ions
Temperature setpoint = 110 k |
Mon Feb 28 08:36:35 2022, JG, AK, CB, Current status 8x
|
09:35
beam intensity at injection: 8.2e7 ions
Temperature setpoint = 110 k |
Mon Feb 28 07:35:51 2022, JG, current logger crashed
|
The current logger did crash in the evening of 25.02. and stopped logging since then, it seems.
I restarted it now (28.02. 8:30).
Seems to run stable for now. |
Mon Feb 28 07:31:25 2022, JG, AK, Current status 8x
|
08:30
Temperature setpoint = 110 k
Rutherford rates shaky, peak max at ~ 3x10^2 |
Mon Feb 28 06:12:58 2022, JG, AK, US, Current status 8x
|
07:20
Temperature setpoint = 110 k
Rutherford rates shaky, peak max at ~ 3x10^2 |
Mon Feb 28 05:04:47 2022, JM, OF, Temperature cycle to 125K
|
06:01
Rutherford rate was decreased compared to previous values. Max rate ~ 50 counts for the peak, average ~20 counts.
Temperature increased to 125 K |
Mon Feb 28 04:14:26 2022, JM, OF, Current status 9x
|
05:20
Temperature setpoint = 110 k
Rates are stable however are slightly lower than previous. Min peak height ~40 counts, max ~ 10^2. |
Mon Feb 28 03:16:37 2022, JM, OF, Current status 6x
|
04:24
Temperature setpoint 110 K
Rates appeared stable throughout the hour ~10^2 peak height. Last 5 minutes rutherford peak height appears reduced, cycling from 10^1 to 10^2. |
Mon Feb 28 02:16:00 2022, JM, OF, Current status 6x
|
03:21
Temperature setpoint 110 K
Rutherford rate stable. Min peak height ~ 10^2 counts, max ~ 3*10^2 counts. |
Mon Feb 28 01:16:02 2022, JM, OF, Temperature decrease 115K to 110K  
|
02:15
Density remains stable at 155 K
Temperature setpoint decreased by 1K. Aim to get to 110 K to see if higher stable density can be achieved. |
Mon Feb 28 00:24:05 2022, JM, OF, Current status 7x
|
01:23
Temperature setpoint = 115 k
Rutherford rates still appears stable. Max peak ~10^2 counts, min peak ~50 counts per 20 seconds. Greater fluctuations in YR07 plot however do |
Sun Feb 27 23:17:33 2022, JM, OF, Current status 10x
|
00:20
Temperature setpoint 115 K
Rutherford rate appears fairly stable. Fluctuations from a max peak of 10^2 to a minimum of ~40 peak hieght. Fluctuates remain lower than at |
Sun Feb 27 22:03:51 2022, JM, OF, Current Status 9x
|
23:00
Target Temperature setpoint 95 K
Current in the ring ~ 5e7 pps |
Sun Feb 27 20:38:06 2022, Rui-Jiu Chen, Yuri, Current status 13x
|
Ring current ~5.0e7 particles/s
SW3
- Merger OK |
Sun Feb 27 20:19:06 2022, Rui-Jiu Chen, Yuri, open the valves of target.
|
|
Sun Feb 27 19:01:02 2022, Rui-Jiu Chen, Yuri, Current status 13x
|
Ring current ~5.96e7 particles/s
SW3
- Merger OK |
Sun Feb 27 18:46:42 2022, Rui-Jiu Chen, Yuri, Change target temperature
|
time Temperature
E1 current(A) E1 frequency(Hz)
19:06 170 |
Sun Feb 27 17:00:45 2022, Rui-Jiu Chen, Yuri, current status 13x
|
Ring current ~7.76e7 particles/s
SW3
- Merger OK |
Sun Feb 27 16:30:35 2022, Rui-Jiu Chen, Yuri, Change target temperature again
|
1. change T from 95 k to 140 k.
2. keep T at 140k for 15 minutes.
3. change T from 140 k to 95 k. |
Sun Feb 27 15:41:33 2022, Rui-Jiu Chen, Yuri, current status 13x
|
16:38 change target temperature from 95 k to 140 k.
16:48 change target temperature from 140k to 95k.
|
Sun Feb 27 15:02:16 2022, Rui-Jiu Chen, Yuri, Change target temperature 14x
|
16:00 change temperature from 95 k to 120k.
16:07 change temperature from 120 k to 95k.
|
Sun Feb 27 14:05:30 2022, Rui-Jiu, Ragan, Current status 14x
|
Ring current ~7.61e7 particles/s
SW3
- Merger OK |
Sun Feb 27 13:34:24 2022, RSS TD, Current status
|
14:33: 95K-->140K
14:44: 140K --> 95K
Ring current ~6e7 particles/s |
Sun Feb 27 12:49:44 2022, TD RSS, Sunday 27 February 07:00-15:00 6x
|
13.50 Cryostat set point 120K
|
Sun Feb 27 12:00:13 2022, RSS TD, Current status  
|
Ring current ~7.7e7 particles/s
Merger, Tape server (WS3): 1414 kB/s writing ok
Leakage current (WS4): 3.43 uA |
Sun Feb 27 11:00:08 2022, RSS TD, Current status  
|
12:00: 95K-->120K
12:07: 120K --> 95K
Ring current ~6e7 particles/s |
Sun Feb 27 10:00:07 2022, RSS TD, Current status  
|
Ring current ~9e7 particles/s
Merger, Tape server (WS3): 1414 kB/s writing ok
Leakage current (WS4): 3.43 uA |
Sun Feb 27 09:00:09 2022, RSS TD, Current status 7x
|
10:00: 95K-->120K
10:08: 120K --> 95K
Ring current ~7e7 particles/s |
Sun Feb 27 08:00:23 2022, RSS TD, Current status  
|
Ring current ~7.5e7 particles/s
Merger, Tape server (WS3): 1414 kB/s writing ok
Leakage current (WS4): 3.44 uA |
Sun Feb 27 06:58:51 2022, RSS TD, Current status   
|
7:59: 95K-->120K
8:06: 120K --> 95K
Ring current ~7e7 particles/s |
Sun Feb 27 06:23:42 2022, RSS TD, Current status 6x
|
Ring current ~6e7 particles/s
Merger, Tape server (WS3): 1414 kB/s writing ok
Leakage current (WS4): 3.44 uA |
Sun Feb 27 05:45:53 2022, David, Pierre-Michell, Current status   
|
6:05: 95K-->120K
6:12: 120K --> 95K
Ring current 8e7 particles/s |
Sun Feb 27 04:54:46 2022, David, Pierre-Michell, Current status  
|
Ring current 8e7 particles/s
Merger, Tape server (WS3): 1664 kB/s writing ok
Leakage current (WS4): 3.26 uA |
Sun Feb 27 03:49:36 2022, David, Pierre-Michell, Current status  
|
04:06 85K -->120K : 04:13 120K -->95K
current ring 8e7 p/s
Merger, Tape server (WS3): 1600 kB/s, writing/refreshing ok |
Sun Feb 27 02:38:52 2022, David, Pierre-Michell, Current status   
|
We have decreased the temperatur> 95K --> 90K. At 95K the target was stable, but let's try to increase the density a bit.
Edit 03:54 : 90K --> 85K
Merger, Tape server (WS3): 1300 kB/s writing ok |
Sun Feb 27 01:46:56 2022, David, Pierre-Michell, Current status  
|
So far looks like with a temperature of 95K the target is maintained with a reasonable density throughout long periods of time.
Ring current 6.41e7 particles/s
Merger, Tape server (WS3): 1472 kB/s writing fine |
Sun Feb 27 00:53:24 2022, David, Pierre-Michell, Current status 7x
|
We have recovered the beam at 01:49, after such a long time we had no target so we increased from 80K to 120K at 01:52. 02:01 update 120K-->95K as
we have observed around that temperature always fluctuations and is safer.
Ring current 7.74e7 particles/s |
Sun Feb 27 00:07:15 2022, David, Pierre-Michell, No beam, valve closed
|
At 00:37 we lost the beam due to a high pressure burst in the tarjet which resulted in a valve closed at YR09VV...
On-call service technicians are coming to solve the problem.
|
Sat Feb 26 23:20:13 2022, David, Pierre-Michell, Update status 7x
|
In this last hour we have been playing with the cryostat temperature as dictated by Nikos, in order to have the target working properly. For this, we
have increased from 80K to 140K the cryostat temperature then we saw again target until we didn't. Then we went down again to 80K. After a few minutes,
with a really nice target again was gone, so we increased the temperature to 120K at 00:19. At 00:27 decrease from 120K to 80K. |
Sat Feb 26 22:22:27 2022, David, Pierre-Michell, Starting to take data 11x
|
At 23:22 we started recording data under the new conditions.
Merger, Tape server (WS3): 1408 kB/s writing ok
Leakage current (WS4): 3.27 uA |
Sat Feb 26 04:36:38 2022, RSS TD, Saturday 26 February 07:00-15:00 27x
|
05:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar as reported earlier
See attachments 1 & 2
E4 pressure not < 5e-10mbar - wait to startup gas jet target
|
Fri Feb 25 19:20:22 2022, MS, PJW, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' no changes
|
Fri Feb 25 17:48:22 2022, MS, PJW, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes
|
Fri Feb 25 16:01:04 2022, MS, PJW, check 7x
|
'Check Clock Status': Clock status test result: Passed 5, Failed 0
'Check ADC Calibration' : Calibration test result: Passed 5, Failed 0 |
Fri Feb 25 15:38:40 2022, JM, CB, PJW, Run 55, 56, 59 root histograms 6x
|
Run55 - detector out, start 22/2/22 13:20, end 23/2/22 10:49
Run 56 - detector moved in, start 23/2/22 10:4, end 23/2/22 15:46
Run 59 - detector position optimised, detector position in, start 23/2/22 17:57, end 24/2/22 00:04 |
Fri Feb 25 11:20:30 2022, CB, Pressure and temperature data saved
|
Saved pressure reading and temperature data logs from internal target in /TapeServer/22Feb/OtherData
Leakage current data is saved in /home/npg/Programs/caenlogger
|
Fri Feb 25 09:58:08 2022, GHC, CB, ML, EM, Current status
|
10:58
Started new run: 77
|
Fri Feb 25 08:14:47 2022, George, Esther, Current status
|
9:14
Beam intensity around ~7.5e7
Pressures OK |
Fri Feb 25 06:57:09 2022, George, Esther, Current status
|
08:00
Beam seems to be back
Intensity ~7.8e7 |
Fri Feb 25 06:28:12 2022, George, Esther, Current Status 
|
07:30
Some signals on the beam monitor, seems they are optimising it.
System Check OK |
Fri Feb 25 05:04:16 2022, Rui-Jiu Chen, Alex, check 14x
|
Still no beam in CRING.
Motor fully out position.
SW3 |
Fri Feb 25 03:20:29 2022, Rui-Jiu Chen, Alex, Current status
|
Gleb Vorobyev tried for few hours to fix the ion source but without success.
So, there will be no beam in CRYRING during this night shift. Today at about 08:00 the efforts to fix the ion source will be restarted. |
Fri Feb 25 03:01:11 2022, Rui-Jiu Chen, Alex, check 14x
|
Still no beam in CRING.
Motor fully out position.
SW3 |
Fri Feb 25 01:12:49 2022, Rui-Jiu Chen, Alex , Check 13x
|
Still no beam in CRING.
Motor fully out position.
SW3 |
Fri Feb 25 00:00:40 2022, Rui-Jiu Chen, Alex, Check 14x
|
There are some problems with ion source. No beam in CRYING.
Motor fully out position.
SW3 |
Thu Feb 24 23:15:25 2022, Rui-Jiu Chen, Alex, Problems with ion souce.
|
|
Thu Feb 24 22:45:08 2022, Jordan, George, Rui-Jiu Chen, check 14x
|
- Motor fully out position.
SW3
- Merger OK |
Thu Feb 24 14:31:25 2022, JM, ML, CN, Beam Tuning Run 76 6x
|
15:30
1.5 MeV/u beam currently being tuned
Target is ON, setpoint = 135 K |
Thu Feb 24 09:43:16 2022, JG, MS, check 13x
|
Beam is still beeing tuned. Target is off.
- Motor on manual |
Thu Feb 24 08:30:36 2022, JG, MS, AIDA5 calibration test failed - solved 
|
UPDATE: THE PROBLEM IS SOLVED FOR NOW:
Doing the calib for the 5th time eventually worked.
------------ |
Thu Feb 24 08:15:23 2022, JG, MS, check 13x
|
Beam is still beeing tuned. Target is off.
There is a problem with ADC calibration of aida5: see entry https://elog.ph.ed.ac.uk/CARME/268
|
Thu Feb 24 07:25:53 2022, OH (Remote), Recover of system after crash
|
08:00 Woke up to message from Carlo explaining the server had crashed.
Anydesked into the machine.
Merger was showing just data transfer it was not showing Transfer => Merger
|
Thu Feb 24 05:09:47 2022, CB, PE, EM, Inlet valve at target closed + problems with turbopump
|
The turbo pump E1 is continuing to draw too much current and the rotation frequency has steadily decreased from 817 Hz at the beginning of the night
shift to 800 Hz now. The frequency recovered after the temperature was increased.
Both of the valves (inlet and dump) have been closed to improve the vacuum in the ring. |
Thu Feb 24 04:17:35 2022, CB, TD (remotely), MIDAS DAQ no longer working 
|
DAQ server crashed around 24:00
Rebooted server but could not could not rescue remotely - could not contact raspberry pi in control of FEE bias.
Entered cave, rebooted raspberry pi. Would not accept remote connections. |
Wed Feb 23 22:29:50 2022, PE, EM, CB (remotely), check - 23:30
|
Motor position ok
Data rate: 1030kbytes/s
T ok |
Wed Feb 23 21:27:29 2022, TD, CN, check 11x
|
Motor position ok
Data rate: 1030kbytes/s
T ok |
Wed Feb 23 20:52:56 2022, CN, TD, System wide checks 11x
|
Attachments 1-5 aida01-aida05 options
|
Wed Feb 23 20:06:43 2022, TD CN, E141 kinematics
|
Assuming DSSSD is 1000um thick we can expect to observe protons for E_lab=11MeV as follows
|
Wed Feb 23 19:22:55 2022, CN, TD, check 10x
|
- Motor checked , OK
SW3 |
Wed Feb 23 18:58:12 2022, TD CN, Wednesday 23 February 15.00-23.00 shift 6x
|
Assorted screenshots of the CARME, CRYRING and gas jet target control systems in operation
|
Wed Feb 23 16:57:35 2022, CB, CN, Optimising motor motion
|
Optimised motor motion during run R58
Moved 2 mm in (20.3 potentiometer)
29.47 potentiometer |
Wed Feb 23 10:56:06 2022, Laszlo, Thanassis, Current status 10x
|
11:55
Temps OK
System Check OK |
Wed Feb 23 09:50:19 2022, Laszlo, Thanassis, Moving detector in
|
We are moving the detector in run 56 |
Wed Feb 23 08:58:30 2022, Laszlo, Thanassis, Current status 10x
|
10:00
Temps OK
System Check OK |
Wed Feb 23 07:58:38 2022, Laszlo, Thanassis, Current status 10x
|
09:00
Temps OK
System Check OK |
Wed Feb 23 06:58:19 2022, Laszlo, Thanassis, Current status 11x
|
08:00
Temps OK
System Check OK |
Wed Feb 23 06:00:25 2022, Jordan, George, Current status  
|
07:00
Pressure Stable
Temps OK |
Wed Feb 23 04:55:48 2022, Jordan, George, Current status  
|
05:55
Temps OK
System Check OK |
Wed Feb 23 03:52:13 2022, Jordan, George, Current status    
|
04:52
Pressure seems to be climbing a little but still stable (just peaked at end of check)
Temps OK |
Wed Feb 23 02:52:09 2022, Jordan, George, Current status  
|
03:52
Temps OK
System Checks OK |
Wed Feb 23 01:56:59 2022, Jordan, George, Current status   
|
02:56
Temps OK
write speed ~1.2Mb/s |
Wed Feb 23 00:54:17 2022, Jordan, George, Current status  
|
02:04
Temps OK
Data Rate - ~1.1Mb/s |
Tue Feb 22 21:57:13 2022, George, Jordan, Current status   
|
23:53
Temperatures OK
System checks OK - white rabbit fail diff ~ 80 |
Tue Feb 22 21:09:39 2022, David, Yuri, Current status  
|
Pressure seems as before 19:10.
Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine
Leakage current (WS4): 3.47 uA , stable current |
Tue Feb 22 20:08:40 2022, David, Yuri, Current status  
|
Recently the pressure started to raise a bit, we have increased the temperature from 129.1 K to 129.2 K. Current pressure at S1 2.10e-7.
Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine
Leakage current (WS4): 3.46 uA , stable current |
Tue Feb 22 19:28:35 2022, David, Yuri, vacuum
|
At 19:10 Frank called us that vacuum in sections 08 and 10 got worse by about 1.5 times. There is a possible danger that vacuum valves can get closed
if rest gas pressure is above the set treshhold.
Nikos warmed the cryostat by 0.5 degrees from 129.0 K to 129.5 K and the pressure became better than before. We cooled the system in steps of |
Tue Feb 22 19:11:18 2022, David, Current status 
|
Still trying to recover previous pressures, more details in the next entry.
Merger, Tape server (WS3) checks: DONE, writing ~1030 kB/s, refreshing is fine
Leakage current (WS4): 3.46 uA , stable current |
Tue Feb 22 18:23:02 2022, David. Yury, Vacuum problem
|
At 19:10 the vacuum has increased suddenly everywhere in the ring, roughly a factor 1.5. |
Tue Feb 22 17:32:38 2022, David, Current status 12x
|
Michael is modifying the settings of the electron cooler --> changed beam from bunched to coasting
Merger, Tape server (WS3) checks: DONE, writing ~1036 kB/s, refreshing is fine
Leakage current (WS4): 3.46 uA , stable current |
Tue Feb 22 16:09:08 2022, David, Yury, Current status 12x
|
Merger, Tape server (WS3) checks: DONE, writing ~1 1273kB/s, refreshing is fine
Leakage current (WS4): 3.46 uA , stable current
DAQ (WS2): temperature checked, |
Tue Feb 22 14:32:04 2022, David, Yury, Current status 12x
|
Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine
Leakage current (WS4): 3.48 uA , stable current
DAQ (WS2): temperature checked, |
Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run
|
13:20 Stopped run.
Slow comp thresh 0x64 -> 0x32 on all FEEs
Checkload x2 |
Tue Feb 22 12:01:46 2022, RSS, OF, ML, CB, Beam OFF, Target ON Run 54 9x
|
01:00
Beam optimisation since 09:25.
Target ON and open to the ring |
Tue Feb 22 10:30:00 2022, RSS, OF, ML, Beam OFF, Target ON Run 54 10x
|
11:30
Beam optimisation. No beam since 09:25.
Target ON and open to the ring |
Tue Feb 22 10:06:50 2022, RSS, OF, ML, PMT channel
|
YR00DA1ZB is the channel for PMT rate. |
Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14
|
Results of the fortran analyser programs for R54_14
No timewarps observed in the data
|
Tue Feb 22 08:31:25 2022, RSS, OF, ML, Beam OFF, Target ON Run 54 10x
|
09:30
Beam optimisation. No beam since 09:25.
Target ON and open to the ring |
Tue Feb 22 07:27:28 2022, RSS, OF, ML, Beam ON, Target ON Run 54 10x
|
08:30
Beam ON ~1.0E7 pps
Target ON and open to the ring |
Tue Feb 22 06:30:09 2022, RSS, OF, Beam ON, Target ON Run 54 10x
|
07:30
Beam ON ~8.0E6 pps
Target ON and open to the ring |
Tue Feb 22 05:47:18 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - 2 events at 10MeV! 11x
|
06:47
Beam ON ~2.0E6 pps, still fluctates between 1e6 and 6e6 (like a step function)
Target ON and open to the ring |
Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 11x
|
06:00
Beam ON ~1.5E6 pps, still fluctates between 1e6 and 6e6 (like a step function)
Target ON and open to the ring |
Tue Feb 22 04:09:28 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - first event at 10MeV ! 11x
|
05:00
Beam ON ~2E6 pps, still fluctates between 2e6 and 6e6 (like a step function)
Target ON and open to the ring |
Tue Feb 22 03:05:06 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 9x
|
04:00
Beam ON ~5.5E6 pps, but it fluctates between 2e6 and 6e6 (like a step function) in about each 5-10min
Target ON and open to the ring |
Tue Feb 22 02:02:11 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 10x
|
03:00
Beam ON ~7E6 pps
Target ON and open to the ring |
Tue Feb 22 00:32:35 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 
|
01:30
Beam ON ~6E6 pps
Target ON and open to the ring |
Mon Feb 21 21:04:08 2022, SHB, JM, CB, OH (remotely), Schottky RF view from the beam inside
|
|
Mon Feb 21 20:56:51 2022, SHB, JM, CB, OH (remotely), DAQ connection for ion current
|
signals from ICT and CRYRADIO are now connected to AIDA2 and AIDA5 respectively. ICT is set to factor 200 and CRYRADIO to 40 for now.
(AIDA3 --> electron cooler) |
Mon Feb 21 18:03:58 2022, SHB, JM, CB, OH (remotely), Info: signals on ion intensity for experiment
|
Currently 4 possibilities to have a look at the beam, all of them are OK to check whether there is beam or not, but some of them are better for checking
absolute values.
- Schottky RF signal |
Mon Feb 21 17:26:19 2022, JM, CB, SHB, OH (remotely), Beam ON run 53 9x
|
21/2/22 16:00
Call from main control room, beam is ON, probably has been for several hours judging by rate on xy total plot.
Changes made to online monitoring code by OH, include setting to only 1 DSSD, correct offsets from the pulser walkthrough, offline analysis capabilities |
Mon Feb 21 12:10:47 2022, RSS, JG, Alpha background run50
|
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK |
Mon Feb 21 10:59:48 2022, RSS, JG, Alpha background run50
|
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK |
Mon Feb 21 09:07:37 2022, RSS, JG, Alpha background run50
|
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK |
Mon Feb 21 08:05:45 2022, RSS, JG, Alpha background run50
|
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK |
Sun Feb 20 22:04:21 2022, JM, CB, Alpha Background run 50
|
Beam OFF. Run started 20/2/22 18:42
Fast comparator threshold HEC set to 0xff for all fees and asics to combat high energy noise bursts.
Electron cooler scalar plugged back into aida03 ~3000 per sec. |
Sat Feb 19 20:08:43 2022, JM, CB, Beam ON run 49 6x
|
Run started 19/2/22 21:05. Beam ON
Temperatures OK
System wide checks OK - white rabbit fails on all. |
Sat Feb 19 14:51:58 2022, JM, CB, Burst high energy noise    
|
Noticed bursts of high energy noise on aida01 and aida02 during run 47 and 48.
Good events rate jumps from 10-20k range to 250k. ADC data items rate jumps from 0-1 to 2k. Data rate being written increases to ~2500 kb/s from
~20 kb/s |
Fri Feb 18 20:31:33 2022, JM, CB, Alpha Background run 48
|
Alpha background started with beam ON - run47. Run started 16:49 18/2/22 (beam subsequently found to be OFF)
Beam energy 4 keV, beam lifetime ~ 100 ms
Noticed aida01 and aida02 were showing increased good event rates to ~250,000, effect seen on spectrum browser and data writing rate increased |
Fri Feb 18 13:03:02 2022, RSS, ML, CB, Alpha background run46 11x
|
14:00
Check Leakage current: (see attachment 4) |
Fri Feb 18 11:07:52 2022, RSS, ML, CB, Alpha background run46 11x
|
12:00
Check Leakage current: (see attachment 4) |
Fri Feb 18 08:58:08 2022, RSS, ML, CB, Alpha background run46 11x
|
10:00
Check Leakage current: (see attachment 2) |
Thu Feb 17 18:19:16 2022, JM, CB, SD, Alpha Background run 46   
|
Both GSI vacuum group and edinburgh ion gauges OFF
Fees power cycled. All system checks OK.
Writing to file, alpha background overnight. |
Thu Feb 17 16:26:27 2022, JM, CB, SD, Gauges OFF, Pulser Movement tests 7x
|
Edinburgh group ion gauge turned OFF -> decrease in leakage current from 10.05 uA to 6.5 uA
GSI vacuum group ion gauge turned OFF -> decrease in leakage current from 6.5 uA to 3.63 uA
GSI large ion pump turned ON -> no effect on leakage current |
Thu Feb 17 15:09:40 2022, JM,CB,SD, Alpha background run44 8x
|
16:09
Check Leakage current: (see attachment 1) |
Thu Feb 17 13:12:19 2022, RSS, AG, Alpha background run43 11x
|
14:00
Check Leakage current: (see attachment 1) |
Thu Feb 17 08:31:07 2022, RSS, AG, Alpha background run43 11x
|
09:15
Check Leakage current: (see attachment 2)
Check NewMerger tab: (see attachment 5) |
Wed Feb 16 21:41:11 2022, JM, Run 43 Alpha Background 8x
|
22:41
Check Leakage current: (see attachment 1) = 10.01 uA and falling
Check NewMerger tab: (see attachment 2) |
Wed Feb 16 21:27:31 2022, JM, Cryring signals, Pulser tests, Waveforms 11x
|
On 15/2/22 it was noted that the leakage current increases when the motors are moved IN. This is contary to tests conducted on 12/2/22 (elog 192) where
no increase was observed.
16/2/22: Servo motor and pneumatic used to move in by different differences with leakage current observed to increase linearly with distance |
Wed Feb 16 15:27:53 2022, EM, JM, Run 41 Pulser tests 11x
|
16:30
NOTE: Pulser is ON!
Check Leakage current: (see attachment 1) |
Wed Feb 16 12:43:05 2022, TP, RSS, Alpha background run40 11x
|
13:30
Check Leakage current: (see attachment 1)
Check NewMerger tab: (see attachment 2) |
Wed Feb 16 08:27:27 2022, TP, RSS, Alpha background run40 11x
|
09:15
Check Leakage current: (see attachment 1)
Check NewMerger tab: (see attachment 2) |
Tue Feb 15 21:28:14 2022, JM, Noisy Channels 
|
All fees and asics checked to find noisy channels. Channels are listed along with the noise peak height for the low energy plot at 22:00. Run started
~17:45.
Attachment 1 shows 3*L for aida01 with x axis zoomed in on noise peak. Attachment 2 shows stat for aida01-04 in log scale. |
Tue Feb 15 14:59:37 2022, JM, CB, RJC, Pulser walkthrough 11x
|
16:00
Check Fee temperatures: all green (see attachment 1)
Check statistics tab: ADC data items (see attachment 2) |
Tue Feb 15 10:46:37 2022, RSS, LV, CB, Alpha background run37 10x
|
11:30
Check Fee temperatures: all green (see attachment 1)
Check statistics tab: ADC data items (see attachment 2) |
Mon Feb 14 09:56:39 2022, CB, Shifters instructions 2022 10x
|
EMERGENCY SHUTDOWNS
1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)
2. Internal target: Q on keyboard while on workspace 3 of appc218, go to server room, press "CLOSE" button on DUMP. |
Sun Feb 13 21:28:35 2022, JM, CB, Alpha background Run 32, 35 6x
|
Alpha background gathered from 17:35 12/2/22 to 13:44 13/2/22 is run32. Run time ~20 hours. Some alphas visible in aida1 1*L histograms attached.
Noticed grounding of crimps that attched to cryring ground has come loose. Those crimps not ideal for our grounding cable so were loose. Grounding
cable from each fee now meet at a single grounding cable joined by an m3 nut and bolt. This grounding cable then goes to the cryring ground and |
Sat Feb 12 19:48:38 2022, JM, CB, Grounding and movement tests 11x
|
> Initial grounding see final grounding from elog 187. ASIC settings for all - LEC slow comparator 0x64. Note on 11/02/22 1.8*L widths with same settings
were aida1-4: 300,240,250,260
ADC data items <10k |
Thu Feb 10 09:12:41 2022, OH, CB, US, Hourly motor movement 
|
To test effect of the motors on the leakage current, they were cycled once per hour overnight at approximately 50 minutes past the hour. - attachment 1
Leakgage current was seen to decrease slowly overnight before flattening out.
|
Wed Feb 9 08:01:41 2022, OH, CB, G-HC, Results from no beam overnight 
|
08:52 Overnight the DAQ was left running to check if there was any individual radioactivity in the Si.
This is stored in R7_75
|
Tue Feb 8 08:13:53 2022, OH, CB, DF, Hopefully effect of beam tuning on detectors 9x
|
09:00 Detector still biased to 60V and leakage current has been mostly stable overnight.
Only minor fluctuations observed - attachment 1
|
Mon Feb 7 08:09:50 2022, OH, CB and PH, CARME Server setup and initial tests
|
09:09 Arrived at GSI for comissioning beamtime.
CARME currently in a stopped state, with all FEEs powered off.
Upper detector is biased with 80V and has a leakage current of 9.92uA.
|
Fri Feb 4 12:49:54 2022, TD, JM, Grounding Tests and current status 10x
|
JM plans to install new crimped, 3mm dia copper drain wires (a la AIDA@DESPEC) this afternoon.
|
Fri Feb 4 09:53:48 2022, JM, TD, OH (remotely), Alpha spectra overnight 8x
|
DAQ was left running last night from 19:30. Detector bias 80V with a leakage current ~3.4 uA. Pulser OFF.
Observed alphas in spectra overnightin the 20,000 to 28,000 channel range for the pn side and 36,000 to 44,000 range on the nn side of the detector.
Zero energy noise peak is at channel 32000. |
Thu Feb 3 22:05:33 2022, JM, TD, OH(remotely), Bias update and grounding
|
9:30 Bias remained stable overnight - 60V 2.95 uA.
10:00 No grounding attached initailly. Pulser ON, lots of noise across all ~250-300 kHz across biased detector. Waveforms and histograms saved
to /tmp. Pulser width for aida 6 ~300 channels. Aida 7,8 similar, aida 5 producing no ADC data. |
Wed Feb 2 21:53:32 2022, JM, TD, Detector Bias   
|
FEE mounts for 5,6,7,8 disassembled to access adaptor boards. No sign of debris which could cause short on adaptor boards.
Adaptor boards removed and checked against spares with multimeter. Both show same characteristics. Pins on feedthrough checked using multimeter.
No longer see -18.5 KOhm between bias pins, no see 140 kOhm which is similar to bias pin to non bias pin from prevous tests. |
Tue Feb 1 14:43:20 2022, JM, TD, Detector Bias, FEEs    
|
Detector is not biasing as it has in previous tests. Last bias 15/1/22 see previous elogs, max leakage current ~10 uA at 150V
Detector bias increases well above 10uA for voltages as low as 30-40V. Optical windows covered, Y09 valves closed, large ion pump OFF and both
ion gauges OFF produces similar results but with a slightly lower leakage current. |
Mon Jan 31 08:58:38 2022, OH, TD, JM, centos server configuration 8x
|
Steps taken:
- MIDAS_Releases, Embedded and Exports files brought across from the previously working SL6 aida-gsi install. Brought as tar balls to preserve ownership
- dhcpd.conf set up with same IP addresses as used on the SL6 install from aida-gsi
|
Sat Jan 29 11:04:07 2022, JM, OH, Grounding and Pulser
|
Grounding
Ground cables have been daisy chained together from FEE to FEE. Ground cables are screwed into a feee bolt hole on the FEE body using an M3 bolt.
LEMO cables have been connected in a similar way between the grounds on the adaptor boards for each FEE. Short LEMO cables go between J6 on pairs |
Thu Jan 27 21:33:40 2022, JM, OH, AIDA config files, remote access, motor test
|
Power, Ethernet and HDMI cables connected to FEEs. To prevent cables coming out of connectors, power and HDMI cables are zip tied to FEE cooling pipe
(see attached image).
Correct FEE MAC addresses have been updated in /etc/dhcp/dhcpd.conf |
Thu Jan 27 15:24:02 2022, OH, JM, Access to Motors PI
|
1. ssh <user>@lxpool.gsi.de
2. ssh <user or carme>@atppc022.gsi.de
3. ssh pi@CARMEmotorspi (Standard npg password) |
Thu Jan 27 15:19:18 2022, OH, JM, Enabling internet access on the carme-gsi server
|
To use both anydesk and firefox on the carme server require an internet connection.
As the server is on the cryring local network an ssh tunnel needs to be opened to the GSI proxy server.
|
Thu Jan 27 14:04:34 2022, OH, JM, Remote access to CARME server
|
1. ssh into lxpool network: ssh <user>@lxpool.gsi.de
2. ssh into atppc022.gsi.de: ssh carme@atppc022.gsi.de (This is an rpi access server. Don't run code)
3. ssh into carme server: ssh npg@carme-gsi
|
Wed Jan 26 19:16:18 2022, JM, OH, Water cooling, FEE MAC address  
|
Water cooling has been connected to the FEE's. Flow meter installed to outlet manifold by way of two right angled pieces. No leaks observed
rom any points in the coolant loop, loop will be bled using taps tomorrow. Water turned OFF overnight.
FEE's powered up with the MAC addresses of each read. 1 is the very bottom FEE and 8 the very top. FEE's have also labelled with the |
Sat Jan 15 15:38:25 2022, JM, OH, TD, FEE installation, cable management    
|
All 8 FEEs have been installed in their holders.
The damaged feedthrough does not have the D-connector on the adaptor board inserted into the falnge but the FEE is connected to the adaptor board.
FEE's were carefully installed, with one person inserting FEE and another making sure FEE was straight and on the correct pin positions. |
Sat Jan 15 11:28:10 2022, JM, Inventory 
|
Vaccum
DN250CF 1x gaskets
DN200CF 5x gaskets
DN160CF 1x gaskets, 2x blank flanges
DN100CF 69x gaskets, 19x blank flanges, 14
double feedthroughs (1 damaged)
DN63CF 3x gaskets, 2x blank flanges
DN300CF 5x gaskets
DN350CF 0x gaskets
1X WIRE SEAL
DN35CF 3x gaskets, 13 |
Fri Jan 14 10:00:18 2022, TD, OH, JM, Friday 14 January
|
11.00 Per https://elog.ph.ed.ac.uk/CARME/170 and https://elog.ph.ed.ac.uk/CARME/171 issues have been identified with the FEE64 carriers and adaptor PCBs
|
Thu Jan 13 10:33:24 2022, JM, OH, TD, Adaptor Board misallignment  
|
The ERNI connector is not central on the adaptor boards causing misallignment with the FEE.
The adaptor board is 80mm long. The ERNI connector is 50mm long. The connector is 13mm from the 2x Lemo side and 17mm from the 3x Lemo side.
This results in misallignment between the FEE and adaptor board. |
Wed Jan 12 20:07:20 2022, JM, OH, TD, FEE holder installation 10x
|
4 FEE holders installed on CARME. Mounting procedure devised due to limited working space to install.
Mounting procedure:
>Install FEE holder mounts (image 1) onto feedthrough flange |
Tue Jan 11 12:45:15 2022, TD, JM, OH, Coolant manifold installation + detector pin tests  
|
2x cooling water manifolds with 2x 8 ports have been installed - see attachments 1 & 2
'drain' ports at top of manifold to permit release of trapped air volumes. Local technicians will install a standard blank in one manifold and a small |
Mon Jan 10 20:52:53 2022, JM, TD, OH, Baking tent removed, VI tests  
|
Baking tent, frame and trays fully removed from CARME chamber. Removal of baking frame required removing air lines from upper gate valve and repositioning
of vacuum hose connecting turbo pump to backing line and turbo power cable. Some difficulty encountered removing upper baking frame now the target support
frame is assembled. Small modification seperating section in two would aid future installation and disammebly. |
Tue Dec 7 09:39:59 2021, CB (remotely), Gate valves closed
|
Dry run complete.
YR09 section valves closed. Section isolated. Manual valve between electron target and CARME remain open. |
Tue Nov 30 10:49:43 2021, CB (remotely) GV, Gate valve opened
|
GSI vacuum division IE514 gauge connected.
Gleb reports gate downstream opened. Vacuum goes up and recovers as expected. |
Sun Nov 28 15:57:45 2021, CB (remotely), Nov 2021 temperatures
|
Attached |
Fri Nov 26 10:01:45 2021, CB (remotely) ML, Power cut in the CRYRING cave
|
ML reports power cut in CRYRING cave. Reasons unknown. No effect on vacuum, but top valve closed for safety reason. Ramping down temperature. |
Wed Nov 24 12:08:08 2021, CB + ML OG, Ion pumps on  
|
Found SIP power unit for D2000 #4 not functioning correctly. Max current regardless of ion element connected to.
ML kindly loaned a spare. All D2000 work Ok now. Will have to send faulty unit for repairs back to SAES. |
Tue Nov 23 08:49:33 2021, CB + ML, NEG activation completed   
|
Found temperatures and pressure stabilised overnight. See attached.
12:00 Began activation of 3x UHV1400 in channel 2, top module. Started using 90 W as per procedure. No effect on temperature. Increased to 120
W. OK |
Mon Nov 22 08:06:01 2021, RSS CB + ML, NEG activation starts  
|
08:20 Temperature of channels 1-3 and 5-6 were reduced to 120 degrees. Immediately after, the conditioning of the NEGs was stopped and D2000s ion pumps
were flashed 5 times. The temperature of the gas jet target and the electron target channels was reduced to 120 degrees.
11:00 Started activation of D2000 following procedure in ... at T=400 C for trise 30 min + thold 90 minute. After activation, NEG elements are |
Fri Nov 19 12:03:51 2021, CB RSS, Conditionings NEGs 
|
Increased conditioning temperature in D2000 #3 and 4 (behind detectors) to 150C from 130/140C. No appreciable change in temperature. Minor effects in
pressure.
Pressure has completely recovered from yesterday and did not settle on higher/lower plateau value which may suggest conditioning the D2000 NEG |
Thu Nov 18 13:50:51 2021, CB RSS, Thermocamera images 14x
|
Used thermocamera provided by GSI beam diagnostic division to take some pictures of YR09. See attached.
Due to aluminium outer wrapping some reflections are inevitable, but tried to only take pictures of heat spots that did not disapper from different
angles. |
Thu Nov 18 12:29:50 2021, CB RSS, Conditioning D2000 NEGs 
|
D2000 thermocouples report temperatures around 100C (D2000 #1,2) and 120C (3,4). 1,2 are in the intermediate chamber, 3,4 are behind the moving arms.
3 is directly being the detectors.
Wanted to flash ion elements in D2000, but SAES recommend >100C to flash. |
Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
|
CARME baking with heating tape continues
Left overnight at -
Ch1-3: 140 degrees |
Tue Nov 16 12:05:13 2021, CB RSS, CARME baking with tape continues   
|
CARME baking with heating tape continues
Left overnight at 100C. Turned up this morning at 9:00 to 120C.
All good except detector strain relief seems to be going much higher than detector (no obvious reason) and then cool down. Proximity to flange |
Fri Nov 12 08:54:11 2021, RSS ML + CB (remotely) NK AK NP, First CARME baking attempt  
|
07:50 Small leaks (near the motors and upper valve) were detected in the tent which were covered with Al foil.
08:10 ML changed the baking temperature to 120 degrees.
09:40 Since the bottom of CARME is cold, due to uneven distribution of heat, baking is stopped. |
Thu Nov 11 11:44:58 2021, RSS + ML OG + CB (remotely), CARME baking started    
|
With the help of OG, the baking tent was built. MG started baking around 11:30 am with a rate of 0.2 K/minute.
Heating update can be found on: https://web-docs.gsi.de/~lestinsk/baking.php (CARME temperature plot now visible as well - thanks Michael!)
where, device - 192.168.207.192 is for CARME. |
Thu Nov 11 14:01:00 2021, AK, ML, Heater channel layouts
|
Schematic layout of heaters and channel assignment attached. Table kindly provided by AK. I hope the conversion from excel to pdf didn't swallow
any important information. |
Wed Nov 10 18:38:16 2021, RSS TD + ML OG AK NK, CARME wrapped in heating tape    
|
Heating and electronic experts were in CRYRING and were unhappy with the damaged wire. Heaters were opened by OG, but no damage was found. It is suggested
to replace the entire wire and then get it approved by the concerned authority.
To avoid further delays, ML and TD agreed on heating tapes/wires covering the chamber. OG helped in wrapping the heating wire around. Tent is |
Wed Nov 10 18:24:12 2021, RSS, Thermocouple labelling  
|
1. Detector
2. Chamber back
3. Strain relief |
Wed Nov 10 14:41:12 2021, TD RSS + CB (remotely), Wrapping CARME in heating tape
|
ML reports that baking of the upstream section (gas jet interaction chamber plus e-target) has commenced - initially to 50 deg C to check thermocouples.
If OK baking
temperature will be ramped slowly (which I think means c. 10 deg C per h) to limits established for specific components by the e-target.
|
Tue Nov 9 15:03:29 2021, RSS + OG, Burnt cables issues 7x
|
Upper part of the frame was mounted. In order to do so, the valve was closed, turbo wire and hose were disconnected and then connected. Valve was opened
again. See pictures 1-2.
Bottom part of the tent was constructed with 3 heaters (from one of the controllers) at the front, 4 in the middle, and 4 at the back (4+4 from |
Mon Nov 8 17:19:02 2021, RSS + OG, Neg and ion cables connected  
|
Neg and ion pump cables were labeled and connected.
Kapton tape wrapped around the neg cable connectors for the strain support.
Lower frame mounted. |
Sat Nov 6 14:21:10 2021, CB RSS, Preparation for bakeout tent mounting + to do for next week
|
Connected pneumatic hoses prepared by Gleb. Opened flow to pressure reducer set at 2 bar. Ok. Attempted to operate pneumatic motors. Somehow left / right
pneumatic motors controls swapped around! Works fine otherwise. Most likely hardware issue, i.e. hoses are inverted inside motor box. Software fix possible
in principle. Probably easiest to swap hoses going out from motor box (top to bottom and vice versa). Could not pull out hoses after installing. To do |
Fri Nov 5 12:27:11 2021, CB RSS + DR NP ML US, First pump down of YR09    
|
Tightened all flanges.
Added Pirani gauge and third IE514 to interaction chamber.
Stated pump down. Around 100 mbar on Interaction chamber Pirani gauge very loud metallic noise is heard. Found bellows between CARME and interaction |
Wed Nov 3 16:39:01 2021, CB RSS + NP DR NK ML, Interaction chamber lifted in place  
|
Prepared to move interaction chamber in place. Ok CARME side, flange has M10 bolts. On interaction chamber side i.e. bellows it has M8 bolts.
DS designed this to have loose fit under assumption of M10 side actually being 3/8 holes i.e. 9.9 mm. However holes are 10.2 mm. Furthermore
Grossmontage suggest loose fit will be damaged in baking in the long term. |
Wed Nov 3 11:18:11 2021, CB RSS + DR NK ML, Leak closed 
|
Found CARME at 1.0E-6 mbar. Beginning leak test.
Found leaks in the same location as before. Roughly 1~3E-8 mbar l second vs. base leak of 1E-12 |
Tue Nov 2 12:45:36 2021, CB + DR NK, Issues with CARME feet
|
Attempted to close CARME as carefully as possible.
Swapped out one foot for another one and temporarily removed a second to allow CARME to rotate slightly and get a better alignment of the two
surfaces of the COF600 flange. |
Mon Nov 1 14:48:16 2021, CB + ML DR, CARME opened
|
Confirmed leak as per previous Elog.
Tightened to 100 Nm - no effects.
Tightened to 130 Nm - bottom leak disappeared. Top leak still at 1.3E-8 mbar l second. |
Sun Oct 31 13:55:13 2021, CB OH, Leak tests
|
Found CARME at 2E-7.
Closed valve on top of roughing pump. Clamp was not tight. Pressure still good.
|
Sun Oct 31 08:05:15 2021, CB OH + DR ML, CARME closed again + feedthroughs labeled 11x
|
(Fri 29 October)
Cleaned wire seal recess and labeled thermocouples and flanges to identify p-n vs. n-n side and ports with bias pin. See attached in case baking
damages the label. |
Sun Oct 31 07:55:39 2021, CB JM + OH, Strain relief mounted  
|
(Thu 28 October)
All strain relief extension plates mounted behind the wires, using SS countersunk bolts (not silver plated).
Inserting bottom part of MACOR strain relief causes wires to bend too much with strain placed on DSSD. No reasonable way to proceed like that. |
Sun Oct 31 07:41:20 2021, CB JM + RSS, Wires plugged in DSSDs 8x
|
(Wed 27 October)
Started with top-most flange. Attemptedto plug in MACOR lead in DSSD plug in preparation for jacking in. Realised that extender plate thickness
causes plug to be rasied with respect to nominal position, which results in plug non entering straight. Removed extension plate. |
Sun Oct 31 07:29:17 2021, CB JM + RSS OG, Detectors mounted on plate in CARME 8x
|
(Wed 27 October)
Dismounted plate from rod. Dismounted broken detectors from plate and placed back in box. Dismounted "dog leg" struts and replaced
with fully un-threaded struts. |
Sun Oct 31 07:21:09 2021, CB JM RSS, Detectors arrived in GSI 6x
|
(Tue 26 October)
Two new CARME DSSD arrived in GSI and collected. Visually inspected both sides. No obvious damage. Photos attached. Second detector (3335-2)
was shipped in upside-down box. Does not seem to have made any difference. |
Fri Oct 29 15:09:27 2021, CB JM + RSS OG DR, Preparation to mount new DSSDs 6x
|
(Mon 25 October - Tue 26 October)
Considered different strategies to mount DSSDs inside CARME, while waiting for 2x new DSSD to arrive.
Plan A: Mount DSSDs on plate on the bench, slide plate on rod, then attach cables, then attach strain relief |
Sat Oct 23 12:58:11 2021, JM, GSI vacuum and bakeout testing summary    
|
Attachment 1 shows the pump-down of the CARME chamber at GSI before installation of kapton cabling inside the chamber and mounting of the chamber on
the ring. Discontinuity in the plot is from switching between the pirani gauge and IE514 gauge. The pumping of the chamber in the turbo regime follows
the power law where P ~ 1/(nt) due to outgassing from the chamber being dominated by water outgassing which has an n ~1 dependence (for first order |
Fri Oct 22 13:22:48 2021, TD, CARME FEE64 adaptor PCB 10x
|
|
Fri Oct 22 13:11:26 2021, TD, MSL type TTT14 assembly drawings & pin assignments 
|
|
Thu Oct 21 20:26:44 2021, JM TD, Thermocouple and Connector cables 10x
|
NEG pump electrical connections tested - all connections sound.
Detector carriers have been redrilled and are currently being cleaned. Carriers were checked within the chamber, mounting much easier with new
hole. Distances to NEG feedthroughs and thermocouple feedthrough from the carrier also checked. NEG feedthroughs have sufficient separation now moved, |
Mon Oct 18 16:25:11 2021, JM RSS TD, NEG rotation + cable removals  
|
Kapton cabling and the broken ceramic detector holder have been separated. Required holding jacking plate in a vice and using lots of propanol to wet
the jacking screw. A long set of kapton cabling has been removed from the other side of the chamber which can be used when mounting the detectors. The
feedthrough flange was re-mounted on that side with no kapton cabling. |
Sun Oct 17 11:48:48 2021, TD RSS, Sunday 17 October 14x
|
Looking downstream the RHS motor assembly has loose green/yellow (gnd?) see attachment 1
Install blank base plate to trial install in downstream CARME chamber. The rod is just through all of the mounting holes - see attachments 2 & 3
|
Sat Oct 16 17:25:47 2021, RSS TD, Broken detectors    
|
One of the detectors was damaged while mounting (see pictures 1-3).
Second detector was found already damaged when opened (see pictures 4-5). |
Fri Oct 15 19:37:12 2021, RSS TD + DR, Friday 15 October 8x
|
Ring seal is out. See picture 1.
Bellow (towards CARME) was installed in the gas jet chamber. Attached are some pictures. |
Thu Oct 14 15:54:47 2021, TD RSS, Thursday 14 October 
|
Attachment 1 - what is function of the 4x c/s holes indicated?
|
Wed Oct 13 15:28:22 2021, RSS TD + OG, Split funnels 7x
|
Split funnels installed on 4 (of 8) 2x78 way D connector feed-throughs. |
Wed Oct 13 15:16:12 2021, TD, Orientation of 2x 78 way D connector feedthroughs   
|
Looking downstream
|
Wed Oct 13 12:06:09 2021, RSS TD, Flanges cleaned 12x
|
RSS & TD had some success cleaning the COF600 flange surfaces of the staining and residues observed when the downstream COF600 section was opened yesterday
https://elog.ph.ed.ac.uk/CARME/118
|
Wed Oct 13 11:59:23 2021, TD, [How to] Open COF600 copper wire seals 
|
Use the M10 jacking points provided top/bottom and
left/right on the upstream and downstream sides of the
|
Tue Oct 12 13:54:21 2021, RSS TD + OD DR, CARME opened 20x
|
With the assistance of Oemer and Davide all of the M22 bolts removed from the downstream section of the CARME chamber. To separate the downstream section
from the
upstream sections it was necessary to use a lever between M10 bolts screwed into the lift points of adjacent sections of the CARME. The upstream sections |
Tue Oct 12 09:22:37 2021, RSS TD + OG DR, Motors problem solved 
|
Neg and ion cables were taken off and were put in the box.
Top support was taken off.
Motors are rotating again. Have to be careful with the position of the limit switches. |
Mon Oct 11 11:24:16 2021, RSS TD ML, Valve support and cable labeling  
|
Split funnels were given to Oemer for cleaning. Have received them back after lunch.
Valve support is installed again (see picture 1).
Ion pump was connected but not activated. Michael will help in doing so. No vacuum support to help will RGA. Will proceed without it. |
Sat Oct 9 09:47:33 2021, CB, To do list for next week
|
0. Give split-funnels to OG or Grossmontage to clean. Mount back foot support for gate valves. Critical when we split.
1. Wait for vacuum division to come to install: IE514 cables to current CM52 module, ion pump cables + controls + turn on, RGA head + program
+ turn on |
Sat Oct 9 09:44:36 2021, CB RSS, Heaters removed + motors tests
|
Removed thermocouples, heaters, RE72 modules and leftover baking tent. Support octagon removed except topmost part which requires disconnecting pneumatic
hoses going to top gate valve. To be done on Monday with ML assistance.
Attempted to move servo motors once more - did not work. The motors appear stuck but it is not clear how or where. Removed screws on flanged |
Fri Oct 8 17:56:35 2021, CB RSS, Motors test 
|
Attempted first motor test in XHV. Wired and connected limit switches and string potentiometer.
Set up raspberry pi to control motors (.124). Set up pi for remote headless access.
Moved jumper on Teknic hub from 1 to 2 motors configuration. |
Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV
|
CARME reached 9E-12 this morning
Ion pumps on
|
Wed Oct 6 15:36:14 2021, CB RSS, Neg activation tests -3
|
Attempted to activate 2xUHV1400 connected to bottom C4, channel #2 using P 200 W, t rise 30 min, t hold 90 min.
Temperature of Kapton bundle increased drastically to 160+ C. Had to stop. Conclusion is that these are likely
the two UHV1400 on the bottom of CARME, immediately in front of the Kapton bundle.
|
Wed Oct 6 09:47:30 2021, CB RSS, Neg activation tests -2
|
Attempted activating 2xUHV1400 connected to top C4, channel #3 with P 300 W (450 C?), t rise 30 min, t hold 90
min as yesterday
|
Wed Oct 6 09:39:59 2021, PB CB, Original dirty assembly of CARME internals 7x
|
PB found pictures of the original dirty assembly, before screws and components were shipped to DL.
See attached. |
Tue Oct 5 17:30:01 2021, CB RSS, NEG activation tests  
|
Found D2000 #1 activated and at 250C (25W)
to prevent getting dirty when other NEGs
are activated. See previous entries.
|
Tue Oct 5 11:44:11 2021, CB, TD , SAES manuals & cable drawings 8x
|
NEG power
SIP power
UHV1400 operating instructions |
Mon Oct 4 20:30:46 2021, RSS JM CB (remotely), CARME baking status -21 
|
Current temperature ~95 C (on manual mode)
See plot and screen attached.
Current pressure 2.86E-10
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Mon Oct 4 09:19:11 2021, JM RSS, Activation of NEG elements   
|
9:30
Ion pumps de-gassed by switching on and off multiple times. Large pressure increase the first time pumps were flashed, pressure recovers quickly
once pumps off. Subsequent flashing of ion pumps showed a significantly smaller pressure increase, unitl little increase was seen. |
Mon Oct 4 06:34:58 2021, RSS JM CB (remotely), CARME baking status -20 
|
Current temperature ~110 C (on manual mode)
See plot and screen attached.
Current pressure 3.20E-8
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Sun Oct 3 08:36:01 2021, RSS JM CB (remotely), CARME baking status -19 
|
08:36
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure 1.41E-7
19:42
Temperature
is being slowly reduced (<10C/h) to ~100C in order to activate NEG pumps Monday morning.
Current pressure ~1.2E-7 and will begin to drop.
23:20
Temperature
set point 110C.
Current pressure ~5E-8
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
|
Sat Oct 2 22:14:14 2021, RSS JM CB (remotely), CARME baking status -18 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure 1.60E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Sat Oct 2 08:26:49 2021, RSS JM CB (remotely), CARME baking status -17 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure 1.73E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Fri Oct 1 21:47:51 2021, CB (remotely), CARME baking status -16 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
|
Fri Oct 1 07:17:46 2021, RSS JM, CARME baking status -15 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure ~2.30E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Thu Sep 30 18:16:52 2021, RSS JM, CARME baking status -14 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure ~3.30E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Thu Sep 30 06:29:39 2021, RSS JM, CARME baking status -13 
|
Current temperature ~130 C (on manual mode)
See plot and screen attached.
Current pressure ~4.07E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Wed Sep 29 15:34:07 2021, RSS JM, CARME baking status -12 
|
Current temperature ~130 C (on manual mode)
See plot and screen attached.
Current pressure ~4.51E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Wed Sep 29 13:13:51 2021, JM RSS PB(remotely), Detector frame assembley   
|
29/9/21
We have opened the cleaned parts for assembley of the moving detector frames. We appear to have everything we require.
Standoffs - 12 M3x35 bolts, Many M3 washers, Many M3 nuts, 16 standoff tubes. |
Wed Sep 29 09:27:38 2021, CB (remotely), RSS JM ML, Power cut
|
Sudden and unexpected power cut at 10:02 German time, affecting all the target hall.
It has been caused by the emergency alarm being triggered. Reasons unclear. Electricians were informed.
|
Wed Sep 29 06:49:41 2021, RSS JM, CARME baking status -11 
|
Current temperature ~130 C (on manual mode)
See plot and screen attached.
Current pressure ~6.08E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Tue Sep 28 18:53:13 2021, RSS JM, CARME baking status -10 
|
Current temperature ~130 C (on manual mode)
See plot and screen attached.
Current pressure ~9.98E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Tue Sep 28 12:18:54 2021, RSS JM, CARME baking status -9 
|
Current temperature ~130 C, was set to 130 C on manual mode around 10:00 am
See plot and screen attached.
Current pressure ~1.37E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Tue Sep 28 06:40:22 2021, RSS JM, CARME baking status -8 
|
Current temperature ~120 C, increasing
See plot and screen attached.
Current pressure ~1.07E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Mon Sep 27 21:33:50 2021, CB (remotely), CARME baking status -7 
|
Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may have come loose judging from sudden jump in temperature at 14:30?
|
Mon Sep 27 17:53:35 2021, JM RSS , Baking Jacket upgrade + NEG controllers connected   
|
Additional baking jacket sections for the turbo section arrived today. Baking was halted at ~11:00 to allow for the chamber to cool to install new sections.
New sections installed and baking restarted at 15:25. Jacket fits much better with gaps near the turbos and the motors now covered much better. Attached
are some photos. |
Mon Sep 27 11:09:48 2021, CB (remotely), Temperature vs Pressure plot
|
Attached. |
Mon Sep 27 06:42:45 2021, RSS JM, CARME baking status -6 
|
Current temperature ~102 C. Was set in the manual mode since last evening 18:54.
See plot and screen attached.
Current pressure
3.62E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Sun Sep 26 17:20:13 2021, RSS JM CB (remotely), CARME baking status -5 
|
Current temperature ~105 C
See plot and screen attached.
Current pressure 6.08E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Sun Sep 26 07:41:00 2021, CB (remotely), CARME baking status -4 
|
Current temperature ~87C
See plot and screen attached.
|
Sat Sep 25 19:01:50 2021, CB (remotely), CARME baking status -3
|
Baking automatically stopped due to negative gradient in on thermocouple for 10 minutes straight.
Not surprising giving we were baking at full power bu making little progress. We should have switched to manual
mode.
|
Sat Sep 25 07:23:06 2021, CB (remotely), CARME baking status -2 
|
Current temperature ~90 C
However note setpoint is at 102 C. It appears we are baking at full power, but too many heat losses?
Temperature gradient still increasing. May just be a matter of time.
|
Fri Sep 24 15:36:34 2021, CB (remotely), CARME baking status 
|
Current temperature ~64 C
See plots attached
|
Fri Sep 24 09:44:58 2021, JM ML, Vacuum gauge readout
|
The analog readout of the Combivac controller for the IE514 ion gauge has been set up, readings are plotted to http://web-docs.gsi.de/~lestinsk/vacplot.php.
Readings and plot should be updated every minute. |
Fri Sep 24 08:47:36 2021, JM RSS CB(Remotely), Baking
|
Baking halted on 23/9/21 16:16 as connection to TC08 module was lost. USB cable connection to TC08 module appears to have been damaged in shipment. USB
hub and cable replaced, connection re-established and baking restarted 17:27.
Ramping of baking limited to 40C by the maximum difference between parts of the chamber being too high, this safety feature prevents high thermal |
Fri Sep 24 07:04:57 2021, RSS JM, IE 514 pin arrangement and degas instructions 
|
Fabre (German) Color (English)
grau
grey |
Thu Sep 23 14:19:27 2021, CB (remotely), Checking baking remotely - instructions
|
1. Connect to pi on CRYRING local network
ssh pi@192.168.207.127
|
Thu Sep 23 13:31:12 2021, JM RSS ML, IE514 Gauge and Bakeout   
|
CARME setup checked by vaccum group this morning.
Both IE514 gauges de-gassed. To de-gas on the CM52 controller select the channel and hold the right arrow for two seconds. The reading will flash
indicating the de-gassing procedure, this lasts for 2 minutes before completing. Flashing automatically stops once procedure finishes. Attached for convinience |
Wed Sep 22 14:44:51 2021, JM RSS ML, CARME leak test + bakeout tent    
|
On 21/9/21 CARME was connected to the leak tester. Leak testing showed no apparent leaks, extra time required to reach <1e-4 mbar during initial turbo
pumpdown might be due to outgassing from additional installed components on the chamber. Turbo pump restarted
21/9/21 16:28 9.73e-7 mbar |
Wed Sep 22 08:30:08 2021, CB (remotely), CARME pressure during first XHV test
|
CARME pressure moved to
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
|
Mon Sep 20 11:45:45 2021, JM RSS ML, CARME installations 6x
|
Ion pump, RGA and additional gauge installed on the chamber.
Our gauge is the one mounted above the NEG feedthrough, Michael's gauge is mounted below the feedthrough. Ion pump too large to install on
the top of the vessel, sufficient room on flange immediately next to this top flange. |
Tue Sep 21 08:20:39 2021, ML, CARME installations
|
Quote:
Ion pump, RGA and additional gauge installed on the chamber. |
Sun Sep 19 09:11:34 2021, CB (remotely), Baking RasPi status
|
Accessed Pi remotely
( 1. Without the Internet, the Pi has no way of knowing what time is it.
|
Fri Sep 17 16:42:25 2021, JM RSS ML + OG, CARME Realignment + Thermocouple installation 8x
|
Laser surveying team worked till 11. Chamber was too high by 3mm close to the jet target and 6mm by the turbo pump (towards the dipole).
CARME lowered appropriate amount using bolts under CARME feet. Height checked using a laser on the centre point line of the middle flange turbo
end and mid point on the front of the chamber (see images). During lowering front foot swapped and valve supports moved slightly to give more clearance |
Thu Sep 16 15:24:29 2021, JM RSS, CARME vented + thermocouple feedthrough  
|
Chamber has been vented back to atmosphere.
Motor was able to be pulled back to insert bloacking pin once at atmosphere.
Thermocouple feedthrough constructed with 4 thermocuples attached. Internal thermocouples each ~200mm in length with external thermocouples each |
Sat Sep 11 16:01:44 2021, CB RSS, Preparations for shutdown 
|
Found CARME pressure at 2E-7 mbar
Raspberry pi took pictures until 4 am and
|
Fri Sep 10 18:09:14 2021, CB RSS ML, Leak test + baking system test
|
Leak tested CARME via He leak tester + He
bottle. No leaks could be found. Some
indication of potential leak close to
|
Fri Sep 10 10:50:55 2021, CB RSS ML, Pressure after overnight pump down
|
Pressure found in 10-7 mbar range.
Decided to leak test anyway for safety.
|
Thu Sep 9 13:01:07 2021, CB RSS + OG, All feedthrough flanges mounted and motor rotated   
|
Moved cables that touched neg pumps. See
photos. Please bear in mind perspective.
Note avoiding touching chamber
|
Wed Sep 8 17:03:07 2021, CB RSS + OG NB, Six feedthrough flanges mounted 23x
|
Continued to mount flanges as per previous ELOG entry.
Peter also remarked that the wires look a bit loose inside the holes, although this is how they were during
dirty tests in Edinburgh.
|
Wed Sep 8 10:52:54 2021, CB RSS + OG, First feedthrough flange mounted    
|
Assembled feedthrough flange with re-cut
SS support bracket. M3 vented on the
sides, M3x30 partly threaded on top. Top
|
Tue Sep 7 14:10:02 2021, CB RSS + OG, Strain relief SS support re-drilled
|
Re-drilled SS supports in order to fit M3 screws.
Used hand tool cleaned with alchool for 6 of the 8.
|
Tue Sep 7 12:40:43 2021, CB ML + RH, CARME survey preparation
|
Rudi and survey group representative came
to CARME.
|
Tue Sep 7 11:37:05 2021, CB RSS + OG, Update on strain relief screw issues
|
Tested every strain relief. M3 screws get stuck at different points in each hole. Only one good hole out of 16
(2x8).
They were tested in Edinburgh - unclear if this is a result of baking at high temperatures, or bad screws, or
|
Mon Sep 6 14:13:17 2021, CB ML, Motors mounted - first attempt    
|
Mounted both motors on CARME. Started
with outside motor.
|
Sat Sep 4 15:54:50 2021, CB RSS, Motor mounting preparation 
|
Prepared the motors to be mounted and
found all components required. No issues.
May have to partly dismount again to fix
|
Fri Sep 3 15:55:00 2021, CB RSS, Issues with cable clamps 
|
Attempted to mount cable clamps for strain
relief on inner part of Allectra
feedthroughs.
|
Fri Sep 3 14:14:40 2021, TD, Leybold IE514 manual & calibration data 
|
|
Fri Sep 3 08:14:51 2021, CB RSS, Issues foreseeable splitting CARME 7x
|
In order to install the detector supports
and eventually install the detectors
themselves CARME must be split and
|
Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down 
|
03.09.2021 09:00 5.27E-7 mbar
03.09.2021 13:00 4.08E-7 mbar
|
Thu Sep 2 21:04:26 2021, CB RSS ML + DR OG, Gate valves mounted + pump down 6x
|
Mounted both gate valves and support. Gate
valves could not be installed one bolt
rotated from 90 degrees as per drawings
|
Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING
|
Connected CARME to the CRYRING via tube
plus bellows. See attach.
|
Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING    
|
Lifted CARME with Al support on the
CRYRING. No issues during transportation.
|
Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09 
|
Mounted additional cross member for motor
support. See attach 1
|
Tue Aug 31 18:56:35 2021, CB, CARME status 9x
|
(ELOG does not allow more pictures to be added to previous entry) |
Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand    
|
Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot
due to alignment conflict. Three bolts were mounted per foot instead.
|
Tue Aug 31 11:55:11 2021, CB RSS, Last preparations for CARME lift 
|
Found strut bolts in the bag with
spherical washers. Mounted the struts and
the washers. See attach 1.
|
Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
|
(30 August 2021)
The current state of YR09 is as per attach 1. CCC has been removed, but additional pumps and gauges remain. Some
|
Wed Aug 25 07:02:41 2021, RSS TD, 25-31 August 19x
|
Pirani IE514
mbar mbar
25/8/21 08:00 0.0030 1.86e-8
----------------------------------------------------
26/8/21 09:00 0.0030 1.77e-8
---------------------------------------------------- |
Wed Aug 18 11:58:49 2021, NTD RSS, Misc fittings and fasteners plus gasket inventory 22x
|
Attachments 1-3 fasteners, fittings found amongst earlier shipments. I assume that the STFC DL cleaned items are for the internal detector mount assembly.
|
Wed Aug 18 07:07:26 2021, RSS TD, 18-24 August 25x
|
Pirani IE514
mbar mbar
18/8/21 08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032 3.72e-8
-------------------------------------------------------------
19/8/21 08:00 0.0032 3.38e-8 |
Fri Aug 13 07:28:37 2021, RSS TD, Friday 13-17 August 23x
|
Pirani IE514
mbar mbar
|
Thu Aug 12 09:16:42 2021, TD RSS, Thursday 12 August 13x
|
Attachment 1 - IE414/514 feedthrough wiring diagram
|
Wed Aug 11 12:30:40 2021, TD RSS, Wednesday 11 August 8x
|
Attachments 1 & 2 - 2x SAES D-2000 re-fitted to side ports
all 4x SAES D-2000 now re-fitted to chamber
|
Tue Aug 10 12:22:56 2021, TD RSS, Tuesday 10 August  
|
Attachments 1-3 - 2 of 4 SAES D2000 installed at same ports used for STFC DL XHV tests |
Mon Aug 9 12:36:00 2021, TD, RSS, ABD, Monday 9 August 7x
|
Attachments 1-5 - CARME shipment in CRYRING hall
XHV chambers nearest to YR09
|
Mon Dec 7 14:29:12 2020, JM, CARME packing up  
|
|
Fri Dec 4 16:49:36 2020, TD, Friday 4 December 7x
|
|
Wed Nov 25 10:39:37 2020, TD, Wednesday 25 November 7x
|
10.39
|
Tue Nov 24 12:24:01 2020, JM, RGA scans
|
RGA laptop passcode: tw%11&STA-
RGA scans set up and plotting data as of 11:44
RGA is set to the multiplier mode (4.44e-8mbar) with an accuracy setting of 8, these are for the most sensitive scans. RGA is set to scan masses |
Tue Nov 10 12:25:29 2020, JM, Cable harnesses   
|
The length of the wire needed was estimated with the aid of a scale image of the detectors in the CARME chamber and foam model pieces. Wire length estimated
by simply cutting wire so that it 'fits' the scale model and by taking coordinates of the end points of the longest sections of wire needed on
the model and calculating a bezier curve to estimate wire length. Bezier curve calculated by inputting the endpoints of the wire and control points such |
Thu Oct 29 08:02:29 2020, CB, JM (remotely), CARME pressure  
|
Attached is the temperature plot for bakeout period including tags for NEG activation etc.
28 October -> 27 November
|
Wed Oct 28 10:41:57 2020, TD, Wednesday 28 October 6x
|
10.32
|
Mon Oct 26 10:35:05 2020, JM, CB(remotely), Cooling   
|
10:10 Pressure on the chamber = 3.1e-8mbar. RE-72 temperatures are ~120-125C with set limits at 80C. D2000 temperatures are ~370C. D2000's reduced
from 60W to 30W and all UHV 1400s reduced to 50W each to cool both the chamber and the D2000s so that ion pumps can be activated.
10:38 Pressure on the chamber = 1.7e-9mbar. Re-72 temperatures begining to fall and are currently ~117-122C. D2000 temperatures are ~290C. |
Thu Oct 22 22:15:00 2020, CB (remotely), Cooling down after first NEG activation 7x
|
Thu 22 October
22:15 Temperatures stables, slowly decreasing.
|
Thu Oct 22 10:39:40 2020, TD, Thursday 22 October 19x
|
10.40
|
Mon Oct 19 13:57:52 2020, JM, Neg Activation 
|
Neg and Neg-Ion pumps have been connected up to the control modules. Controller on the right is connected to the D-2000s. Middle controller is connected
to the wall section negs (1x2negs in series and 1x3negs in series) and the moving detector negs (2x2 negs in series). Left controller is connected
to the intermediate section negs (2x2 negs in series). Must connect IN/OUT interface on the back of the controller or the alarm for an open circuit is |
Mon Oct 12 10:49:36 2020, JM, First Bakeout of CARME with pumps (cont)
|
12 October
10:00 Bakeout temperatures stable. Pressure on the backing line is 3e-7mbar which is the lowest we have achieved on the backing line so far.
Vessel pressure can't be measured at the moment as temperature exceeds the max operational temperature of 80C. |
Mon Oct 5 08:21:40 2020, CB (remotely), JM, First bake of CARME with pumps (cont.) 6x
|
5 OCTOBER
08:21 Temperatures stable overnight. See attached. Baking continues.
|
Wed Sep 30 08:10:36 2020, CB (remotely), First bake of CARME with pumps 19x
|
(NOTE: Raspberry Pi internal clock appears to be on GMT, rather than GMT+1 due to daylight saving.)
Baking started on Mon 28 Sep. Due to WiFi connection authorisation expiring, no remote access was possible until
|
Mon Sep 28 13:04:27 2020, JM, Baking 
|
I have (fingers crossed) got the baking stepping up nicely now. I have used some of the outer shell to act as a shield and to direct airflow towards
the front and back of the baking volume. I also moved the RE-72 thermocouples to a higher temperature region and replaced the broken thermocouples. The
program is on automatic mode and has currently stepped up to 40C with the max diff reduced to ~4C. |
Sat Sep 26 09:31:46 2020, JM, CB (both remotely), Baking over weekend   
|
Sat 26 Sep
09:15 Baking started automatic mode
13:30 Baking continues, heating is slower than expected due to high chamber bottom temperatures |
Fri Sep 25 12:58:33 2020, JM, Friday 25/09/20
|
10:00 Vessel P = 3.99e-8 mbar, RGA P = 1.4e-6 mbar
10:54 Vessel P = 3.89e-8 mbar, RGA P = 1.4e-6 mbar
Vessel continues to pump down. Baking Jacket fully installed and testing of baking begins before leaving on automatic mode for the week. Some |
Thu Sep 24 10:04:58 2020, JM, TD, Thursday 24 September 
|
Following overnight pumping by Leybold turbo pump
|
Wed Sep 23 13:34:32 2020, JM, TD, Wednesday 23 September    
|
Connected Leybold Ionivac IE514 to Leybold Combivac CM52 Vacuum Gauge Controller
|
Wed Sep 23 13:34:04 2020, JM, Tuesday 22 September
|
Turbo-pump Issue approximately 13:00 22/9/20.
While moving the baking octagon into position, the power connector became disconnected from the turbo pump. The pump controller provided the
warnings of connector failure and high pump load (probably due to it reading the frequency of the pump as 0 Hz when disconnected and thinking this was |
Mon Sep 21 09:51:57 2020, JM, CARME Status
|
Cooling of baking volume finished over the weekend, attached are some plots of the bakeout test. Bakeout2.png is the thermocouple profile for the entire
period over the week. The heating in the first seven hours followed a nice linear rise of ~5C/hour, in the 7-40 hour period the heating rate slowed due
to an issue with our octagon average limiting the increase in the temperature. The period from 40-65 hours was due to the picologger heating up to unacceptbly |
Fri Sep 18 10:28:57 2020, JM, CB(remotely), Baking status
|
10:28
Reducing temperature in steps. System cooling down. See attached.
|
Thu Sep 17 10:13:43 2020, JM, CB(remotely), Bakeout cooling and pumping of chamber 
|
The Chamber has continued to pump overnight and we have reached a pressure of 3.3e-6 mbar as of 10:15. Power cable for the hot cathode gauge was found. Gauge
did not give a reading so pin connections were checked, all is okay so it may be thepressure is still too high within the chamber, gauge was thus turned
off. I have attached the RGA from this morning which has increased accuracy so has been cleared up for most of the noise from yesterday. I have begun |
Wed Sep 16 17:46:36 2020, JM, Pumping of Chamber
|
A pump cart and leak cart have been connected to the chamber via the top turbo at the back of the chamber. An air line has also been connected to the
valve to open/close it. The pirani gaige has also been replaced by a blank flange, a gauge on the pump cart can measure the pressure in its range. The
turbo fan and controller were set up and pumping was started after lunch. |
Wed Sep 16 08:52:03 2020, CB (remotely), Baking status 16-17 September    
|
16 September
08:50
|
Tue Sep 15 08:39:26 2020, CB (remotely), JM, Baking and Chamber status    
|
Tuesday 15 September
08:40
|
Mon Sep 14 12:07:40 2020, JM, CB (remotely), Baking status   
|
Mon 14 Sep 09:50
Jordan moved the TC08 picolog 2 away from the chamber and built a makeshit heatshield.
|
Sun Sep 13 08:06:25 2020, CB (remotely), Baking over the weekend -2 
|
Sun 13 Sep 08:06
Baking reached 93 C yesterday afternoon at 16:18 and paused as a result of a percieved temperature gradient in
|
Sat Sep 12 08:38:52 2020, CB (remotely), Baking over the weekend 
|
Saturday 12 Sep 08:43
Remotely checked status of baking. See attached.
|
Thu Sep 10 11:34:30 2020, TD, JM, Thursday 10 September  
|
All neg feed-throughs have now been fully installed, with ground tags
and power wires crimped and attached to the correct pins. Feed-throughs
are installed as seen in Image
|
Wed Sep 9 21:01:48 2020, JM, Neg Feedthroughs
|
4/6 of the neg feedthroughs installed. Continuity between the power pins, ground pin and the chamber has been checked, we observe 5-10 ohms between
the power pins similar to previous checks on the heaters. Also attached are the crimps for the ground tag and feedthrough connector pins. |
Fri Sep 4 15:48:25 2020, JM, Bakeout test completed 
|
Bakeout test completed. Maximum temperature reached within baking volume was 120 degrees, with baking stopped by the program due to detection of
negative temperature gradients. Negative temperature gradients due to a couple of thermocouples becoming unsecured and moving to cooler part of baking
volume. Attached documents show temperatures of thermocouples. The colour of plots are linked (all of chamber temperatures are blue etc). Temperature |
Wed Sep 2 17:01:49 2020, JM, Bakeout started and valve installation
|
Initial bakeout started which will run until friday, temperature had reached 44 degrees when I left the lab.
The bottom valve has now been installed on the main chamber |
Wed Aug 19 16:44:39 2020, JM, Neg Installs
|
Internal neg installs completed and electrically checked. |
Tue Aug 18 17:35:20 2020, TD, SAES UHV1400 pin assignment    
|
Using a digital multimeter confirmed continuity for SAES-supplied
power cable (Amphenol (circular) 6-pin plug to Han 05 plug) for
the following pins
|
Tue Aug 18 11:26:26 2020, JM, Week ending Friday 14/08/20
|
Week ending friday 14/08/20
CARME chamber securely mounted upon aluminium frame and support skis. Neg-ion pumps and right angled flanges installed. Neg pumps installed in
the wall detector section of the chamber. Neg pumps continuity checked and are electically isolated from the chamber. |
Mon Aug 17 08:16:16 2020, TD, CARME Elog
|
Test |