38
|
Fri Apr 13 14:56:11 2018 |
Thomas Chillery, Lucio Gialanella | 7Be 5.0MeV Beam test on CH2 target IV with central S2 and downstream S2 channels 0-7 | Date: 07/04/2018
FC - 4 = 410 - 260 = 150 pA
We moved the target ladder to position |
|
37
|
Fri Apr 13 14:42:31 2018 |
Thomas Chillery, Lucio Gialanella | 7Be 5.0MeV Beam test on CH2 target III with central S2 and downstream S2 channels 0-7 | Date: 07/04/2018
To run the measurement we:
Opened the central iris |
|
36
|
Fri Apr 13 14:31:59 2018 |
Thomas Chillery, Lucio Gialanella | Setting up for 7Be 5.0MeV beam | Date: 07/04/2018
We changed to cathod 23 - 7Be
For beam tuning we: |
|
35
|
Fri Apr 13 13:59:18 2018 |
Thomas Chillery, Lucio Gialanella | 7Li 5.0MeV Beam test with Central S2 and Downstream S2 first 8 channels | Date: 07/04/2018
At 12:10 we started the DAQ for
5.0 MeV 7Li in 2+ charge state bombarding |
   |
34
|
Fri Apr 13 08:24:47 2018 |
Thomas Chillery, Lucio Gialanella | Attempting to add downstream S2 to DAQ setup and fixing problems during setup | Date: 07/04/2018 (Last day of April shift)
9:55 pressures read: CHUP = 1.3e-5
mBar, CHDW = 3.5 e-5 mBar |
|
33
|
Thu Apr 12 14:14:09 2018 |
Thomas Chillery, Raffaele Buompane | 7Be 5.0MeV Beam test with central S2 | Date: 06/04/2018
Before starting this beam test
we lowered the channel thresholds on ADC |
  |
32
|
Thu Apr 12 13:12:00 2018 |
Thomas Chillery, Raffaele Buompane | 7Li 5.0MeV Beam tests with Central S2 | Date: 06/04/2018 (after 16:40)
We powered the preamps for the
two S2 detectors and the diode. |
|
31
|
Thu Apr 12 12:47:04 2018 |
Thomas Chillery, Raffaele Buompane | Central S2 Alpha Calibration | Date: 06/04/2018
We connected the analogue signals
of RAL X, XII, XIII, and "R" to |
|
30
|
Fri Apr 6 14:54:12 2018 |
Thomas Chillery, Raffaele Buomparte | Tests - Attempting to solve noise issues | Today we started by mounting the central
and downstream preamp box lids.
The pumps were left running overnight, |
|
29
|
Fri Apr 6 13:33:27 2018 |
Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes | Tests - Attempting to solve noise issues | On 05/04/18, after eLog #28
After the alpha calibrationrun
Raffaele arrived and started beam tuning |
|
28
|
Fri Apr 6 12:07:52 2018 |
Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes | Tests - Attempting to solve noise issues, 15 min alpha calibration | On 05/04/18:
At 9:00 the pressures read ~10mBar
inside the chamber (static vacuum). We began |
|
27
|
Fri Apr 6 11:39:10 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Tests - Pumping down chamber and starting electronics tests | On 04/04/18:
We mounted S2 2323-18 (496um) in
the downstream position with 12um mylar |
   |
26
|
Tue Apr 3 18:16:26 2018 |
Thomas Chillery, Lizeth Morales, Raffaele Buompane, Lucio Gialanella | Tests - Unpacking and Mounting Chamber Parts | This morning I unpacked the chamber parts.
I mounted the downstream and central
lids with the iris arm hooks to double check |
  |
25
|
Tue Mar 27 16:36:01 2018 |
Thomas Chillery, Peter Black | Tests - Modifying Chamber Parts in Edinburgh | Between 7th to 21st March modifications
were made to the top of the CIRCE target
chamber. |
11x |
24
|
Wed Mar 7 16:56:52 2018 |
Thomas Chillery, Peter Black | Tests - Modifying Chamber Parts in Edinburgh | Today we began examining and modifying
parts of the chamber shipped from CIRCE to
Edinburgh. |
|
23
|
Tue Mar 6 15:55:04 2018 |
Thomas Chillery, Raffaele Buompane | End of February 2018 Shifts | On 23/02/2018:
At the end of the February 2018
shifts the detectors bias settings were: |
|
22
|
Tue Mar 6 15:41:53 2018 |
Thomas Chillery, Raffaele Buompane | Pin Diode Pulser Walkthrough at End of February Shifts | On 23/02/2018:
After the alpha source calibration
of the S2 (See eLog entry #21) we decided |
|
21
|
Tue Mar 6 15:29:55 2018 |
Thomas Chillery, Raffaele Buompane | Collecting S2 Alpha Calibration Spectra at End of February Test Shifts | On 23/02/2018:
We moved the target ladder to position
7, 5.019mm, with the alpha source facing |
 |
20
|
Sun Feb 25 15:59:38 2018 |
Thomas Chillery, Lizeth Morales, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement - 3.45MeV 7Li on CH2 Target III | On 23/02/2018 at 13:49 we started the DAQ
in list mode.
After starting the DAQ we sent |
  |
19
|
Sun Feb 25 15:14:54 2018 |
Thomas Chillery, Lizeth Morales, David Rapagnani | Setup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Morning of 23rd | On the morning of 23/02/18 we aimed to
complete beam tuning of 7Li at 3.45MeV.
At 8:43 CHUP = 7.2e-6mBar, CHDW |
|