78
|
Tue Feb 18 14:39:26 2020 |
Thomas Chillery | Target Thicknesses | Excel spreadsheet showing CH2 and natC
target thicknesses attached |
|
77
|
Wed Sep 18 14:01:13 2019 |
Thomas Chillery | Logbook Spreadsheet | See attached for the logbook |
|
76
|
Tue Dec 4 11:23:29 2018 |
Thomas Chillery | Chamber Dimensions | See attached pictures for measurements
of the 7Be(p,p) chamber dimensions.
The target ladder center - Far |
  |
75
|
Tue Dec 4 09:40:31 2018 |
Thomas Chillery | Preliminary measurements of target activation using geiger counter | On 29/11/2018 at 17:40 a rough measurement
of the irradiated target activity was performed
using a geiger counter. |
|
74
|
Tue Dec 4 09:38:18 2018 |
Thomas Chillery | 181122 Electronics Map | See attached for S2 electronics map, following
channels from S2 outputs to ADC inputs
For the 19/11/2018 - 29/11/2018 |
 |
73
|
Mon Dec 3 19:04:20 2018 |
Thomas Chillery, Raffaele Buompane | End of beamtime - Items to be shipped back to Edinburgh | To be shipped back to Edinburgh for repair:
Item |
|
72
|
Mon Dec 3 18:55:31 2018 |
Thomas Chillery, Raffaele Buompane | End of beamtime - Cleanup | On 29/11/2018:
Dismounted S2 2323-18 (496um),
12um mylar, diode, and diodes 0.9um mylar. |
8x |
71
|
Mon Dec 3 18:45:17 2018 |
Thomas Chillery, Raffaele Buompane | End of beamtime - Module settings | Diode Ortec 571 Amplifier Settings:
Fine gain: 10 (0.5 ->1.5)
Course
gain: 50
Shaping time: 0.5us
BLR |
|
70
|
Mon Dec 3 18:30:53 2018 |
Thomas Chillery, Raffaele Buompane | Calibration with alpha source - 12um mylar on Far S2 | On 28/11/2018:
Mounted 12um mylar in front of
far S2 - see attached pictures 1 and 2 |
  |
69
|
Mon Dec 3 18:15:42 2018 |
Thomas Chillery, Raffaele Buompane | Calibration with alpha source - no mylar on Far S2 | On 28/11/2018:
At 13:35: Far S2 bias = -130.0V,
leak I = 1.55uA. Diode bias = -70.1V, leak |
 |
68
|
Mon Dec 3 17:59:48 2018 |
Thomas Chillery, Raffaele Buompane | Calibration with alpha source - 0.9um mylar on Far S2 | On 28/11/2018:
After pulser walkthrough (see eLog
entry #67) |
    |
67
|
Mon Dec 3 17:51:46 2018 |
Thomas Chillery, Raffaele Buompane | Pulser Walkthrough | On 28/11/2018:
Performed pulser walkthrough, Run
# 181128090835 |
|
66
|
Mon Dec 3 17:40:51 2018 |
Thomas Chillery, Carlo Bruno, Raffaele Buompane | Lab background | On 27/11/2018:
Run # 181127200709
Run time: 46329s
Pulser |
 |
65
|
Mon Dec 3 17:34:38 2018 |
Thomas Chillery, Carlo Bruno, Raffaele Buompane | 6Li(p,p): Test measurement of 1.5MeV 6Li 1+ on thin CH2 50 | On 27/11/2018:
After tuning beam (see previous
eLog entry # 64) |
 |
64
|
Mon Dec 3 17:02:48 2018 |
Thomas Chillery, Carlo Bruno, Lizeth Morales, Guiseppe Porzio, Raffaele Buompane | 6Li(p,p): Tuning 1.5MeV 6Li 1+ beam | On 27/11/2018:
Started tuning for 1.5MeV 6Li 1+.
Set ladder to position #2 - Blank 10mm. Far |
 |
63
|
Mon Dec 3 16:47:40 2018 |
Thomas Chillery, Carlo Bruno, Lizeth Morales | Finishing 3.0MeV 7Be measurements with CH2 XIX and natC III | On 27/11/2018:
At 8:40 Far S2 bias = -130.0V,
leak I = 1.74uA. Diode bias = -70.1V, leak |
    |
62
|
Mon Dec 3 16:39:42 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane | 3.0MeV 7Be on CH2 XIX | On 26/11/2018:
Tuned beam for 3.0MeV 7Be 2+. Far
S2 iris was closed during tuning. |
 |
61
|
Mon Dec 3 16:17:29 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, David Rapagni | 3.0MeV 7Li on CH2 XIX and natC III | On 26/11/2018, after changing the far S2
mylar foil (see previous eLog entry #60):
Checked pulser frequency on oscilloscope: |
  |
60
|
Mon Dec 3 15:51:11 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, David Rapagni | Changing far S2 protective mylar foil, preparing for 3.0MeV 7Li and 7Be | On 26/11/2018, after 6.0MeV 7Be and 7Li
beam measurements:
At 11:15: |
|
59
|
Mon Dec 3 12:57:54 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, David Rapagni | Finishing 6.0MeV 7Be 2+ and 7Li 2+ beam runs | On 26/11/2018:
The accelerator and chamber setup
were still operating after the overnight |
 |
58
|
Mon Dec 3 12:32:54 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Raffaele Buompane | 6.0MeV 7Be on CH2 XVIII | On 25/11/2018:
The beam was tuned for 6.0MeV 7Be
2+ |
   |
57
|
Mon Dec 3 11:54:55 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane | 7Li 6.0 MeV on CH2 XVI and XVIII, and on natC III | On 25/11/2018:
At 8:45 the pressures read (mBar):
TPU1 = 1.0e-6
TPU2 |
 |
56
|
Mon Dec 3 11:28:53 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Antonino d'Leva | 7Be 4.0MeV on CH2 XVI and natC III | On 24/11/2018:
After the short test with 4.0MeV
7Li (see eLog #55) the beam was tuned for |
   |
55
|
Mon Nov 26 17:13:45 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella | Preparing chamber for 4MeV 7Be 2+ beam | On 24/11/2018:
At 8:35 the chamber pressures read
(mBar): |
 |
54
|
Mon Nov 26 17:10:13 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane | 7Li 4.0 MeV beam on natC target 3 | On 23/11/2018:
After the runs with 7Li on CH2
15, we moved the target ladder to position |
|
53
|
Sat Nov 24 16:39:22 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane | 7Li 4.0 MeV beam on CH2 target 15 | On 23/11/2018:
Tuned beam for 4.0 MeV 7Li, charge
state 2+ |
|
52
|
Sat Nov 24 16:29:10 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane | Preparing setup for 7Li beam | On 23/11/2018:
10:15 started pumping down chamber
with Ecodry 2 |
|
51
|
Sat Nov 24 15:07:00 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Tom Davinson | Searching for causes of noise | On 22/11/2018 in the afternoon:
We increased the ADC thresholds
to 40 (previously 8). |
|
50
|
Sat Nov 24 15:05:40 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales | FAIR DAQ | The FAIR DAQ IP address: 192.168.1.90
The data is saved in /Local_Parts/Part0DE/
After each run we should copy the |
|
49
|
Thu Nov 22 11:53:08 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales | DAQ tests with alpha source | The target ladder is set for position 7
- the double alpha source.
Looking at the FAIR DAQ, for the |
 |
48
|
Thu Nov 22 11:34:07 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales | Continuing Electronic Chain Tests | This morning at 8:35am the pressures read
(in mBar):
TPU1 = 2.0e-6
TPU2 |
|
47
|
Wed Nov 21 09:34:26 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno | Setting up chamber both for tests under vacuum and physics measurement | Today we mounted the far aperture used
to control the far iris. No problems were
encountered with this. |
 |
46
|
Wed Nov 21 09:28:06 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales | Problem encountered with near iris arm | On 20/11/2018:
After the electronics tests in
air (see eLog entry #44) we started to setup |
|
45
|
Wed Nov 21 09:09:41 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, David Rapagni | Mounting Detectors / Continuing Electronic Chain Tests | On 20/11/2018:
At 9:00 we walked into the lab,
David R reported he found all the pumps OFF. |
|
44
|
Wed Nov 21 08:53:06 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales | Testing Electronic Chain - No Detectors | On 19/11/2018:
During the vacuum test - see eLog
entry #43 we performed noise tests on the |
|
43
|
Wed Nov 21 08:45:03 2018 |
Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Carlo Bruno | Testing Chamber Vacuum | On 19/11/2018:
We mounted the following in the
chamber: |
|
42
|
Wed Nov 21 08:37:24 2018 |
Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane | Upstream Collimator | On 19/11/2018:
During the target ladder calibration
(see elog entry #41) we also replaced the |
|
41
|
Wed Nov 21 08:18:14 2018 |
Thomas Chillery, Marialuisa Aliotta | Checking Target Ladder Calibration | On 19/11/2018:
There were three CH2 targets already
mounted on the target frame, CH2 III, IV, |
  |
40
|
Wed Jul 11 15:55:35 2018 |
Thomas Chillery | Electronics Channel Map | See attached for Electronics Channel Map
spreadsheet.
This is valid for the February |
|
39
|
Fri Apr 13 15:08:04 2018 |
Thomas Chillery, Lucio Gialanella | End of shift - lab cleanup | Date: 07/04/2018
Began dismounting detectors:
All detectors powered off
Closed |
|
38
|
Fri Apr 13 14:56:11 2018 |
Thomas Chillery, Lucio Gialanella | 7Be 5.0MeV Beam test on CH2 target IV with central S2 and downstream S2 channels 0-7 | Date: 07/04/2018
FC - 4 = 410 - 260 = 150 pA
We moved the target ladder to position |
|
37
|
Fri Apr 13 14:42:31 2018 |
Thomas Chillery, Lucio Gialanella | 7Be 5.0MeV Beam test on CH2 target III with central S2 and downstream S2 channels 0-7 | Date: 07/04/2018
To run the measurement we:
Opened the central iris |
|
36
|
Fri Apr 13 14:31:59 2018 |
Thomas Chillery, Lucio Gialanella | Setting up for 7Be 5.0MeV beam | Date: 07/04/2018
We changed to cathod 23 - 7Be
For beam tuning we: |
|
35
|
Fri Apr 13 13:59:18 2018 |
Thomas Chillery, Lucio Gialanella | 7Li 5.0MeV Beam test with Central S2 and Downstream S2 first 8 channels | Date: 07/04/2018
At 12:10 we started the DAQ for
5.0 MeV 7Li in 2+ charge state bombarding |
   |
34
|
Fri Apr 13 08:24:47 2018 |
Thomas Chillery, Lucio Gialanella | Attempting to add downstream S2 to DAQ setup and fixing problems during setup | Date: 07/04/2018 (Last day of April shift)
9:55 pressures read: CHUP = 1.3e-5
mBar, CHDW = 3.5 e-5 mBar |
|
33
|
Thu Apr 12 14:14:09 2018 |
Thomas Chillery, Raffaele Buompane | 7Be 5.0MeV Beam test with central S2 | Date: 06/04/2018
Before starting this beam test
we lowered the channel thresholds on ADC |
  |
32
|
Thu Apr 12 13:12:00 2018 |
Thomas Chillery, Raffaele Buompane | 7Li 5.0MeV Beam tests with Central S2 | Date: 06/04/2018 (after 16:40)
We powered the preamps for the
two S2 detectors and the diode. |
|
31
|
Thu Apr 12 12:47:04 2018 |
Thomas Chillery, Raffaele Buompane | Central S2 Alpha Calibration | Date: 06/04/2018
We connected the analogue signals
of RAL X, XII, XIII, and "R" to |
|
30
|
Fri Apr 6 14:54:12 2018 |
Thomas Chillery, Raffaele Buomparte | Tests - Attempting to solve noise issues | Today we started by mounting the central
and downstream preamp box lids.
The pumps were left running overnight, |
|
29
|
Fri Apr 6 13:33:27 2018 |
Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes | Tests - Attempting to solve noise issues | On 05/04/18, after eLog #28
After the alpha calibrationrun
Raffaele arrived and started beam tuning |
|
28
|
Fri Apr 6 12:07:52 2018 |
Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes | Tests - Attempting to solve noise issues, 15 min alpha calibration | On 05/04/18:
At 9:00 the pressures read ~10mBar
inside the chamber (static vacuum). We began |
|
27
|
Fri Apr 6 11:39:10 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Tests - Pumping down chamber and starting electronics tests | On 04/04/18:
We mounted S2 2323-18 (496um) in
the downstream position with 12um mylar |
   |
26
|
Tue Apr 3 18:16:26 2018 |
Thomas Chillery, Lizeth Morales, Raffaele Buompane, Lucio Gialanella | Tests - Unpacking and Mounting Chamber Parts | This morning I unpacked the chamber parts.
I mounted the downstream and central
lids with the iris arm hooks to double check |
  |
25
|
Tue Mar 27 16:36:01 2018 |
Thomas Chillery, Peter Black | Tests - Modifying Chamber Parts in Edinburgh | Between 7th to 21st March modifications
were made to the top of the CIRCE target
chamber. |
11x |
24
|
Wed Mar 7 16:56:52 2018 |
Thomas Chillery, Peter Black | Tests - Modifying Chamber Parts in Edinburgh | Today we began examining and modifying
parts of the chamber shipped from CIRCE to
Edinburgh. |
|
23
|
Tue Mar 6 15:55:04 2018 |
Thomas Chillery, Raffaele Buompane | End of February 2018 Shifts | On 23/02/2018:
At the end of the February 2018
shifts the detectors bias settings were: |
|
22
|
Tue Mar 6 15:41:53 2018 |
Thomas Chillery, Raffaele Buompane | Pin Diode Pulser Walkthrough at End of February Shifts | On 23/02/2018:
After the alpha source calibration
of the S2 (See eLog entry #21) we decided |
|
21
|
Tue Mar 6 15:29:55 2018 |
Thomas Chillery, Raffaele Buompane | Collecting S2 Alpha Calibration Spectra at End of February Test Shifts | On 23/02/2018:
We moved the target ladder to position
7, 5.019mm, with the alpha source facing |
 |
20
|
Sun Feb 25 15:59:38 2018 |
Thomas Chillery, Lizeth Morales, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement - 3.45MeV 7Li on CH2 Target III | On 23/02/2018 at 13:49 we started the DAQ
in list mode.
After starting the DAQ we sent |
  |
19
|
Sun Feb 25 15:14:54 2018 |
Thomas Chillery, Lizeth Morales, David Rapagnani | Setup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Morning of 23rd | On the morning of 23/02/18 we aimed to
complete beam tuning of 7Li at 3.45MeV.
At 8:43 CHUP = 7.2e-6mBar, CHDW |
|
18
|
Fri Feb 23 13:15:05 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani | Setup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Night of 22nd | Checking SRIM 3.5 MeV 7Li is stopped in
9.06um mylar or 10.09 um CH2.
After the long run at 3.0MeV on |
|
17
|
Thu Feb 22 18:04:12 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement - 3.0MeV 7Li on CH2 Target VII | Yesterday (21st) night we saw this low
channel, high rate (1500Hz) noise on the
diode spectrum - see eLog entry #15. |
    |
16
|
Thu Feb 22 14:55:09 2018 |
Thomas Chillery | ADC6 Settings | DAQ Settings for ADC6 settings attached.
ADC 6 has been used for the pin diode during
the week starting 19/02/2018 |
    |
15
|
Thu Feb 22 10:40:49 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement / Test - 3.0MeV 7Li on CH2 Target VII | On 21/02/2018 after beam tuning and pumping
down at 18:07 the pressures read Up = 1.2e-5mBar,
Down = 3.2e-5mBar. We were happy to power |
  |
14
|
Thu Feb 22 07:58:48 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Setup - Beam Tuning and Prepare Chamber for Measurement at 3.0MeV 7Li | On 21/02/2018 we reattempted the beam tuning.
We expected this to be easier now the rogue
mylar is removed from the beamline. |
|
13
|
Wed Feb 21 10:46:22 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani | Setup - Pulser Settings and 20/02/2018 Pulser Walkthrough | The PB-5 Pulse Generator settings are as
follows:
Fall Time = 100us |
|
12
|
Tue Feb 20 17:03:08 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani | Setup - Beam Tuning | The pumps were left on overnight, in the
morning at 8:25 the pressure reads:
Up = 1.5e-5 mBar and Down = 4.0e-5 |
  |
11
|
Tue Feb 20 16:57:49 2018 |
Thomas Chillery | Screenshots - ADC 2 and ADC 4 settings, and example pulser walkthrough | |
11x |
10
|
Tue Feb 20 09:19:19 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani | Setup - Testing Chamber Vacuum and Mounting Detectors and Alpha Source | (Note: Tom Davinson is now in CIRCE until
the 21st)
On 19/02/2018 we performed the |
|
9
|
Sat Feb 17 13:00:51 2018 |
Thomas Chillery | Test - S2 Detector Bias | This morning whilst I was setting up the
ribbon cabling (see eLog entry #8) I was
considering collecting a voltage bias vs |
|
8
|
Sat Feb 17 12:35:25 2018 |
Thomas Chillery | Setup - Electronic Cabling | Between 9:00 to 12:30 this morning Filipo
was working on the weekend 14C measurements,
allowing me to work in the lab during this |
   |
7
|
Fri Feb 16 18:28:42 2018 |
Thomas Chillery, David Rapagnani | Setup - Testing Chamber Vacuum | By 16:40 I mounted all three chamber lids.
The central chamber lid includes
the diode detector mount, the iris, a vacuum |
|
6
|
Fri Feb 16 18:21:17 2018 |
Thomas Chillery | Iris arm problems | After lunch we were still having problems
with the aperture hook, see first attached
image highlighting the arm is located in |
 |
5
|
Fri Feb 16 18:10:34 2018 |
Thomas Chillery, David Rapagnani | Setup - Electronics Rack and Aperture Iris | This morning we moved the electronics rack
to within ~2.5m of the target chamber, leaving
room for the ribbons cables of ~5m length |
|
4
|
Thu Feb 15 20:45:27 2018 |
Thomas Chillery | Planning - Target Chamber CAD diagram | Find attached the latest CAD diagram of
the Target Chamber, drawn by Peter Black |
|
3
|
Thu Feb 15 17:45:07 2018 |
Thomas Chillery, Raffaele Buompane | Setup - Problem: Connecting the actuator arm to the iris aperture arm | After lunch we attempted to connect the
actuator arms to the iris arm used to change
the iris diameter. We need two iris diameters: |
  |
2
|
Thu Feb 15 17:34:28 2018 |
Thomas Chillery, Raffaele Buompane | Setup - Mounting Target Chamber Sections | This morning both myself and Raffaele mounted
the beamline section of the target chamber.
We also mounted the turbo located |
|
1
|
Tue Aug 1 12:26:13 2017 |
Thomas Chillery | 10th - 22nd July 2017 Summary Report | Attached is a report summarising work performed
on the electronics and target chamber in
CIRCE from the 10th to the 22nd July 2017. |
|