  78   Tue Feb 18 14:39:26 2020 Thomas ChilleryTarget ThicknessesExcel spreadsheet showing CH2 and natC
target thicknesses attached
 Target_List.xls 
  77   Wed Sep 18 14:01:13 2019 Thomas ChilleryLogbook SpreadsheetSee attached for the logbook  181123_Logbook.xls 
  76   Tue Dec 4 11:23:29 2018 Thomas ChilleryChamber DimensionsSee attached pictures for measurements
of the 7Be(p,p) chamber dimensions.

The target ladder center - Far
 IMG_3397.JPGIMG_3398.JPGIMG_3399.JPG 
  75   Tue Dec 4 09:40:31 2018 Thomas ChilleryPreliminary measurements of target activation using geiger counterOn 29/11/2018 at 17:40 a rough measurement
of the irradiated target activity was performed
using a geiger counter.
  
  74   Tue Dec 4 09:38:18 2018 Thomas Chillery181122 Electronics MapSee attached for S2 electronics map, following
channels from S2 outputs to ADC inputs

For the 19/11/2018 - 29/11/2018
 181122_Electronics_Channel_Map.ods181122_Electronics_Channel_Map.xls 
  73   Mon Dec 3 19:04:20 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - Items to be shipped back to EdinburghTo be shipped back to Edinburgh for repair:





Item
  
  72   Mon Dec 3 18:55:31 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - CleanupOn 29/11/2018:

Dismounted S2 2323-18 (496um),
12um mylar, diode, and diodes 0.9um mylar.
 8x 
  71   Mon Dec 3 18:45:17 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - Module settingsDiode Ortec 571 Amplifier Settings:


Fine gain: 10 (0.5 ->1.5)
Course
gain: 50
Shaping time: 0.5us
BLR
  
  70   Mon Dec 3 18:30:53 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - 12um mylar on Far S2On 28/11/2018:

Mounted 12um mylar in front of
far S2 - see attached pictures 1 and 2
 IMG_3356.JPGIMG_3363.JPG181128184505_ADC1_Ch9.png 
  69   Mon Dec 3 18:15:42 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - no mylar on Far S2On 28/11/2018:

At 13:35: Far S2 bias = -130.0V,
leak I = 1.55uA. Diode bias = -70.1V, leak
 IMG_3337.JPG182812_S2_Alpha_NoMylar.jpg 
  68   Mon Dec 3 17:59:48 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - 0.9um mylar on Far S2On 28/11/2018:

After pulser walkthrough (see eLog
entry #67)
 IMG_3305.JPGIMG_3307.JPGIMG_3315.JPGIMG_3313.JPG181128123940_ADC1_Ch9.png 
  67   Mon Dec 3 17:51:46 2018 Thomas Chillery, Raffaele BuompanePulser WalkthroughOn 28/11/2018:

Performed pulser walkthrough, Run
# 181128090835
 182811_PulserWalkthrough.jpg 
  66   Mon Dec 3 17:40:51 2018 Thomas Chillery, Carlo Bruno, Raffaele BuompaneLab backgroundOn 27/11/2018:

Run # 181127200709


Run time: 46329s
Pulser
 181127200709_ADC1_Ch9.png181127200709_ADC3_Ch16.png 
  65   Mon Dec 3 17:34:38 2018 Thomas Chillery, Carlo Bruno, Raffaele Buompane6Li(p,p): Test measurement of 1.5MeV 6Li 1+ on thin CH2 50On 27/11/2018:

After tuning beam (see previous
eLog entry # 64)
 181127193908_ADC1_Ch9.png181127193908_ADC3_Ch16.png 
  64   Mon Dec 3 17:02:48 2018 Thomas Chillery, Carlo Bruno, Lizeth Morales, Guiseppe Porzio, Raffaele Buompane6Li(p,p): Tuning 1.5MeV 6Li 1+ beamOn 27/11/2018:

Started tuning for 1.5MeV 6Li 1+.
Set ladder to position #2 - Blank 10mm. Far
 IMG_3285.JPGIMG_3292.JPG 
  63   Mon Dec 3 16:47:40 2018 Thomas Chillery, Carlo Bruno, Lizeth MoralesFinishing 3.0MeV 7Be measurements with CH2 XIX and natC IIIOn 27/11/2018:

At 8:40 Far S2 bias = -130.0V,
leak I = 1.74uA. Diode bias = -70.1V, leak
 181127085408_ADC1_Ch9.png181127085408_ADC3_Ch16.png181127090808_ADC1_24.png181127092128_ADC1_Ch9.png181127092128_ADC3_Ch16.png 
  62   Mon Dec 3 16:39:42 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane3.0MeV 7Be on CH2 XIXOn 26/11/2018:

Tuned beam for 3.0MeV 7Be 2+. Far
S2 iris was closed during tuning.
 181126192446_ADC1_Ch9.png181126192446_ADC3_Ch16.png 
  61   Mon Dec 3 16:17:29 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, David Rapagni3.0MeV 7Li on CH2 XIX and natC IIIOn 26/11/2018, after changing the far S2
mylar foil (see previous eLog entry #60):

Checked pulser frequency on oscilloscope:
 181126164509_ADC1_24.png181126183711_ADC1_Ch9.png181126183711_ADC3_Ch16.png 
  60   Mon Dec 3 15:51:11 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, David RapagniChanging far S2 protective mylar foil, preparing for 3.0MeV 7Li and 7BeOn 26/11/2018, after 6.0MeV 7Be and 7Li
beam measurements:

At 11:15:
 IMG_3273.JPG 
  59   Mon Dec 3 12:57:54 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, David RapagniFinishing 6.0MeV 7Be 2+ and 7Li 2+ beam runsOn 26/11/2018:

The accelerator and chamber setup
were still operating after the overnight
 181126105357_ADC1_Ch9.png181126105357_ADC3_Ch16.png 
  58   Mon Dec 3 12:32:54 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Raffaele Buompane6.0MeV 7Be on CH2 XVIIIOn 25/11/2018:

The beam was tuned for 6.0MeV 7Be
2+
 181125121226_ADC1_Ch9.png181125121226_ADC3_Ch16.png181125223800_ADC1_Ch9.png181125223800_ADC3_Ch16.png 
  57   Mon Dec 3 11:54:55 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 6.0 MeV on CH2 XVI and XVIII, and on natC IIIOn 25/11/2018:

At 8:45 the pressures read (mBar):


TPU1 = 1.0e-6
TPU2
 181125113734_ADC1_Ch9.png181125113734_ADC3_Ch16.png 
  56   Mon Dec 3 11:28:53 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Antonino d'Leva7Be 4.0MeV on CH2 XVI and natC IIIOn 24/11/2018:

After the short test with 4.0MeV
7Li (see eLog #55) the beam was tuned for
 181124120558_ADC1_Ch9.png181124120558_ADC3_Ch16.png181124182304_ADC1_Ch9.png181124182304_ADC3_Ch16.png 
  55   Mon Nov 26 17:13:45 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio GialanellaPreparing chamber for 4MeV 7Be 2+ beamOn 24/11/2018:

At 8:35 the chamber pressures read
(mBar):
 IMG_3231.JPGIMG_3232.JPG 
  54   Mon Nov 26 17:10:13 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 4.0 MeV beam on natC target 3On 23/11/2018:

After the runs with 7Li on CH2
15, we moved the target ladder to position
  
  53   Sat Nov 24 16:39:22 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 4.0 MeV beam on CH2 target 15On 23/11/2018:

Tuned beam for 4.0 MeV 7Li, charge
state 2+
  
  52   Sat Nov 24 16:29:10 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele BuompanePreparing setup for 7Li beamOn 23/11/2018:

10:15 started pumping down chamber
with Ecodry 2
  
  51   Sat Nov 24 15:07:00 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Tom DavinsonSearching for causes of noiseOn 22/11/2018 in the afternoon:

We increased the ADC thresholds
to 40 (previously 8).
  
  50   Sat Nov 24 15:05:40 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesFAIR DAQThe FAIR DAQ IP address: 192.168.1.90

The data is saved in /Local_Parts/Part0DE/

After each run we should copy the
  
  49   Thu Nov 22 11:53:08 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesDAQ tests with alpha sourceThe target ladder is set for position 7
- the double alpha source.

Looking at the FAIR DAQ, for the
 IMG_3329.JPGAlphaSourceCertificate.jpg 
  48   Thu Nov 22 11:34:07 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesContinuing Electronic Chain TestsThis morning at 8:35am the pressures read
(in mBar):


TPU1 = 2.0e-6
TPU2
  
  47   Wed Nov 21 09:34:26 2018 Thomas Chillery, Marialuisa Aliotta, Carlo BrunoSetting up chamber both for tests under vacuum and physics measurementToday we mounted the far aperture used
to control the far iris. No problems were
encountered with this.
 IMG_3223.JPGIMG_3224.JPG 
  46   Wed Nov 21 09:28:06 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesProblem encountered with near iris armOn 20/11/2018:

After the electronics tests in
air (see eLog entry #44) we started to setup
  
  45   Wed Nov 21 09:09:41 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, David RapagniMounting Detectors / Continuing Electronic Chain TestsOn 20/11/2018:

At 9:00 we walked into the lab,
David R reported he found all the pumps OFF.
 IMG_3209.JPG 
  44   Wed Nov 21 08:53:06 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesTesting Electronic Chain - No DetectorsOn 19/11/2018:

During the vacuum test - see eLog
entry #43 we performed noise tests on the
  
  43   Wed Nov 21 08:45:03 2018 Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Carlo BrunoTesting Chamber VacuumOn 19/11/2018:

We mounted the following in the
chamber:
  
  42   Wed Nov 21 08:37:24 2018 Thomas Chillery, Marialuisa Aliotta, Raffaele BuompaneUpstream CollimatorOn 19/11/2018:

During the target ladder calibration
(see elog entry #41) we also replaced the
 IMG_3391_Modified.JPG 
  41   Wed Nov 21 08:18:14 2018 Thomas Chillery, Marialuisa AliottaChecking Target Ladder CalibrationOn 19/11/2018:

There were three CH2 targets already
mounted on the target frame, CH2 III, IV,
 IMG_3204.JPGIMG_3205.JPGIMG_3200.JPG 
  40   Wed Jul 11 15:55:35 2018 Thomas ChilleryElectronics Channel MapSee attached for Electronics Channel Map
spreadsheet.

This is valid for the February
 Electronics_Channel_Map.ods 
  39   Fri Apr 13 15:08:04 2018 Thomas Chillery, Lucio GialanellaEnd of shift - lab cleanupDate: 07/04/2018

Began dismounting detectors:


All detectors powered off
Closed
  
  38   Fri Apr 13 14:56:11 2018 Thomas Chillery, Lucio Gialanella7Be 5.0MeV Beam test on CH2 target IV with central S2 and downstream S2 channels 0-7 Date: 07/04/2018

FC - 4 = 410 - 260 = 150 pA

We moved the target ladder to position
  
  37   Fri Apr 13 14:42:31 2018 Thomas Chillery, Lucio Gialanella7Be 5.0MeV Beam test on CH2 target III with central S2 and downstream S2 channels 0-7 Date: 07/04/2018

To run the measurement we:


Opened the central iris
  
  36   Fri Apr 13 14:31:59 2018 Thomas Chillery, Lucio GialanellaSetting up for 7Be 5.0MeV beamDate: 07/04/2018

We changed to cathod 23 - 7Be

For beam tuning we:
  
  35   Fri Apr 13 13:59:18 2018 Thomas Chillery, Lucio Gialanella7Li 5.0MeV Beam test with Central S2 and Downstream S2 first 8 channelsDate: 07/04/2018

At 12:10 we started the DAQ for
5.0 MeV 7Li in 2+ charge state bombarding
 180407_7Li_5MeV_CentralS2_FrontStrip.png180407_7Li_5MeV_DWS2_FrontStrip.png180407_7Li_5MeV_CentralS2_BackStrip.png180407_7Li_5MeV_Diode.png 
  34   Fri Apr 13 08:24:47 2018 Thomas Chillery, Lucio GialanellaAttempting to add downstream S2 to DAQ setup and fixing problems during setupDate: 07/04/2018 (Last day of April shift)

9:55 pressures read: CHUP = 1.3e-5
mBar, CHDW = 3.5 e-5 mBar
  
  33   Thu Apr 12 14:14:09 2018 Thomas Chillery, Raffaele Buompane7Be 5.0MeV Beam test with central S2Date: 06/04/2018

Before starting this beam test
we lowered the channel thresholds on ADC
 180406_7Be_5MeV_CentralS2_BackStrip.jpg180406_7Be_5MeV_Diode.jpg180406_7Be_5MeV_CentralS2_FrontStrip.jpg 
  32   Thu Apr 12 13:12:00 2018 Thomas Chillery, Raffaele Buompane7Li 5.0MeV Beam tests with Central S2Date: 06/04/2018 (after 16:40)

We powered the preamps for the
two S2 detectors and the diode.
  
  31   Thu Apr 12 12:47:04 2018 Thomas Chillery, Raffaele BuompaneCentral S2 Alpha CalibrationDate: 06/04/2018

We connected the analogue signals
of RAL X, XII, XIII, and "R" to
  
  30   Fri Apr 6 14:54:12 2018 Thomas Chillery, Raffaele BuomparteTests - Attempting to solve noise issuesToday we started by mounting the central
and downstream preamp box lids.

The pumps were left running overnight,
  
  29   Fri Apr 6 13:33:27 2018 Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias DuartesTests - Attempting to solve noise issuesOn 05/04/18, after eLog #28

After the alpha calibrationrun
Raffaele arrived and started beam tuning
  
  28   Fri Apr 6 12:07:52 2018 Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias DuartesTests - Attempting to solve noise issues, 15 min alpha calibrationOn 05/04/18:

At 9:00 the pressures read ~10mBar
inside the chamber (static vacuum). We began
 S2_2323-18_496um_Bias_Vs_Leakage_Current_050418.png 
  27   Fri Apr 6 11:39:10 2018 Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio GialanellaTests - Pumping down chamber and starting electronics testsOn 04/04/18:

We mounted S2 2323-18 (496um) in
the downstream position with 12um mylar
 S2_2323-18_496um_Bias_Vs_Leakage_Current.pngS2_2623-26_505um_Bias_Vs_Leakage_Current.png20180404_Pulser_PreampLid_ON.jpg20180404_Pulser_DisconnectedFromFeedthrough.jpg 
  26   Tue Apr 3 18:16:26 2018 Thomas Chillery, Lizeth Morales, Raffaele Buompane, Lucio GialanellaTests - Unpacking and Mounting Chamber Parts This morning I unpacked the chamber parts.

I mounted the downstream and central
lids with the iris arm hooks to double check
 IMG_2832.JPGIMG_2839.JPGIMG_2841.JPG 
  25   Tue Mar 27 16:36:01 2018 Thomas Chillery, Peter BlackTests - Modifying Chamber Parts in EdinburghBetween 7th to 21st March modifications
were made to the top of the CIRCE target
chamber.
 11x 
  24   Wed Mar 7 16:56:52 2018 Thomas Chillery, Peter BlackTests - Modifying Chamber Parts in EdinburghToday we began examining and modifying
parts of the chamber shipped from CIRCE to
Edinburgh.
  
  23   Tue Mar 6 15:55:04 2018 Thomas Chillery, Raffaele BuompaneEnd of February 2018 ShiftsOn 23/02/2018:

At the end of the February 2018
shifts the detectors bias settings were:
  
  22   Tue Mar 6 15:41:53 2018 Thomas Chillery, Raffaele BuompanePin Diode Pulser Walkthrough at End of February ShiftsOn 23/02/2018:

After the alpha source calibration
of the S2 (See eLog entry #21) we decided
 180223_PulserWalk_PinDiode_ADC6CH31.png 
  21   Tue Mar 6 15:29:55 2018 Thomas Chillery, Raffaele BuompaneCollecting S2 Alpha Calibration Spectra at End of February Test ShiftsOn 23/02/2018:

We moved the target ladder to position
7, 5.019mm, with the alpha source facing
 180223_Alpha_S2FrontStrip_ADC2CH20.png180223_Alpha_S2BackStrip_ADC4CH24.png 
  20   Sun Feb 25 15:59:38 2018 Thomas Chillery, Lizeth Morales, Raffaele Buompane, David Rapagnani, Lucio GialanellaMeasurement - 3.45MeV 7Li on CH2 Target IIIOn 23/02/2018 at 13:49 we started the DAQ
in list mode.

After starting the DAQ we sent
 180223_S2FrontStrip_ADC2CH20.png180223_S2BackStrip_ADC4CH24.png180223_PinDiode_ADC6CH31.png 
  19   Sun Feb 25 15:14:54 2018 Thomas Chillery, Lizeth Morales, David RapagnaniSetup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Morning of 23rdOn the morning of 23/02/18 we aimed to
complete beam tuning of 7Li at 3.45MeV.

At 8:43 CHUP = 7.2e-6mBar, CHDW
  
  18   Fri Feb 23 13:15:05 2018 Thomas Chillery, Raffaele Buompane, David RapagnaniSetup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Night of 22ndChecking SRIM 3.5 MeV 7Li is stopped in
9.06um mylar or 10.09 um CH2.

After the long run at 3.0MeV on
  
  17   Thu Feb 22 18:04:12 2018 Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio GialanellaMeasurement - 3.0MeV 7Li on CH2 Target VIIYesterday (21st) night we saw this low
channel, high rate (1500Hz) noise on the
diode spectrum - see eLog entry #15.
 Nuclear_Reaction-master.xlsx180222_diode.jpg180222_ADC4CH24.jpg180222_ADC2CH7.jpgPinDiode_AlphaSpectra.jpg 
  16   Thu Feb 22 14:55:09 2018 Thomas ChilleryADC6 SettingsDAQ Settings for ADC6 settings attached.
ADC 6 has been used for the pin diode during
the week starting 19/02/2018
 ADC6_Settings1.jpgADC6_Settings2.jpgADC6_Settings3.jpgADC6_Settings4.jpgADC6_Settings5.jpg 
  15   Thu Feb 22 10:40:49 2018 Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio GialanellaMeasurement / Test - 3.0MeV 7Li on CH2 Target VIIOn 21/02/2018 after beam tuning and pumping
down at 18:07 the pressures read Up = 1.2e-5mBar,
Down = 3.2e-5mBar. We were happy to power
 180221_PinDiode.png180221_S2BackStrip_ADC4CH24.png180221_S2FrontStrip_ADC2CH7.png 
  14   Thu Feb 22 07:58:48 2018 Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Lucio GialanellaSetup - Beam Tuning and Prepare Chamber for Measurement at 3.0MeV 7LiOn 21/02/2018 we reattempted the beam tuning.
We expected this to be easier now the rogue
mylar is removed from the beamline.
 IMG_2738.JPG 
  13   Wed Feb 21 10:46:22 2018 Thomas Chillery, Tom Davinson, Raffaele Buompane, David RapagnaniSetup - Pulser Settings and 20/02/2018 Pulser WalkthroughThe PB-5 Pulse Generator settings are as
follows:

Fall Time = 100us
 BKG_zoombeam1.jpg 
  12   Tue Feb 20 17:03:08 2018 Thomas Chillery, Tom Davinson, Raffaele Buompane, David RapagnaniSetup - Beam TuningThe pumps were left on overnight, in the
morning at 8:25 the pressure reads:

Up = 1.5e-5 mBar and Down = 4.0e-5
 IMG_2712.JPGIMG_2709.JPGIMG_2724.JPG 
  11   Tue Feb 20 16:57:49 2018 Thomas ChilleryScreenshots - ADC 2 and ADC 4 settings, and example pulser walkthrough   11x 
  10   Tue Feb 20 09:19:19 2018 Thomas Chillery, Tom Davinson, Raffaele Buompane, David RapagnaniSetup - Testing Chamber Vacuum and Mounting Detectors and Alpha Source(Note: Tom Davinson is now in CIRCE until
the 21st)

On 19/02/2018 we performed the
  
  9   Sat Feb 17 13:00:51 2018 Thomas ChilleryTest - S2 Detector BiasThis morning whilst I was setting up the
ribbon cabling (see eLog entry #8) I was
considering collecting a voltage bias vs
  
  8   Sat Feb 17 12:35:25 2018 Thomas ChillerySetup - Electronic CablingBetween 9:00 to 12:30 this morning Filipo
was working on the weekend 14C measurements,
allowing me to work in the lab during this
 IMG_2697.JPGIMG_2702.JPGIMG_2704.JPGIMG_2706.JPG 
  7   Fri Feb 16 18:28:42 2018 Thomas Chillery, David RapagnaniSetup - Testing Chamber VacuumBy 16:40 I mounted all three chamber lids.

The central chamber lid includes
the diode detector mount, the iris, a vacuum
  
  6   Fri Feb 16 18:21:17 2018 Thomas ChilleryIris arm problems After lunch we were still having problems
with the aperture hook, see first attached
image highlighting the arm is located in
 IMG_2677.JPGApertureArm_PetersSolution.jpg 
  5   Fri Feb 16 18:10:34 2018 Thomas Chillery, David RapagnaniSetup - Electronics Rack and Aperture IrisThis morning we moved the electronics rack
to within ~2.5m of the target chamber, leaving
room for the ribbons cables of ~5m length
  
  4   Thu Feb 15 20:45:27 2018 Thomas ChilleryPlanning - Target Chamber CAD diagramFind attached the latest CAD diagram of
the Target Chamber, drawn by Peter Black
 solid_target_11.pdf 
  3   Thu Feb 15 17:45:07 2018 Thomas Chillery, Raffaele BuompaneSetup - Problem: Connecting the actuator arm to the iris aperture armAfter lunch we attempted to connect the
actuator arms to the iris arm used to change
the iris diameter. We need two iris diameters:
 ApertureAdjustmentHooks.JPGApertureArm_TwoScrews.JPGIrisArmProblemSketch.JPG 
  2   Thu Feb 15 17:34:28 2018 Thomas Chillery, Raffaele BuompaneSetup - Mounting Target Chamber SectionsThis morning both myself and Raffaele mounted
the beamline section of the target chamber.

We also mounted the turbo located
 IMG_2621.JPG 
  1   Tue Aug 1 12:26:13 2017 Thomas Chillery10th - 22nd July 2017 Summary ReportAttached is a report summarising work performed
on the electronics and target chamber in
CIRCE from the 10th to the 22nd July 2017.
 Summary.docx 