AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE, Page 2 of 4  ELOG logo
ID Date Author Subject Text Attachments
  58   Mon Dec 3 12:32:54 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Raffaele Buompane6.0MeV 7Be on CH2 XVIIIOn 25/11/2018:

The beam was tuned for 6.0MeV 7Be
2+
 181125121226_ADC1_Ch9.png181125121226_ADC3_Ch16.png181125223800_ADC1_Ch9.png181125223800_ADC3_Ch16.png 
  57   Mon Dec 3 11:54:55 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 6.0 MeV on CH2 XVI and XVIII, and on natC IIIOn 25/11/2018:

At 8:45 the pressures read (mBar):


TPU1 = 1.0e-6
TPU2
 181125113734_ADC1_Ch9.png181125113734_ADC3_Ch16.png 
  56   Mon Dec 3 11:28:53 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Antonino d'Leva7Be 4.0MeV on CH2 XVI and natC IIIOn 24/11/2018:

After the short test with 4.0MeV
7Li (see eLog #55) the beam was tuned for
 181124120558_ADC1_Ch9.png181124120558_ADC3_Ch16.png181124182304_ADC1_Ch9.png181124182304_ADC3_Ch16.png 
  55   Mon Nov 26 17:13:45 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio GialanellaPreparing chamber for 4MeV 7Be 2+ beamOn 24/11/2018:

At 8:35 the chamber pressures read
(mBar):
 IMG_3231.JPGIMG_3232.JPG 
  54   Mon Nov 26 17:10:13 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 4.0 MeV beam on natC target 3On 23/11/2018:

After the runs with 7Li on CH2
15, we moved the target ladder to position
  
  53   Sat Nov 24 16:39:22 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 4.0 MeV beam on CH2 target 15On 23/11/2018:

Tuned beam for 4.0 MeV 7Li, charge
state 2+
  
  52   Sat Nov 24 16:29:10 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele BuompanePreparing setup for 7Li beamOn 23/11/2018:

10:15 started pumping down chamber
with Ecodry 2
  
  51   Sat Nov 24 15:07:00 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Tom DavinsonSearching for causes of noiseOn 22/11/2018 in the afternoon:

We increased the ADC thresholds
to 40 (previously 8).
  
  50   Sat Nov 24 15:05:40 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesFAIR DAQThe FAIR DAQ IP address: 192.168.1.90

The data is saved in /Local_Parts/Part0DE/

After each run we should copy the
  
  49   Thu Nov 22 11:53:08 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesDAQ tests with alpha sourceThe target ladder is set for position 7
- the double alpha source.

Looking at the FAIR DAQ, for the
 IMG_3329.JPGAlphaSourceCertificate.jpg 
  48   Thu Nov 22 11:34:07 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesContinuing Electronic Chain TestsThis morning at 8:35am the pressures read
(in mBar):


TPU1 = 2.0e-6
TPU2
  
  47   Wed Nov 21 09:34:26 2018 Thomas Chillery, Marialuisa Aliotta, Carlo BrunoSetting up chamber both for tests under vacuum and physics measurementToday we mounted the far aperture used
to control the far iris. No problems were
encountered with this.
 IMG_3223.JPGIMG_3224.JPG 
  46   Wed Nov 21 09:28:06 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesProblem encountered with near iris armOn 20/11/2018:

After the electronics tests in
air (see eLog entry #44) we started to setup
  
  45   Wed Nov 21 09:09:41 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, David RapagniMounting Detectors / Continuing Electronic Chain TestsOn 20/11/2018:

At 9:00 we walked into the lab,
David R reported he found all the pumps OFF.
 IMG_3209.JPG 
  44   Wed Nov 21 08:53:06 2018 Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth MoralesTesting Electronic Chain - No DetectorsOn 19/11/2018:

During the vacuum test - see eLog
entry #43 we performed noise tests on the
  
  43   Wed Nov 21 08:45:03 2018 Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Carlo BrunoTesting Chamber VacuumOn 19/11/2018:

We mounted the following in the
chamber:
  
  42   Wed Nov 21 08:37:24 2018 Thomas Chillery, Marialuisa Aliotta, Raffaele BuompaneUpstream CollimatorOn 19/11/2018:

During the target ladder calibration
(see elog entry #41) we also replaced the
 IMG_3391_Modified.JPG 
  41   Wed Nov 21 08:18:14 2018 Thomas Chillery, Marialuisa AliottaChecking Target Ladder CalibrationOn 19/11/2018:

There were three CH2 targets already
mounted on the target frame, CH2 III, IV,
 IMG_3204.JPGIMG_3205.JPGIMG_3200.JPG 
  40   Wed Jul 11 15:55:35 2018 Thomas ChilleryElectronics Channel MapSee attached for Electronics Channel Map
spreadsheet.

This is valid for the February
 Electronics_Channel_Map.ods 
  39   Fri Apr 13 15:08:04 2018 Thomas Chillery, Lucio GialanellaEnd of shift - lab cleanupDate: 07/04/2018

Began dismounting detectors:


All detectors powered off
Closed
  
ELOG V3.1.4-unknown