Entry  Fri Feb 16 18:21:17 2018, Thomas Chillery, Iris arm problems  IMG_2677.JPGApertureArm_PetersSolution.jpg
After lunch we were still having problems with the aperture hook, see first attached image highlighting the arm is located in close proximity (but not
touching) the vacuum feedthrough and ribbon cable.

Meanwhile in Edinburgh Peter Black designed and built an additional component of the hook to assist in connecting it between the actuator and
Entry  Mon Dec 3 12:57:54 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, David Rapagni, Finishing 6.0MeV 7Be 2+ and 7Li 2+ beam runs 181126105357_ADC1_Ch9.png181126105357_ADC3_Ch16.png
On 26/11/2018:

The accelerator and chamber setup were still operating after the overnight run.

Far S2 bias = -130V, leak I = 1.59uA. Diode bias = -70.1V, leak I = 0.00uA.
Entry  Mon Dec 3 16:47:40 2018, Thomas Chillery, Carlo Bruno, Lizeth Morales, Finishing 3.0MeV 7Be measurements with CH2 XIX and natC III 181127085408_ADC1_Ch9.png181127085408_ADC3_Ch16.png181127090808_ADC1_24.png181127092128_ADC1_Ch9.png181127092128_ADC3_Ch16.png
On 27/11/2018:

At 8:40 Far S2 bias = -130.0V, leak I = 1.74uA. Diode bias = -70.1V, leak I = 0.00uA.

Pressures (mBar):
Entry  Sat Nov 24 15:05:40 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, FAIR DAQ 
The FAIR DAQ IP address: 192.168.1.90

The data is saved in /Local_Parts/Part0DE/

After each run we should copy the data to the 7Be shift folder: /home/circe/7Be_pp/181122/
Entry  Fri Apr 13 15:08:04 2018, Thomas Chillery, Lucio Gialanella, End of shift - lab cleanup 
Date: 07/04/2018

Began dismounting detectors:


All detectors powered off
Closed line and quadrupole valves
Preamp power off
Stopped turbos
Closed
Entry  Mon Dec 3 18:45:17 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Module settings 
Diode Ortec 571 Amplifier Settings:


Fine gain: 10 (0.5 ->1.5)
Course gain: 50
Shaping time: 0.5us
BLR AUTO: ON
NEG: ON (Instead
of POS)
OUT: ON (Instead of Delay)
Internal fine gain: 1X


Diode quad TFA settings:
Entry  Mon Dec 3 19:04:20 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Items to be shipped back to Edinburgh 
To be shipped back to Edinburgh for repair:





Item

Quantity


ECL - NIM Convertor
2


Quad HV Supply
1


Quad
Entry  Mon Dec 3 18:55:31 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Cleanup 8x
On 29/11/2018:

Dismounted S2 2323-18 (496um), 12um mylar, diode, and diodes 0.9um mylar.

Performed general cleanup of lab. Boxed away cables and other parts. See attached pictures 1, 2, 3, and 4.
Entry  Tue Mar 6 15:55:04 2018, Thomas Chillery, Raffaele Buompane, End of February 2018 Shifts 
On 23/02/2018:

At the end of the February 2018 shifts the detectors bias settings were:

S2 bias = -130.3V, leak I = 2.42uA
Entry  Wed Jul 11 15:55:35 2018, Thomas Chillery, Electronics Channel Map Electronics_Channel_Map.ods
See attached for Electronics Channel Map spreadsheet.

This is valid for the February 2018 Beamtime; it maps out the Far S2 Strips onto the ADC channels

A map should be produced and updated for each beamtime to ensure S2 Strip -> ADC Channel is correctly documented.
Entry  Thu Nov 22 11:53:08 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, DAQ tests with alpha source IMG_3329.JPGAlphaSourceCertificate.jpg
The target ladder is set for position 7 - the double alpha source.

Looking at the FAIR DAQ, for the Far S2 the first RAL amplifier (XV) shows:


Alphas at channel 700
Pulser centroid at channel ~2640, with 9 channel FWHM -> corresponds to 44 keV FWHM at 4.91 keV/channel


The
Entry  Thu Nov 22 11:34:07 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Continuing Electronic Chain Tests 
This morning at 8:35am the pressures read (in mBar):


TPU1 = 2.0e-6
TPU2 = 4.5e-7
TPD1 = 8.1e-7
TPD2 = 7.9e-7
CHUP = 4.7e-7
CHDW = 1.1e-5


The
detectors were biased. Far S2 leak I = 1.54uA, near S2 leak I = 12.53uA.
Entry  Tue Mar 6 15:29:55 2018, Thomas Chillery, Raffaele Buompane, Collecting S2 Alpha Calibration Spectra at End of February Test Shifts 180223_Alpha_S2FrontStrip_ADC2CH20.png180223_Alpha_S2BackStrip_ADC4CH24.png
On 23/02/2018:

We moved the target ladder to position 7, 5.019mm, with the alpha source facing downsteam.

At 17:17 we started the DAQ for a 15 minute alpha spectrum on the downstream S2. Save name: /Remote_Objs/RData_1/180223172135
Entry  Wed Nov 21 08:18:14 2018, Thomas Chillery, Marialuisa Aliotta, Checking Target Ladder Calibration IMG_3204.JPGIMG_3205.JPGIMG_3200.JPG
On 19/11/2018:

There were three CH2 targets already mounted on the target frame, CH2 III, IV, and a damaged target. We dismounted these.

We noticed these previous target were mounted on the incorrect side of the target ladder, resulting in them being offset upstream from the central
Entry  Mon Dec 3 15:51:11 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, David Rapagni, Changing far S2 protective mylar foil, preparing for 3.0MeV 7Li and 7Be IMG_3273.JPG
On 26/11/2018, after 6.0MeV 7Be and 7Li beam measurements:

At 11:15:

Far S2 bias = -130.0V, leak I = 1.60uA. Diode bias = -70.1V, leak I = 0.00uA.
Entry  Tue Dec 4 11:23:29 2018, Thomas Chillery, Chamber Dimensions IMG_3397.JPGIMG_3398.JPGIMG_3399.JPG
See attached pictures for measurements of the 7Be(p,p) chamber dimensions.

The target ladder center - Far S2 distance = 50 + 95 + 0.85 - (19.22+19.58)/2 = 126.45 mm
Entry  Thu Apr 12 12:47:04 2018, Thomas Chillery, Raffaele Buompane, Central S2 Alpha Calibration 
Date: 06/04/2018

We connected the analogue signals of RAL X, XII, XIII, and "R" to the 3rd ADC (Module 4)

We connected the analogue signals of RAL "S", "Q", "u", and "w" to the 4th ADC (Module 5)
Entry  Mon Dec 3 18:15:42 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - no mylar on Far S2 IMG_3337.JPG182812_S2_Alpha_NoMylar.jpg
On 28/11/2018:

At 13:35: Far S2 bias = -130.0V, leak I = 1.55uA. Diode bias = -70.1V, leak I = 0.00uA.

Pressures (mBar):
Entry  Mon Dec 3 18:30:53 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - 12um mylar on Far S2 IMG_3356.JPGIMG_3363.JPG181128184505_ADC1_Ch9.png
On 28/11/2018:

Mounted 12um mylar in front of far S2 - see attached pictures 1 and 2

In air: Far S2 biased to -130.0V, leak I = 1.61uA. Diode biased to -70.1V, leak I = 0.01uA -> 0.00uA. Rate meter ~ 4500Hz.
Entry  Mon Dec 3 17:59:48 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - 0.9um mylar on Far S2 IMG_3305.JPGIMG_3307.JPGIMG_3315.JPGIMG_3313.JPG181128123940_ADC1_Ch9.png
On 28/11/2018:

After pulser walkthrough (see eLog entry #67)

Dismounted targets from ladder - see picture 1 and 2 for upstream and downstream sides respectively