Thu Jul 24 15:50:01 2025, CC, MP, NK, Check of BB7 impact   
|
HT of upstream AIDA from iseg, HT cable shielded, 100V, 17 uA. HT of downstream AIDA from CAEN, AIDA#0. Both channel 0 and 1 of CAEN
are on, even though there is just one channel connected. DEGAS platform closed. The crates of BB7 and bplast have been put to the ground of the AIDA's
structure (cupper sheet) |
Thu Jul 24 13:36:34 2025, CC, MP, NK, AIDA05 connected and disconnected compared to AIDA09 10x
|
HT cable shielded, HT of upstream AIDA from iseg, HT of downstream AIDA from CAEN. Both channel 0 and 1 of CAEN are on, even though
there is just one channel connected. During this test, some parallele tests are being done on BB7 Mesytec. In general, middle tile: detector disconnected
from preamps but preamps connected on the other side. Right tile: detector connected to preamps, cable shielded but preamps disconnected on the other |
Thu Jul 24 10:28:04 2025, CC, NK, MP, Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L 8x
|
BB7 is still connected but not biased (same configuration as the previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased
at 100V. The channel of the CAEN power supply #1 is disconnected but still biased at 100V. AIDA04 (chained to AIDA05) is biased via an unshielded
cable to an iseg NHQ 246L power supplied, biased at 100 V with 15 uA. |
Wed Jul 23 17:02:22 2025, CC, NK, Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L 8x
|
BB7 is still connected but not biased (same configuration as the previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased
at 100V. The channel of the CAEN power supply #1 is disconnected but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to
an iseg NHQ 246L power supplied, biased at 101 V with 16 uA. |
Wed Jul 23 15:56:00 2025, CC, MP, NK, Test of AIDA05 with new bias module
|
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 101 V with shielded cables. BB7 is still connected but not biased (same configuration as the
previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased at 100V. The channel of the CAEN power supply #1 is disconnected
but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to an iseg NHQ 246L power supplied, biased at 101 V with 16 uA. |
Wed Jul 23 15:04:26 2025, CC, MP, NK, Test of AIDA05 with BB7 connected to Mesytec but not biased
|
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 100 V with not-shielded cables, after the DEGAS platform has been closed, the 2 tiles of BB7
have been connected to the mesytec preamps. BB7 is not biased. The mesytec preamps have been fully connected and supplied but 6/8 black cables are not
connected on the other side. 4X and 4Y are connected to the 2 FEBEX cards. |
Wed Jul 23 13:59:37 2025, CC, NK, Shielding of the snout
|
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 100 V with not-shielded cables, CAEN HT, after the base of the snout (screws) has
been connected to the ground via cupper sheets
FWHM: 76 channels (to be compared with the 2 previous elogs 73 channels and 75 channels) |
Wed Jul 23 13:08:30 2025, CC, NK, Comparison of channels in the same FEE64 and ASIC 05.1    
|
Biased at 100, AIDA05 connected, HT cables not shielded CAEN HT
Attachment 1: AIDA05.1.8L --> FWHM 75 channels
Attachment 2: AIDA05.1.1L --> FWHM 70 channels; peak of the pulser shifted to the right (red lines on the left: cursor for the 1.8L) |
Wed Jul 23 09:37:34 2025, CC, NK, Comparison pulser FWHM with/without HT and detector cables 9x
|
This elog is the first reliable. Before, the histograms have not been zero'd
Each test are done and compared for AIDA05.1.8L, compared with the pulser (caracteristics, see attachment1)
Test 1: with HT cables shielded |
Tue Jul 22 18:00:45 2025, CC, NK, MP, FWHM aida FEE 
|
AIDA05 completely disconnected, all the others FEEs64 are fully connected
Attachment 1: aida05, FWHM= 95 ch, 63 keV
Attachment 2: aida15, FWHM= 108 ch, 74 keV |
Tue Jul 22 17:00:26 2025, MP, CC, Status 
|
Test with shielded HV cables for both detectors.
The FWHM for ch1 is now 184 ch.
Yesterday cables for cards 5, 6, 10, 11, 12, 14, 16 were partially connected (only 1 out of 2 flat cables was in), now both are connected. |
Mon Jul 21 13:01:19 2025, MP, Status 
|
Status before grounding checks |
Sun Jun 15 10:53:08 2025, TD, Sunday 15 June 2025 41x
|
11.45 DSSSD bias & leakage current - attachment 1
FEE64 temps OK - attachment 2
|
Sat Jun 14 11:20:45 2025, TD, Saturday 14 June 2025 30x
|
12.21 BNC PB-5 settings
Amplitude 1.0V
|
Fri Jun 13 12:42:39 2025, CC, TD, Friday 13 June 2025 10x
|
13.42 ASIC settings 2025Jun12-13.53.04
*all* FEE64s slow comparator 0x64
|
Thu Jun 12 13:15:25 2025, GB, CC, NK, MP, TD, Thursday 12 June 2025 
|
EMC tests with NK (Orsay)
|
Tue Apr 8 08:52:39 2025, TD, AIDA grounding 
|
AIDA DSSSDs and FEE64-DSSSD cabling are electrically isolated (by design) from snout, mounting rods and support assembly.
FEE64-DSSSD ribbon cables screened by 3M 1245 Cu foil, drain wire to FEE64 adaptor PCB
|
Tue Mar 11 11:53:18 2025, TD, Monday 10 March 11x
|
18.30 AIDA powered up for brief test
|
Sat Feb 22 12:35:38 2025, TD, Offline analysis data files R9_85-R9_199 (84Mo setting) 22x
|
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
|
Thu Feb 20 17:06:42 2025, JB, CC, TD,MP, WR error for aida 13,14,15,16
|
WR timestamp errors resolved after reseating the HDMI cables to the MACB |