171
|
Thu Mar 4 11:16:13 2021 |
OH | Further cases of possible database issues | During testing for the S452 experiment yesterday
we were running through the steps of a restart.
|
 |
|
170
|
Thu Mar 4 11:03:04 2021 |
NH | S452 Operating Notes | Please note the following "quirks" currently
present in S452 that are important
|
|
|
169
|
Thu Mar 4 10:13:48 2021 |
OH | AnyDesk connection instuction | |
|
|
168
|
Wed Mar 3 15:02:19 2021 |
CA | MBS command line startup | /MIDAS/Linux/startup/datarelaymbs |
|
|
167
|
Sat Feb 27 12:47:57 2021 |
NH | AIDA Rates/Situation | Updated figures as of 27 Feb 2021 - S4 is
now closed for experiments but may open on
Wednesday.
|
10x |
|
166
|
Mon Feb 22 18:18:47 2021 |
NH | AIDA Rates/Situation | The ground cable (LEMO00) in aida07 was disconnected,
it has been reinserted and the waveforms
now look good.
|
8x |
|
165
|
Fri Feb 12 17:31:04 2021 |
NH | Background run | A background run has been started to check
the AIDA channels.
It is in /TapeData/BGFEB21
|
|
|
164
|
Sat Feb 6 10:45:55 2021 |
NH | AIDA Status Feb 2021 | > 01.02.2021 - Four new sets of PSU, HDMI
& Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for |
   |
|
163
|
Mon Feb 1 15:19:07 2021 |
NH | AIDA Status Feb 2021 | 01.02.2021 - Four new sets of PSU, HDMI &
Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for |
|
|
162
|
Tue Nov 24 13:10:42 2020 |
NH | Waveforms with frame grounded | AIDA Frame is now grounded to platform (will
add photo later)
|
   |
|
161
|
Tue Oct 6 15:48:06 2020 |
NH | nnrpi kernel update | FYI:
The SD card on nnrpi2 was full again causing |
|
|
160
|
Tue Jul 7 08:50:27 2020 |
NH | nnrpi2 does not boot | MIDAS was not working properly on nnrpi2 -
power cycled. Now system does not boot properly,
it gets stuck trying to login claiming "PAM |
|
|
159
|
Tue Jul 7 08:04:57 2020 |
NH | Power failure in Messhuette | Last week there was a power failure in Messhuette
(FRS control room) - AIDA-3 and MBS were
affected.
|
|
|
157
|
Wed Mar 18 18:02:37 2020 |
PJCS | New Firmware loaded in all FEE64s | Loaded new frimware into all 12 FEE64s
in the system. IWR_Dec19_4.bin
Booted ok after power-cycle. |
|
|
156
|
Mon Mar 16 07:25:24 2020 |
NH | End of Experiment | 08:25 Beam Stopped, end of S480
Tape Server stopped at R12_2097
Started again in no storage mode |
|
|
155
|
Mon Mar 16 05:08:12 2020 |
TA, AM, ES | Regular entry |
02:14 all system wide checks okay
FEE temperatures okay
leakage
currents okay and recorded to spreadsheet |
6x |
|
154
|
Mon Mar 16 01:07:29 2020 |
TA, AM, ES | Regular entry |
02:14 all system wide checks okay
FEE temperatures okay
leakage
currents okay and recorded to spreadsheet |
13x |
|
153
|
Sun Mar 15 06:45:00 2020 |
CA, LS, CG | Sunday 15th March 08:00 - 24:00 | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
35x |
|
152
|
Sat Mar 14 23:09:28 2020 |
MB, SJ, MR | Sunday 15th March 0:00-8:00 | AIDA ELog filled out by DESPEC night shift
members Matthew Brunet (MB), Shaheen Jazrawi
(SJ), and Matthias Rudiger (MR). |
16x |
|
151
|
Sat Mar 14 07:13:59 2020 |
DK, TD, LS, CG | Saturday 14th March 08:00 - 24:00 | 8:15
All system wide checks passed
Leak currents are continuing to creep |