AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 26 of 35  ELOG logo
  ID Date Author Subject Text Attachments
  191   Fri Mar 12 08:32:46 2021 TDFriday 12 March 08.00-08.31 DAQ continues OK - file R33_263

      ASIC settings 2019Dec19-16.19.51
 Screenshot_2021-03-12_Temperature_and_status_scan_aidas-gsi.pngScreenshot_2021-03-12_Statistics_aidas-gsi.png30.pngScreenshot_2021-03-12_Spectrum_Browser_aidas-gsi(1).pngScreenshot_2021-03-12_Spectrum_Browser_aidas-gsi.png 
  190   Thu Mar 11 23:07:23 2021 CAMarch 12th 00:00 - 08:00 shift00:10 DAQ continues OK - file R30_372

      ASIC settings 2019Dec19-16.19.51
 15x 
  189   Thu Mar 11 07:09:25 2021 OH, LSThursday 11th of March08:00 System wide checks all ok *exctept aida07
and 10 on ADC calibration
      N.B. wrong date given to the screenshots
 29x 
  188   Thu Mar 11 00:38:33 2021 TDThusrday 11 March 00.00-08.0001.38 DAQ continues OK - file R22_388

      ASIC settings 2019Dec19-16.19.51
 11x 
  187   Wed Mar 10 07:16:02 2021 OH, LSWednesday 10th March 08:00-24:0008:16 System wide checks all ok
      Statistics - attachment 1
      Temperatures - attachment 2
 39x 
  186   Tue Mar 9 23:12:17 2021 CAMarch 10th 00:00 - 08:0000:13 beam back, but some spills 'missing'

      DESPEC keeping beam as is, but may
 20x 
  185   Tue Mar 9 20:04:20 2021 TDTuesday 9 March 21.04 DAQ continues OK - file R20_379

      ASIC settings 2019Dec19-16.19.51
 7x 
  184   Tue Mar 9 10:23:45 2021 TDAnalysis of R14 (w/ NewMerger with min info code 4 & 5 data items)
Per https://elog.ph.ed.ac.uk/DESPEC/183 R14
data files have been analysed
 R14_0R14_19 
  183   Tue Mar 9 06:58:14 2021 CA, LSMarch 9th 08:00-11:00 shift08:00 DAQ continues ok - writing to file R13_120

      Merger ok - 4.6M data items/s
 23x 
  182   Mon Mar 8 22:51:47 2021 OHTuesday 9th March18:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 10x 
  181   Mon Mar 8 17:02:38 2021 CAMonday 8th March 18:00 - 00:0018:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 12x 
  180   Mon Mar 8 09:45:20 2021 CA, TDAnalysis R7_20 (new version of NewMerger with min info code 4 & 5 data items)
An analysis of file R6_70 can be found at
https://elog.ph.ed.ac.uk/DESPEC/177 attachment
 R7_20R7_20_verbose 
  179   Mon Mar 8 07:02:17 2021 CA, LSMonday 8th March 08:00 - 17:0008:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 24x 
  178   Sun Mar 7 23:13:50 2021 OHMonday 8th March00:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 13x 
  177   Sun Mar 7 07:23:26 2021 CA, LSMarch 7th 08:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 14x 
  176   Sat Mar 6 23:37:22 2021 TDSunday 7 March 00.00-08:00
00.30 UNILAC problem - no beam
 18x 
  175   Sat Mar 6 06:52:06 2021 OH, LSSaturday 6th March07:50 Pulser settings - attachment 1

07:52 System wide checks all ok
 30x 
  174   Fri Mar 5 23:45:41 2021 TDS452 information
aida-gsi Anydesk 897170655
 S452__Shifts_checkpoints_v1_(1).pdfS452_Shift_Plan.pdf 
  173   Fri Mar 5 23:21:59 2021 CA, OHMarch 6th 2021 00:00 - 08:00 shift00:23 206Hg setting - No beam in AIDA yet

      AIDA not writing to file
 18x 
  172   Fri Mar 5 22:53:05 2021 OHThursday 5th of MarchThere has been no beam for much of the day.
It was lost at 13:00 and not regained until
22:00 German time.
  
ELOG V3.1.4-unknown