  ID Date Author Subject Text Attachments
  517   Wed Jan 18 13:40:33 2023 PJCS TDMACB settings with either Emulator or VITARWhen using the VETAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3.
 macb_apr20.jedmacb_apr20.vhdzybo.jpgMACB.jpg 
  516   Fri Dec 16 14:02:12 2022 NHAIDA System off for christmas breakThe AIDA NIM crate, pis and workstation have
been powered off for the Christmas break
and will not be accessible
  
  515   Thu Oct 6 16:51:49 2022 NHOscilloscope analysisInvestigating AIDA noise with a TA041 differential
probe and oscilloscope 
 24x 
  514   Wed Sep 14 19:07:07 2022 PJCSINFO : Three Merger Statistics explainedThere are three Merger statistics that
can be used to better understand how the
data flow through the Merger system is proceeding.
  
  513   Thu Sep 8 12:37:18 2022 NHProxy Port ChangedThe proxy in Firefox, Yum and AnyDesk has
been changed as the old wasn't working
  
  512   Thu Sep 8 12:31:25 2022 NHRetrying AIDA DataAcq v10Startup AIDA with ribbon cable connected to
aida03 and aida07 for noise
 AnyDeskMSI_2022-09-08_13-35-50.pngAnyDeskMSI_2022-09-08_13-35-58.pngAnyDeskMSI_2022-09-08_13-36-02.png 
  511   Tue Aug 30 13:48:32 2022 NHAIDA Single Switch ConfigurationThe second switch was moved back to CARME
so AIDA has been configured back to using
a single switch
  
  510   Tue Jul 5 08:53:20 2022 TDTo Do
In no particular order
  
  509   Wed Jun 29 10:48:26 2022 NH, OHAIDA DismountedAll detectors removed from single and triple
AIDA snouts
  
  508   Tue Jun 28 10:11:35 2022 OH, NHMIDAS Data Aq V1011:11 Rebooted FEEs and changed aidacommon
in /MIDAS/linux-ppc_4xx/startup to point
to the new V10 DataAq that Patrick produced
 220628_1117_Rollover0xE.png220628_1119_Merger_Stats_0x7.pngNewMerger_Dump.txt 
  507   Tue Jun 28 09:37:19 2022 NHTues 28 June 08:00-Experiment over

10:37 - Stop DAQ & Tape 
  
  506   Mon Jun 27 23:11:47 2022 TDTuesday 28 June 00:00-08:0000:07 Zero stats & all histograms

ASIC settings 2021Apr29-13-16-00
 30x 
  505   Mon Jun 27 17:03:09 2022 MAMonday 27th June 16:00-00:0016:00 Took over the shift from OH no beam
yet.

18:00 Still no beam yet.
 6x 
  504   Mon Jun 27 06:45:22 2022 OHMonday 27th June 08:00-16:0007:45 Spoke to David and the beam has been
gone since about 05:30
      Reason for the loss of beam is a vacuum
 220626_0830_Stats.png220626_0830_Temp.png220626_0831_Bias.pngR5_770_analysis.txt 
  503   Sun Jun 26 23:04:30 2022 Marcnew shift - Monday 27 June 0:00 to 8:000:00 Experiment continues to run smoothly.
AIDA DAQ has been rather stable. Leakage
current has gone up for the past two days
 12x 
  502   Sun Jun 26 08:51:20 2022 OH, NHSunday 26 June 08:00-24:0009:51 Taken over from Tom following the night
shift
      Experiment is still running smoothly
 27x 
  501   Sat Jun 25 22:48:57 2022 TDSunday 26 June 00:00-08:0023.43 Check ASIC control
      Zero stats & all histograms
 30x 
  500   Sat Jun 25 17:06:42 2022 BA, AASaturday 25 June 2022 16:00-00:00Took over the night shift from Magda

 

18:00 : attachments 1-3
 9x 
  499   Sat Jun 25 06:55:07 2022 MSSaturday 25 June 2022 8:00-16:00Took over the night shift from Tom.

7:00 The beam is back.

8:00 : attachments 1-3
 15x 
  498   Fri Jun 24 22:36:45 2022 TDSaturday 25 June 00:00-08:00
23:36 Check ASIC contorol
      Zero stats & all histograms
 31x 