DESPEC, Page 10 of 35
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
686 Entries
Goto page
Previous
1
,
2
,
3
...
9
, 10,
11
...
33
,
34
,
35
Next
Selected entries:
ID
Date
Author
Subject
Text
517
Wed Jan 18 13:40:33 2023
PJCS TD
MACB settings with either Emulator or VITAR
When using the VETAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3.
516
Fri Dec 16 14:02:12 2022
NH
AIDA System off for christmas break
The AIDA NIM crate, pis and workstation have
been powered off for the Christmas break
and will not be accessible
515
Thu Oct 6 16:51:49 2022
NH
Oscilloscope analysis
Investigating AIDA noise with a TA041 differential
probe and oscilloscope
24x
514
Wed Sep 14 19:07:07 2022
PJCS
INFO : Three Merger Statistics explained
There are three Merger statistics that
can be used to better understand how the
data flow through the Merger system is proceeding.
513
Thu Sep 8 12:37:18 2022
NH
Proxy Port Changed
The proxy in Firefox, Yum and AnyDesk has
been changed as the old wasn't working
512
Thu Sep 8 12:31:25 2022
NH
Retrying AIDA DataAcq v10
Startup AIDA with ribbon cable connected to
aida03 and aida07 for noise
511
Tue Aug 30 13:48:32 2022
NH
AIDA Single Switch Configuration
The second switch was moved back to CARME
so AIDA has been configured back to using
a single switch
510
Tue Jul 5 08:53:20 2022
TD
To Do
In no particular order
509
Wed Jun 29 10:48:26 2022
NH, OH
AIDA Dismounted
All detectors removed from single and triple
AIDA snouts
508
Tue Jun 28 10:11:35 2022
OH, NH
MIDAS Data Aq V10
11:11 Rebooted FEEs and changed aidacommon
in /MIDAS/linux-ppc_4xx/startup to point
to the new V10 DataAq that Patrick produced
507
Tue Jun 28 09:37:19 2022
NH
Tues 28 June 08:00-
Experiment over
10:37 - Stop DAQ & Tape
506
Mon Jun 27 23:11:47 2022
TD
Tuesday 28 June 00:00-08:00
00:07 Zero stats & all histograms
ASIC settings 2021Apr29-13-16-00
30x
505
Mon Jun 27 17:03:09 2022
MA
Monday 27th June 16:00-00:00
16:00 Took over the shift from OH no beam
yet.
18:00 Still no beam yet.
6x
504
Mon Jun 27 06:45:22 2022
OH
Monday 27th June 08:00-16:00
07:45 Spoke to David and the beam has been
gone since about 05:30
Reason for the loss of beam is a vacuum
503
Sun Jun 26 23:04:30 2022
Marc
new shift - Monday 27 June 0:00 to 8:00
0:00 Experiment continues to run smoothly.
AIDA DAQ has been rather stable. Leakage
current has gone up for the past two days
12x
502
Sun Jun 26 08:51:20 2022
OH, NH
Sunday 26 June 08:00-24:00
09:51 Taken over from Tom following the night
shift
Experiment is still running smoothly
27x
501
Sat Jun 25 22:48:57 2022
TD
Sunday 26 June 00:00-08:00
23.43 Check ASIC control
Zero stats & all histograms
30x
500
Sat Jun 25 17:06:42 2022
BA, AA
Saturday 25 June 2022 16:00-00:00
Took over the night shift from Magda
18:00 : attachments 1-3
9x
499
Sat Jun 25 06:55:07 2022
MS
Saturday 25 June 2022 8:00-16:00
Took over the night shift from Tom.
7:00 The beam is back.
8:00 : attachments 1-3
15x
498
Fri Jun 24 22:36:45 2022
TD
Saturday 25 June 00:00-08:00
23:36 Check ASIC contorol
Zero stats & all histograms
31x
Goto page