  514   Wed Sep 14 19:07:07 2022 PJCSINFO : Three Merger Statistics explainedThere are three Merger statistics that
can be used to better understand how the
data flow through the Merger system is proceeding.
  
  513   Thu Sep 8 12:37:18 2022 NHProxy Port ChangedThe proxy in Firefox, Yum and AnyDesk has
been changed as the old wasn't working
  
  512   Thu Sep 8 12:31:25 2022 NHRetrying AIDA DataAcq v10Startup AIDA with ribbon cable connected to
aida03 and aida07 for noise
 AnyDeskMSI_2022-09-08_13-35-50.pngAnyDeskMSI_2022-09-08_13-35-58.pngAnyDeskMSI_2022-09-08_13-36-02.png 
  511   Tue Aug 30 13:48:32 2022 NHAIDA Single Switch ConfigurationThe second switch was moved back to CARME
so AIDA has been configured back to using
a single switch
  
  510   Tue Jul 5 08:53:20 2022 TDTo Do
In no particular order
  
  509   Wed Jun 29 10:48:26 2022 NH, OHAIDA DismountedAll detectors removed from single and triple
AIDA snouts
  
  508   Tue Jun 28 10:11:35 2022 OH, NHMIDAS Data Aq V1011:11 Rebooted FEEs and changed aidacommon
in /MIDAS/linux-ppc_4xx/startup to point
to the new V10 DataAq that Patrick produced
 220628_1117_Rollover0xE.png220628_1119_Merger_Stats_0x7.pngNewMerger_Dump.txt 
  507   Tue Jun 28 09:37:19 2022 NHTues 28 June 08:00-Experiment over

10:37 - Stop DAQ & Tape 
  
  506   Mon Jun 27 23:11:47 2022 TDTuesday 28 June 00:00-08:0000:07 Zero stats & all histograms

ASIC settings 2021Apr29-13-16-00
 30x 
  505   Mon Jun 27 17:03:09 2022 MAMonday 27th June 16:00-00:0016:00 Took over the shift from OH no beam
yet.

18:00 Still no beam yet.
 6x 
  504   Mon Jun 27 06:45:22 2022 OHMonday 27th June 08:00-16:0007:45 Spoke to David and the beam has been
gone since about 05:30
      Reason for the loss of beam is a vacuum
 220626_0830_Stats.png220626_0830_Temp.png220626_0831_Bias.pngR5_770_analysis.txt 
  503   Sun Jun 26 23:04:30 2022 Marcnew shift - Monday 27 June 0:00 to 8:000:00 Experiment continues to run smoothly.
AIDA DAQ has been rather stable. Leakage
current has gone up for the past two days
 12x 
  502   Sun Jun 26 08:51:20 2022 OH, NHSunday 26 June 08:00-24:0009:51 Taken over from Tom following the night
shift
      Experiment is still running smoothly
 27x 
  501   Sat Jun 25 22:48:57 2022 TDSunday 26 June 00:00-08:0023.43 Check ASIC control
      Zero stats & all histograms
 30x 
  500   Sat Jun 25 17:06:42 2022 BA, AASaturday 25 June 2022 16:00-00:00Took over the night shift from Magda

 

18:00 : attachments 1-3
 9x 
  499   Sat Jun 25 06:55:07 2022 MSSaturday 25 June 2022 8:00-16:00Took over the night shift from Tom.

7:00 The beam is back.

8:00 : attachments 1-3
 15x 
  498   Fri Jun 24 22:36:45 2022 TDSaturday 25 June 00:00-08:00
23:36 Check ASIC contorol
      Zero stats & all histograms
 31x 
  497   Fri Jun 24 15:04:06 2022 MarcFriday 24th June - evening shift16:05 - Last checked was at 15:30. (see
previous entry. All running smoothly.  

Next wide check will be in about
 11x 
  496   Fri Jun 24 06:56:06 2022 OHFriday 24 June 008:00-16:0007:56 Took over from AM. No issues reported
overnight
      Stats ok - attachment 1
 16x 
  495   Fri Jun 24 00:34:55 2022 AMFriday 24 June 00:00-08:0001:30    Attachments 1-5,
white rabbit and fpga timestamp failures,
otherwise all good
 20x 