AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC, Page 11 of 36
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
703 Entries
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
...
34
,
35
,
36
Next
Selected entries:
ID
Date
Author
Subject
Text
514
Wed Sep 14 19:07:07 2022
PJCS
INFO : Three Merger Statistics explained
There are three Merger statistics that
can be used to better understand how the
data flow through the Merger system is proceeding.
513
Thu Sep 8 12:37:18 2022
NH
Proxy Port Changed
The proxy in Firefox, Yum and AnyDesk has
been changed as the old wasn't working
512
Thu Sep 8 12:31:25 2022
NH
Retrying AIDA DataAcq v10
Startup AIDA with ribbon cable connected to
aida03 and aida07 for noise
511
Tue Aug 30 13:48:32 2022
NH
AIDA Single Switch Configuration
The second switch was moved back to CARME
so AIDA has been configured back to using
a single switch
510
Tue Jul 5 08:53:20 2022
TD
To Do
In no particular order
509
Wed Jun 29 10:48:26 2022
NH, OH
AIDA Dismounted
All detectors removed from single and triple
AIDA snouts
508
Tue Jun 28 10:11:35 2022
OH, NH
MIDAS Data Aq V10
11:11 Rebooted FEEs and changed aidacommon
in /MIDAS/linux-ppc_4xx/startup to point
to the new V10 DataAq that Patrick produced
507
Tue Jun 28 09:37:19 2022
NH
Tues 28 June 08:00-
Experiment over
10:37 - Stop DAQ & Tape
506
Mon Jun 27 23:11:47 2022
TD
Tuesday 28 June 00:00-08:00
00:07 Zero stats & all histograms
ASIC settings 2021Apr29-13-16-00
30x
505
Mon Jun 27 17:03:09 2022
MA
Monday 27th June 16:00-00:00
16:00 Took over the shift from OH no beam
yet.
18:00 Still no beam yet.
6x
504
Mon Jun 27 06:45:22 2022
OH
Monday 27th June 08:00-16:00
07:45 Spoke to David and the beam has been
gone since about 05:30
Reason for the loss of beam is a vacuum
503
Sun Jun 26 23:04:30 2022
Marc
new shift - Monday 27 June 0:00 to 8:00
0:00 Experiment continues to run smoothly.
AIDA DAQ has been rather stable. Leakage
current has gone up for the past two days
12x
502
Sun Jun 26 08:51:20 2022
OH, NH
Sunday 26 June 08:00-24:00
09:51 Taken over from Tom following the night
shift
Experiment is still running smoothly
27x
501
Sat Jun 25 22:48:57 2022
TD
Sunday 26 June 00:00-08:00
23.43 Check ASIC control
Zero stats & all histograms
30x
500
Sat Jun 25 17:06:42 2022
BA, AA
Saturday 25 June 2022 16:00-00:00
Took over the night shift from Magda
18:00 : attachments 1-3
9x
499
Sat Jun 25 06:55:07 2022
MS
Saturday 25 June 2022 8:00-16:00
Took over the night shift from Tom.
7:00 The beam is back.
8:00 : attachments 1-3
15x
498
Fri Jun 24 22:36:45 2022
TD
Saturday 25 June 00:00-08:00
23:36 Check ASIC contorol
Zero stats & all histograms
31x
497
Fri Jun 24 15:04:06 2022
Marc
Friday 24th June - evening shift
16:05 - Last checked was at 15:30. (see
previous entry. All running smoothly.
Next wide check will be in about
11x
496
Fri Jun 24 06:56:06 2022
OH
Friday 24 June 008:00-16:00
07:56 Took over from AM. No issues reported
overnight
Stats ok - attachment 1
16x
495
Fri Jun 24 00:34:55 2022
AM
Friday 24 June 00:00-08:00
01:30 Attachments 1-5,
white rabbit and fpga timestamp failures,
otherwise all good
20x
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
...
34
,
35
,
36
Next
ELOG V3.1.4-unknown