Entry  Mon Mar 7 12:20:26 2022, NH, TD, AIDA Grounding Checks Mon 7 Mar 14x
Remove all DSSD ribbon cable braid ground from FEE64s to check n+n ground loops

Removing all on n+n side only and test resistance to ground: 4, 6 and 8 show continuity to ground, 2 shows no connection (braid ring terminal to copper
Entry  Sat Mar 5 10:43:45 2022, OH, NH, Grounding and noise tests 4th-5th March Summary 13x
Tests performed


After leaving overnight noticed the pulser was not fully inserted into aida09

Little change in rates
observed in 9 but otherwise nothing else


Connected bias of aida02 (n+n ground) to aida06 (n+n ground) and likewise 4-8

No
change observed in rates


Also tested covering the snout in light tight material

No Changes


Unplugged
Entry  Fri Mar 4 08:40:36 2022, OH, NH, AIDA Noise and grounding tests 3rd March - Results 9x
Grounding implemented


Each FEE given direct connection to heavy duty earth bar via adaptor board lemo ground
Earth bars
are then connected to platform ground on AIDA frame
Photo of grounding - attachment 1
Improvements not as large as expected from
previous experience though

Particularly in the n+n side where widths still appear awful


While implementing the
Entry  Thu Mar 3 08:45:03 2022, OH, NH, AIDA Noise and grounding tests 3rd March 8x
Pulser spectra


Changes to the nn pulser circuit yesterday have improved the peak widths on the p+n side
p+n peak widths
averact around 100 channels
n+n around 1000 at 0xa threshold
n+n 1.8.L spectra - attachment 1
p+n 1.8.L spectra attachment
2


p+n peak widths




Entry  Wed Mar 2 16:00:01 2022, OH, NH, Noise tests - 2nd March 
An interesting find with the new sum inverter is that with the pulser at default settings the pulser peak on the n+n side is above the range of the ADC.
We have checked signals from the sum inverter and pulser and both are equal in magnitude.
We therefor determine it is over range as the charge is spread over 4 FEEs vs 12 on the p+n side.
Entry  Wed Mar 2 09:08:44 2022, OH, DAQ Status 2nd March 2022 220302_1002_goodevents.png220302_1002_white_rabbit.png220302_1003_merger.png220302_1003_merger_data_buffers.png220302_1004_merger_merge_time_errors.png
DAQ was found yesterday with none of the FEEs reporting any good events on any FEE - attachment 1
Temperature menu is still responsive and all FEEs report a temperature
Looking at the white rabbit timestamps aida09 has a gibberish timestamp - attachment 2
    Reply  Wed Mar 2 10:05:13 2022, OH, DAQ Status 2nd March 2022 
> DAQ was found yesterday with none of the FEEs reporting any good events on any FEE - attachment 1
> Temperature menu is still responsive and all FEEs report a temperature
> Looking at the white rabbit timestamps aida09 has a gibberish timestamp - attachment 2
Entry  Tue Mar 1 08:29:19 2022, OH, NH, Findings from the upgrade to centos7 from SL6 TapeServer.desktopScreenshot_from_2022-03-01_09-40-18.png
Required packages not included as default


csh (For running MIDAS scripts)
xinetd (Runs the rdate server for the FEEs)
Telnet
(Communication with the FEEs)
dhcp


Configuration changes


FEEs uses NFS2 which is no longer enabled by
default

Must edit config in /etc/nfs.conf to uncomment the following lines:

[nfsd]
vers2=y




/etc/xinetd.d/time-stream
Entry  Wed Feb 16 10:32:52 2022, PJCS, AIDA software changes and some suggestions 
The Pi console monitor program now outputs a full date/time to file for each line of report.

The System Wide Checks has been upgraded to include a check of the PLL lock monitor counters. A baseline is taken when the software starts, or
at the users command, then subsequent operation of the command compares the current counter value with the baseline. There are two PLLs on the pcb, LMK3200,
Entry  Fri Feb 11 12:09:24 2022, NH, Fri 11 Feb AIDA Work 
Use beam break between FRS experiments to finalise getting AIDA testable for PJCS etc.

USB hubs reconnected - all 16 ttyUSBs seem to be visible now
Entry  Tue Feb 1 15:00:28 2022, NH, AIDA CentOS 7 Startup 
Starting up AIDA on CentOS 7 to confirm things work (based on some CARME experience)

NFS settings:
Entry  Fri Oct 29 23:00:04 2021, NH, Ground cable information 
For future refinement of the AIDA ground cables using copper bus bar or similar:

Thin cable (from AIDA FEEs to common connection point)
Entry  Fri Oct 29 10:49:01 2021, OH, Noise tests - 28th October -29th October 24x
Plan for the day was to connect a mechanical ground to the FEEs connected to DSSD0 1, 2, 3, 4, 9, 10, 11 and 12

This was done by connecting thick copper cable to the mechanical ground wires on the AIDA frame (These ground wires are connected to the platform ground
Entry  Wed Oct 27 15:12:50 2021, OH, NH, Noise tests - 27th October 6x
 Began by installing the triple.
Only the upstream detector was connected to the FEEs the downstream detector cables were left loose. The two detectors are isotolated though.
Entry  Thu Oct 21 16:18:51 2021, OH, FEE and Adaptor board groundings 
During investigations into the noise today by NH and OH a couple of findings were made on the grounding of the FEEs and Adaptor boards.

- The adaptor boards have no connection to the FEE ground over the ERNI connector
    Reply  Tue Oct 26 16:08:46 2021, NH, FEE and Adaptor board groundings 
> During investigations into the noise today by NH and OH a couple of findings were made on the grounding of the FEEs and Adaptor boards.

> - The adaptor boards have no connection to the FEE ground over the ERNI connector
Entry  Thu Oct 21 09:33:08 2021, OH, Noise tests - 21st Oct 2021 211021_0951_fee8_x8L.png211021_0953_fee14waveform_zoom.png211021_0956_fee14_waveform.png211021_0957_fee8_x8L.png211021_0959_fee8_waveform_zoom.png
Pulser was left on overnight with the bias filters on
First plot is FEE14 not FEE8
Entry  Thu Oct 21 09:08:41 2021, OH, MIDAS start up messages 8015Startup.txt8115startuptapestart.txtmergerstart.txtdatarelay.txt
 
Entry  Wed Oct 20 13:26:08 2021, NH, OH, AIDA Noise + Filtering 6x
Turn on AIDA (SL6) to investigate noise situation and impact of new RC filters on bias input

Current setup:
Entry  Tue Oct 19 16:17:49 2021, OH, AIDA-gsi server to centos 7  
Following advice of CU have updated the server to centos 7.

To do this a new 500GB SSD was purchased and installed in the enclosure and a clean install of centos7 was installed to this.
Entry  Mon Oct 18 14:20:32 2021, OH, Top bar launchers 
launcher1
TclHttpd @8015 for AIDA
/MIDAS/Linux/startup/HTTPD
Entry  Mon Oct 18 13:03:23 2021, OH, DHCPd.conf backup dhcpd.conf
 