  ID Date Author Subject Text Attachments
  414   Fri Apr 8 08:59:42 2022 OH, NHFriday 8th April09:59 Noticed that the right hand ribbon cable
for aida07 was offset vertically by 1. i.e.
Only 1 of the 2 rows of pins in. Unbiassed
 11x 
  413   Thu Apr 7 12:42:14 2022 OH, NH, TDThursday 7 April
Re-assembled triple snout re-installed on
the AIDA stand - DSSSD ribbon cables and
 8x 
  412   Wed Apr 6 10:09:21 2022 OH, NH, TDWednesday 6 AprilDSSSD bias OFF. DAQ STOPped

Attachment 6 FEE64 temps OK
 6x 
  411   Tue Apr 5 12:46:52 2022 TDMSL type BB18(DS)-1000 triple - cable lengths
OH/NH disassembling current AIDA triple snout
and DSSSD stack.
  
  410   Tue Apr 5 08:52:16 2022 TDTuesday 5 AprilDSSSD bias OFF. DAQ STOPped

Attachment 1 FEE64 temps OK
 6x 
  409   Mon Apr 4 09:19:49 2022 TDMonday 4 AprilAIDA adaptor PCB config - all LKs removed
*except*
 12x 
  408   Sun Apr 3 10:56:11 2022 TDSunday 3 April
all system wide checks OK *except* aida10
failed ADC calibration
 35x 
  407   Sat Apr 2 10:42:49 2022 TDSaturday 2 April11.10 Found aida08 not running - merger/TapeServer
stalled
 21x 
  406   Wed Mar 9 10:15:56 2022 NH TDWednesday 9 March - noise tests contd.11.15 - S4 is currently closed no access

If access possible (should be) plan is
 38x 
  405   Tue Mar 8 10:26:56 2022 TD NHTuesday 8 March 2022
11.25 System wide checks OK except aida06
clock fail status 6 - attachments 1-13
 40x 
  404   Mon Mar 7 12:20:26 2022 NH, TDAIDA Grounding Checks Mon 7 MarRemove all DSSD ribbon cable braid ground
from FEE64s to check n+n ground loops
 14x 
  403   Sat Mar 5 10:43:45 2022 OH, NHGrounding and noise tests 4th-5th March SummaryTests performed


After
leaving overnight noticed the pulser was
not fully inserted into aida09

Little
 13x 
  402   Fri Mar 4 08:40:36 2022 OH, NHAIDA Noise and grounding tests 3rd March - ResultsGrounding implemented


Each
FEE given direct connection to heavy duty
earth bar via adaptor board lemo ground
Earth
 9x 
  401   Thu Mar 3 08:45:03 2022 OH, NHAIDA Noise and grounding tests 3rd MarchPulser spectra


Changes
to the nn pulser circuit yesterday have improved
the peak widths on the p+n side
p+n
 8x 
  400   Wed Mar 2 16:00:01 2022 OH, NHNoise tests - 2nd MarchAn interesting find with the new sum inverter
is that with the pulser at default settings
the pulser peak on the n+n side is above
  
  399   Wed Mar 2 10:05:13 2022 OHDAQ Status 2nd March 2022> DAQ was found yesterday with none of the
FEEs reporting any good events on any FEE
- attachment 1
  
  398   Wed Mar 2 09:08:44 2022 OHDAQ Status 2nd March 2022DAQ was found yesterday with none of the FEEs
reporting any good events on any FEE - attachment
1
 220302_1002_goodevents.png220302_1002_white_rabbit.png220302_1003_merger.png220302_1003_merger_data_buffers.png220302_1004_merger_merge_time_errors.png 
  397   Tue Mar 1 08:29:19 2022 OH, NHFindings from the upgrade to centos7 from SL6Required packages not included as default


csh
(For running MIDAS scripts)
xinetd
(Runs the rdate server for the FEEs)
Telnet
 TapeServer.desktopScreenshot_from_2022-03-01_09-40-18.png 
  396   Wed Feb 16 10:32:52 2022 PJCSAIDA software changes and some suggestionsThe Pi console monitor program now outputs
a full date/time to file for each line of
report.
  
  395   Fri Feb 11 12:09:24 2022 NHFri 11 Feb AIDA WorkUse beam break between FRS experiments to
finalise getting AIDA testable for PJCS etc.
  