AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 20 of 35  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed May 19 18:50:01 2021, LS, Wednesday 19th May 20:00 to 24:00 21x
20.00
Stats okay (Fig 1)
Analysed R14_762 deadtimes are okay (Fig 2)
Entry  Wed May 19 14:54:36 2021, CB, Wednesday 19 May 16:00 - 20:00 11x
15:55 Took over from OH

16:00
Entry  Wed May 19 11:24:55 2021, RDP, Monday 19 April 12 noon shift Screenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(3).pngScreenshot_2021-04-19_Tape_Service_(Expert)_aidas-gsi.png62.png
System checks gave 11 passed/1 failed, except for ADC timimgs: 10 passed/2 failed.

FEE64 module aida09 global clocks failed, 6
Entry  Wed May 19 09:12:52 2021, Muneerah, Betool, LS, 17th May 00:00-12:00 17x
Auther: Muneerah and Betool
02:00 The dead time have been checked every 30 min from the start of the shift, it seemes Ok
      Statistics ok - 210517_0202_Stats
Entry  Wed May 19 09:09:27 2021, MS, JS, OH, May 16 08:00-24:00 21x
16th May 08:00 - 12:00 shift
Author: MS
Entry  Wed May 19 09:06:58 2021, CA, May 16th 00:00 - 08:00 16x
16th May 2021 - 00:00 - 08:00 Shift
Author: CA
Entry  Wed May 19 06:59:33 2021, OH, Wednesday 19th May 08:00 - 16:00 9x
08:00 OH Takes over for CA
      Thresholds 0xc for p+n and 0x19 for n+n ASICs 1-3 and 0x64 for n+nASIC4
Entry  Tue May 18 23:11:40 2021, CA, Wednesday May 19th 00:00 - 08:00 14x
00:00 CA takes over
      LS has performed usual checks, see previous Elog entry - all ok
Entry  Tue May 18 18:47:25 2021, LS, Tuesday 18th May 20:00 - 24:00 24x

19.50
Stats okay (Fig 1)
Entry  Tue May 18 14:57:43 2021, CB, Tuesday 18th May 16:00 - 20:00 11x
15:58 Took shift over from OH and PP

Stats OK - attach 1
Entry  Tue May 18 06:50:53 2021, OH, PP, Tuesday 18th May 08:00 - 16:00 6x
08:00 OH Takes over

      Statistics still look good from yesterday. Rate is still down.
Entry  Mon May 17 23:17:16 2021, DSJ, Tuesday 18 May 0.00-8.00 shift 39x
0.00 - Taking over from Lewis 

00.30 - Rates look ok (fig1), Ran R14_147 through analyser, dead times all good (fig2)

01.00 - Rates look ok (Fig3), Ran R14_153 through analyser, dead times all good (fig4)
Entry  Mon May 17 19:05:23 2021, LS, Monday 17th May 20.00-24.00 21x
20.30
Checked stats, seem okay (Fig 1)
Ran R14_99 through analyser, dead times all good (Fig 2)
Entry  Mon May 17 15:14:35 2021, LJW, Monday 17th May 2021 16:00-20:00 9x
16:25

Informed at shift handover that there has been no beam.

Statistics  - See attachment 1
Entry  Fri May 14 19:01:09 2021, JS, Friday 14th May 20:00-00:00 27x
20:00 Taking over from CB

20:33 Doing full checks.
Entry  Fri May 14 17:30:56 2021, TD, Analysis of S496 files R5_18, R5_32 & R5_45 R5_18R5_32R5_45

S496/R5_18 - attachment 1
Entry  Fri May 14 14:57:32 2021, CB + OH, TD, NH, Friday 14th May 16:00-20:00 33x
16:00 Shift taken over from CA

16:00 
Entry  Fri May 14 07:05:08 2021, CA, Friday 14th May 08:00 - 16:00 shift 24x
08:00 CA takes over

08:28 Problem at UNILAC - no beam
Entry  Thu May 13 23:58:05 2021, OH, Friday 14th May 00:00 - 08:00 21x
00:00 OH Takes over.
 PULSER SETTINGS
---------------------------
Entry  Thu May 13 21:21:25 2021, Philippos and Marc, system wide checks 13x
Wide checks at Time 22:22 CET

Clock status test result: Passed 16, Failed 0

Understand status as follows
ELOG V3.1.3-7933898