AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  DESPEC, Page 24 of 37  ELOG logo
  ID Date Authordown Subject Text Attachments
  293   Tue May 4 14:26:50 2021 NHFEE64 Adapter wiring diagram and layoutA figure showing the FEE64 numbers (a previous
diagram had 2/6 and 4/8 on the wrong side
of the DSSD) and the wiring of pulser/HV
 AIDA_Adapter_Configuration(1).png 
  299   Fri May 7 13:11:22 2021 NHFriday 7th May14:11 - Alpha has been running most of morning

Just saw rates in tape spike to 6 MB/s...
 elog_locks.pngelog_temps.pngelog_rates.pngelog_rates1.pngaida13.txt 
  304   Mon May 10 11:45:15 2021 NHConfusing behaviour of rates Testing the behaviour of powering down the
fast ADCs in aida01 (the hot FEE)
  
  334   Wed May 19 20:02:27 2021 NHAIDA Dead Time AnalysisSome plots of AIDA dead time (From PAUSE/RESUME
data items) against time.
 6x 
  372   Mon Jun 21 10:21:50 2021 NHMonday 21 June11.21 - DAQ continues OK (no storage mode)

11.21 - System checks ok *except*
 8x 
  373   Tue Jun 22 13:01:19 2021 NHAIDA Data on lustreThe following runs are now copied to lustre
If necessary they can be removed from AIDA
HDDs for space.
  
  374   Mon Jul 5 14:36:15 2021 NHMonday 5 JulyAIDA Unbiased and powered down
All FEEs were running before stoppage. None
had rebooted.
  
  389   Tue Oct 26 16:08:46 2021 NHFEE and Adaptor board groundings> During investigations into the noise today
by NH and OH a couple of findings were made
on the grounding of the FEEs and Adaptor
  
  392   Fri Oct 29 23:00:04 2021 NHGround cable informationFor future refinement of the AIDA ground cables
using copper bus bar or similar:
  
  393   Tue Feb 1 15:00:28 2022 NHAIDA CentOS 7 StartupStarting up AIDA on CentOS 7 to confirm things
work (based on some CARME experience)
  
  395   Fri Feb 11 12:09:24 2022 NHFri 11 Feb AIDA WorkUse beam break between FRS experiments to
finalise getting AIDA testable for PJCS etc.
  
  416   Thu Apr 28 18:45:09 2022 NHAlpha Background Run Runs are in /TapeData/BGAPR22 located on 8TB
disk "SecondDrive" (N.B. 2A experiment is
using ThirdDrive)
 AnyDeskMSI_2022-04-28_19-47-33.pngAnyDeskMSI_2022-04-28_19-47-56.pngAnyDeskMSI_2022-04-28_19-48-13.png 
  418   Mon May 2 13:08:49 2022 NHAIDA Updates 2 MayThe snout endcap has been sealed with new
copper tape over the red tape
 elog_temps1.pngalpha_1d.png 
  419   Tue May 3 14:15:17 2022 NHAIDA Updates 2 May
PAUSE/RESUME stats are dominated by 2x FEE64s
- aida07 and aida16
  
  420   Wed May 4 16:50:04 2022 NHAIDA 4th MaybPlas has been mostly cabled in now

Reseat LAN cable (AIDA Switch -> AIDA-3)
 Screenshot_20220504_174929.pngScreenshot_20220504_175201.png 
  425   Sun May 8 17:43:57 2022 NHAIDA FEE64 LayoutAIDA FEE64 layout with respect to the beam.  AIDA_Adapter_Configuration(1).png 
  472   Tue May 24 08:35:00 2022 NHTue 24 May09:00 - Remove bias of DSSDs  and pwoer of
FEEs
  
  473   Wed May 25 14:28:26 2022 NHWed 25 MayThe n+n FEEs were all removed to adjust the
platform back to the single configuration
 aida_single_alu.jpg 
  478   Wed Jun 8 09:55:28 2022 NHWeds 8 May10.30 : Turn off AIDA FEE64s 

        Prepare a ground cable for snout
 2022-06-08_14-48-21_goodevents.pngrn_image_picker_lib_temp_97373248-bdea-4864-b8a9-a13d0d016e30.jpg 
  479   Fri Jun 10 10:32:46 2022 NHFri 10 JunProbe PSU output with 'scope again and 10X
probe
 8x 
ELOG V3.1.3-7933898