ID |
Date |
Author |
Subject |
Text |
 |
165
|
Fri Feb 12 17:31:04 2021 |
NH | Background run | A background run has been started to check
the AIDA channels.
It is in /TapeData/BGFEB21
|
|
164
|
Sat Feb 6 10:45:55 2021 |
NH | AIDA Status Feb 2021 | > 01.02.2021 - Four new sets of PSU, HDMI
& Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for |
   |
163
|
Mon Feb 1 15:19:07 2021 |
NH | AIDA Status Feb 2021 | 01.02.2021 - Four new sets of PSU, HDMI &
Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for |
|
162
|
Tue Nov 24 13:10:42 2020 |
NH | Waveforms with frame grounded | AIDA Frame is now grounded to platform (will
add photo later)
|
   |
161
|
Tue Oct 6 15:48:06 2020 |
NH | nnrpi kernel update | FYI:
The SD card on nnrpi2 was full again causing |
|
160
|
Tue Jul 7 08:50:27 2020 |
NH | nnrpi2 does not boot | MIDAS was not working properly on nnrpi2 -
power cycled. Now system does not boot properly,
it gets stuck trying to login claiming "PAM |
|
159
|
Tue Jul 7 08:04:57 2020 |
NH | Power failure in Messhuette | Last week there was a power failure in Messhuette
(FRS control room) - AIDA-3 and MBS were
affected.
|
|
157
|
Wed Mar 18 18:02:37 2020 |
PJCS | New Firmware loaded in all FEE64s | Loaded new frimware into all 12 FEE64s
in the system. IWR_Dec19_4.bin
Booted ok after power-cycle. |
|
156
|
Mon Mar 16 07:25:24 2020 |
NH | End of Experiment | 08:25 Beam Stopped, end of S480
Tape Server stopped at R12_2097
Started again in no storage mode |
|
155
|
Mon Mar 16 05:08:12 2020 |
TA, AM, ES | Regular entry |
02:14 all system wide checks okay
FEE temperatures okay
leakage
currents okay and recorded to spreadsheet |
6x |
154
|
Mon Mar 16 01:07:29 2020 |
TA, AM, ES | Regular entry |
02:14 all system wide checks okay
FEE temperatures okay
leakage
currents okay and recorded to spreadsheet |
13x |
153
|
Sun Mar 15 06:45:00 2020 |
CA, LS, CG | Sunday 15th March 08:00 - 24:00 | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
35x |
152
|
Sat Mar 14 23:09:28 2020 |
MB, SJ, MR | Sunday 15th March 0:00-8:00 | AIDA ELog filled out by DESPEC night shift
members Matthew Brunet (MB), Shaheen Jazrawi
(SJ), and Matthias Rudiger (MR). |
16x |
151
|
Sat Mar 14 07:13:59 2020 |
DK, TD, LS, CG | Saturday 14th March 08:00 - 24:00 | 8:15
All system wide checks passed
Leak currents are continuing to creep |
41x |
150
|
Fri Mar 13 23:06:39 2020 |
CA, OH | Saturday 14th March 00:00 - 08:00 | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
19x |
149
|
Fri Mar 13 15:48:11 2020 |
Friday 13th 16:00 - 24:00 | OH, TD | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
11x |
148
|
Fri Mar 13 08:01:53 2020 |
DK | Friday 13th 8:00 to 16:00 shift | 8:00 - See previous shift's elog entry. All
good.
|
8x |
147
|
Thu Mar 12 23:44:48 2020 |
DK | PID Plots | Labelled PID plots. Note that the A/Q calibration
is shifted by +0.02 units, and Z calibration
is offset by about +5.
|
  |
146
|
Thu Mar 12 23:04:24 2020 |
LS, DK | Friday 13th 00:00 to 08:00 shift | Shift file starting R9_639
system wide checks okay
|
20x |
145
|
Thu Mar 12 15:25:08 2020 |
Thursday, March 12 16:00 to midnight shift | CA, DK, LS | 16:30
All system wide checks passed
Temps shown in attachment #1
|
12x |