ID |
Date |
Author |
Subject |
Text |
 |
684
|
Thu Jan 9 12:46:43 2025 |
JB, MP, CC | AIDA timing test |
|
   |
681
|
Wed Jan 8 10:08:29 2025 |
JB, GB, SD, MP, CC, JG | AIDA noise test with platform in position | Yesterday we spent time essentially performing
a dry run to get AIDA DAQ and bPlast into
the time sorter, there were some issues with |
   |
699
|
Thu Feb 20 17:06:42 2025 |
JB, CC, TD,MP | WR error for aida 13,14,15,16 | WR timestamp errors resolved after reseating
the HDMI cables to the MACB |
|
531
|
Fri Mar 8 16:05:57 2024 |
JB, CC, TD, NH | Friday 8 March | Bias tests of AIDA on individual wafers
and in parallel. Spreadsheet can be found
in attachment 1, and graphic results can |
  |
566
|
Mon Apr 8 16:39:00 2024 |
JB, CC, TD | Monday 8 April |
17.32 Power and detector bias cycle
|
11x |
570
|
Wed Apr 10 08:37:57 2024 |
JB, CC, TD | Wednesday 10 April |
09.38 CC completed install of Bplast driver
PCBs yesterday evening.
|
47x |
580
|
Fri Apr 19 13:52:34 2024 |
JB, CC, TD | Friday 19 April contd. |
12.00 Replaced AIDA ASIC mezzanine of aida01
to fix issue with asic #3
|
23x |
630
|
Tue May 7 13:25:00 2024 |
JB, CC, NH, HMA | Tuesday 6 May - dismount snout | Status before dismount
14:26 DSSSD#1 119.99 V @ 17.968
uA |
 |
555
|
Tue Apr 2 12:36:25 2024 |
JB, CC, NH | Installing FEE64s of DSSSD2 cont. | Some additional checks
- check 'top
hat' electrical isolators are correctly |
|
685
|
Thu Jan 9 15:43:17 2025 |
JB, CC, MP | Timing test platform moved in | 16:30 We moved the platform in. The system
was still biased and the DAQ was still running.
The system seems to be okay, temperatures |
  |
572
|
Thu Apr 11 22:04:50 2024 |
JB | 12.04.2024 AIDA-bPlast noise optimisation | 15:00 Platform in, biasing detector. Temp
OK Attachment 1. test - Pulser OFF.
|
    |
573
|
Sat Apr 13 14:04:44 2024 |
JB | 13 April Noise checks | 15:04 bPlast was left powered over night.
Powering up to check noise conditions - also
to check shifting of Germanium baseline (no |
9x |
669
|
Wed Aug 14 12:40:11 2024 |
JB | Repaired DSSSD delivery 14.09.2024 | Three BB18-1000 triples AIDAs collected
on 14.09.2024
Find attached visual of the wafer |
11x |
696
|
Fri Jan 31 13:48:29 2025 |
JB | AIDA analysis from HI-DESPEC meeting 20.11.2024 | AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting. |
|
529
|
Thu Mar 7 11:09:05 2024 |
HA, JB, CC, TD, MG | Thursday 7 March |
Snout assembly
|
|
703
|
Thu Jun 12 13:15:25 2025 |
GB, CC, NK, MP, TD | Thursday 12 June 2025 |
EMC tests with NK (Orsay)
|
 |
149
|
Fri Mar 13 15:48:11 2020 |
Friday 13th 16:00 - 24:00 | OH, TD | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
11x |
661
|
Thu Jun 13 23:04:01 2024 |
Dan Judson, TD | 0.00-8.00 14/6/24 | 0.00 checks - all looks ok
Voltage/currents - attachment 1
Rates attachment 2 + 3 |
40x |
647
|
Mon Jun 10 07:15:48 2024 |
Dan | 08.00-16.00 Monday 10th June | 8am checks
temps ok - attachment 2
rates ok - attachment 8 |
50x |
231
|
Fri Apr 16 15:52:08 2021 |
DSJ | 16 April 16.00 shift | Clock status test result: Passed 12, Failed
0
|
12x |
|