AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 31 of 35  ELOG logo
ID Date Authordown Subject Text Attachments
  140   Tue Mar 10 23:17:31 2020 DK, LS, PW, TD, CAWednesday 11 March 202000:15 Shift change near AIDA R6_475

  We continue with spill cycles around 0.2
 43x 
  147   Thu Mar 12 23:44:48 2020 DKPID PlotsLabelled PID plots.  Note that the A/Q calibration
is shifted by +0.02 units, and Z calibration
is offset by about +5.
 pid.pngpid.pngpid.pdf 
  148   Fri Mar 13 08:01:53 2020 DKFriday 13th 8:00 to 16:00 shift8:00 - See previous shift's elog entry.  All
good.
 8x 
  236   Sat Apr 17 19:39:56 2021 DJ, TDSaturday 17 April 20.00-00.00
19.37 per FEE64 rate spectra - attachments
1 & 2
 13x 
  238   Sun Apr 18 07:30:20 2021 DJ, TDSunday 18th April 08:00-12:00---- 09-26
FEE64 module aida06 failed
FEE64 module aida07 failed
 7x 
  263   Thu Apr 22 23:17:46 2021 DJ Friday 23rd April 00:00-08:00Took over from TD ... All is well.

00:45 System Wide Checks

Clock: 12 passed, 0 failed.
 27x 
  695   Fri Jan 31 09:37:47 2025 CC, TD, MPFriday 31 JanuaryImplantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
 26x 
  697   Fri Jan 31 17:26:47 2025 CC, TD, MPFriday 31 January contd.
18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server
 16x 
  574   Mon Apr 15 09:23:43 2024 CC, JB, HMA, TDNoise in AIDA when connecting BB79:40 started up AIDA. TEMP OK. Noise condition
same as Saturday. Attachments 1-3.

9:56 BB7 premaps connected but
 13x 
  41   Tue Apr 2 07:39:44 2019 CB, TD, CATuesday 2nd April 201908:15 beam tuning in progress

08.30 System wide checks 
 36x 
  429   Wed May 11 19:08:41 2022 CB, PPWednesday 11th May - evening shift20:19 no beam yet.

Statistic check (screenshot attached).

Temperatures OK (screenshot attached).
 16.png22.png13.png14.png 
  308   Wed May 12 15:03:10 2021 CB, OHWed 12 16:00-20:0016:00 Shift change

Statistics OK (attach 1)
 15x 
  317   Fri May 14 14:57:32 2021 CB + OH, TD, NHFriday 14th May 16:00-20:0016:00 Shift taken over from CA

16:00 
 33x 
  249   Mon Apr 19 19:19:18 2021 CBMonday 19 April 20:00-24:00 shift20:19 
Statistics OK (attach 1)
No faults found
 11x 
  252   Tue Apr 20 10:54:41 2021 CBApril 20 12:00 - 16:00 shift11:55 CA got AIDA back online

12:00 Stats OK (attach 1)
 9x 
  324   Tue May 18 14:57:43 2021 CBTuesday 18th May 16:00 - 20:0015:58 Took shift over from OH and PP

Stats OK - attach 1
 11x 
  332   Wed May 19 14:54:36 2021 CBWednesday 19 May 16:00 - 20:0015:55 Took over from OH

16:00
 11x 
  443   Fri May 13 15:00:23 2022 CB13 March - 16:00-24:00 shift16:00 Took over remotely from OH, TD who remain
in GSI
 10x 
  142   Wed Mar 11 17:21:33 2020 CA, TD, OHWednesday 11 March 16.00-00.0018.25 DAQ currently running No Storage mode

ASIC settings 2019Oct31-13.24.23
 23x 
  15   Wed Jan 23 08:12:01 2019 CA, TD, NH, VPJanuary 22nd 2019Attachment 1 - 1.8.W waveform spectra with
pulser signal
 220119_18W.png220119_pulserpeaks.png220119_stats.png220119_Temp.png 
ELOG V3.1.4-unknown