AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  DESPEC, Page 32 of 37  ELOG logo
Entry  Thu Apr 11 22:04:50 2024, JB, 12.04.2024 AIDA-bPlast noise optimisation Screenshot_from_2024-04-12_15-11-18.pngScreenshot_from_2024-04-12_15-22-54.pngScreenshot_from_2024-04-12_15-22-26.pngScreenshot_from_2024-04-12_18-07-35.pngScreenshot_from_2024-04-12_18-07-27.png
15:00 Platform in, biasing detector. Temp OK Attachment 1. test - Pulser OFF.

           Rates somewhat worse than last night - probable contact on grounding of snout. Attachment
3.
Entry  Sat Apr 13 14:04:44 2024, JB, 13 April Noise checks 9x
15:04 bPlast was left powered over night. Powering up to check noise conditions - also to check shifting of Germanium baseline (no change observed).

          TEMP OK.

          Noise condition the same as yesterday when platform was moved in. Noise in aida01 and
Entry  Wed Aug 14 12:40:11 2024, JB, Repaired DSSSD delivery 14.09.2024 11x
Three BB18-1000 triples AIDAs collected on 14.09.2024

Find attached visual of the wafer and bond wire + factory bias tests accompanying the DSSSDs. elog:669/1
elog:669/2 elog:669/3
Entry  Fri Jan 31 13:48:29 2025, JB, AIDA analysis from HI-DESPEC meeting 20.11.2024 
AIDA analysis and presentation by J. Bormans for AIDA made in the HISPEC-DESPEC collaboration meeting.

 

https://docs.google.com/presentation/d/1hlZ30r294UqbVKGy3jg-wompFpc7TSfD/edit?usp=sharing&ouid=102131181856760114019&rtpof=true&sd=true
Entry  Thu Mar 7 11:09:05 2024, HA, JB, CC, TD, MG, Thursday 7 March 

Snout assembly
Entry  Thu Jun 12 13:15:25 2025, GB, CC, NK, MP, TD, Thursday 12 June 2025 Screenshot_from_2025-06-12_14-39-35.pngScreenshot_from_2025-06-12_14-33-26.png

EMC tests with NK (Orsay)
Entry  Fri Mar 13 15:48:11 2020, Friday 13th 16:00 - 24:00, OH, TD 11x
ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
Entry  Thu Jun 13 23:04:01 2024, Dan Judson, TD, 0.00-8.00 14/6/24 40x
0.00 checks - all looks ok

Voltage/currents - attachment 1

Rates attachment 2 + 3
Entry  Mon Jun 10 07:15:48 2024, Dan, 08.00-16.00 Monday 10th June 50x
8am checks

temps ok - attachment 2

rates ok - attachment 8
Entry  Fri Apr 16 15:52:08 2021, DSJ , 16 April 16.00 shift 12x
Clock status test result: Passed 12, Failed 0

Understand status as follows
Entry  Fri Apr 23 15:13:28 2021, DSJ, 23 April 16.00-20.00 shift 6x
16:00 taking over from Muneerah

16:15 - temp, ucesb, database, stats etc. look ok.

16:41 - Nic restarting MBS
Entry  Mon May 17 23:17:16 2021, DSJ, Tuesday 18 May 0.00-8.00 shift 39x
0.00 - Taking over from Lewis 

00.30 - Rates look ok (fig1), Ran R14_147 through analyser, dead times all good (fig2)

01.00 - Rates look ok (Fig3), Ran R14_153 through analyser, dead times all good (fig4)
Entry  Mon Apr 22 15:17:07 2024, DSJ, 16.00-0.00 22/04/24 26x
First checks of shift. All looks ok.

Screenshot of HV, temps, rates, Merger attached. Attachments 1-4.

Screenshots of all spectrum Layout IDs taken before zeroing at 16.35. (Attachments 5-12)
Entry  Sat Mar 14 07:13:59 2020, DK, TD, LS, CG, Saturday 14th March 08:00 - 24:00 41x
8:15
    All system wide checks passed
    Leak currents are continuing to creep up - attachment #1
Entry  Sat Dec 7 02:39:02 2019, DK, NH et al., 34Si Fragments PID 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp
See attached

Tentative PID (DK) as attachment #3
Entry  Tue Mar 10 23:17:31 2020, DK, LS, PW, TD, CA, Wednesday 11 March 2020 43x
00:15 Shift change near AIDA R6_475

  We continue with spill cycles around 0.2 Hz or one beginning once each ~5 seconds.
Entry  Thu Mar 12 23:44:48 2020, DK, PID Plots pid.pngpid.pngpid.pdf
Labelled PID plots.  Note that the A/Q calibration is shifted by +0.02 units, and Z calibration is offset by about +5.

There was an error in the printouts for Cd isotopes, but the below attachments are corrected.
Entry  Fri Mar 13 08:01:53 2020, DK, Friday 13th 8:00 to 16:00 shift 8x
8:00 - See previous shift's elog entry.  All good.

9:00
Entry  Sat Apr 17 19:39:56 2021, DJ, TD, Saturday 17 April 20.00-00.00 13x

19.37 per FEE64 rate spectra - attachments 1 & 2
      1.8.L spectra - attachments 3 & 4
Entry  Sun Apr 18 07:30:20 2021, DJ, TD, Sunday 18th April 08:00-12:00 7x
---- 09-26
FEE64 module aida06 failed
FEE64 module aida07 failed
ELOG V3.1.3-7933898