Thu Jun 12 13:15:25 2025, GB, CC, NK, MP, TD, Thursday 12 June 2025 
|
EMC tests with NK (Orsay)
|
Fri Mar 13 15:48:11 2020, Friday 13th 16:00 - 24:00, OH, TD 11x
|
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
Thu Jun 13 23:04:01 2024, Dan Judson, TD, 0.00-8.00 14/6/24 40x
|
0.00 checks - all looks ok
Voltage/currents - attachment 1
Rates attachment 2 + 3 |
Mon Jun 10 07:15:48 2024, Dan, 08.00-16.00 Monday 10th June 50x
|
8am checks
temps ok - attachment 2
rates ok - attachment 8 |
Fri Apr 16 15:52:08 2021, DSJ , 16 April 16.00 shift 12x
|
Clock status test result: Passed 12, Failed 0
Understand status as follows
|
Fri Apr 23 15:13:28 2021, DSJ, 23 April 16.00-20.00 shift 6x
|
16:00 taking over from Muneerah
16:15 - temp, ucesb, database, stats etc. look ok.
16:41 - Nic restarting MBS |
Mon May 17 23:17:16 2021, DSJ, Tuesday 18 May 0.00-8.00 shift 39x
|
0.00 - Taking over from Lewis
00.30 - Rates look ok (fig1), Ran R14_147 through analyser, dead times all good (fig2)
01.00 - Rates look ok (Fig3), Ran R14_153 through analyser, dead times all good (fig4) |
Mon Apr 22 15:17:07 2024, DSJ, 16.00-0.00 22/04/24 26x
|
First checks of shift. All looks ok.
Screenshot of HV, temps, rates, Merger attached. Attachments 1-4.
Screenshots of all spectrum Layout IDs taken before zeroing at 16.35. (Attachments 5-12) |
Sat Mar 14 07:13:59 2020, DK, TD, LS, CG, Saturday 14th March 08:00 - 24:00 41x
|
8:15
All system wide checks passed
Leak currents are continuing to creep up - attachment #1
|
Sat Dec 7 02:39:02 2019, DK, NH et al., 34Si Fragments PID   
|
See attached
Tentative PID (DK) as attachment #3
|
Tue Mar 10 23:17:31 2020, DK, LS, PW, TD, CA, Wednesday 11 March 2020 43x
|
00:15 Shift change near AIDA R6_475
We continue with spill cycles around 0.2 Hz or one beginning once each ~5 seconds.
|
Thu Mar 12 23:44:48 2020, DK, PID Plots  
|
Labelled PID plots. Note that the A/Q calibration is shifted by +0.02 units, and Z calibration is offset by about +5.
There was an error in the printouts for Cd isotopes, but the below attachments are corrected.
|
Fri Mar 13 08:01:53 2020, DK, Friday 13th 8:00 to 16:00 shift 8x
|
8:00 - See previous shift's elog entry. All good.
9:00
|
Sat Apr 17 19:39:56 2021, DJ, TD, Saturday 17 April 20.00-00.00 13x
|
19.37 per FEE64 rate spectra - attachments 1 & 2
1.8.L spectra - attachments 3 & 4
|
Sun Apr 18 07:30:20 2021, DJ, TD, Sunday 18th April 08:00-12:00 7x
|
---- 09-26
FEE64 module aida06 failed
FEE64 module aida07 failed |
Thu Apr 22 23:17:46 2021, DJ , Friday 23rd April 00:00-08:00 27x
|
Took over from TD ... All is well.
00:45 System Wide Checks
Clock: 12 passed, 0 failed. |
Fri Jan 31 09:37:47 2025, CC, TD, MP, Friday 31 January 26x
|
Implantation stack mounted - BB18(DS)-1000 + bPlas + bPlas + 3x BB7(DS)-1000
N.B. aida02, aida09 & aida15 have grounded copper screen (3M 1245 - aluminimum braid to copper screen of ribbon cables) for Kapton PCBs connecting the |
Fri Jan 31 17:26:47 2025, CC, TD, MP, Friday 31 January contd. 16x
|
18.18 bPlas and BB7 installs complete
Restart AIDA DAQ, Merger, Tape Server and re-test
|
Fri Jun 13 12:42:39 2025, CC, TD, Friday 13 June 2025 10x
|
13.42 ASIC settings 2025Jun12-13.53.04
*all* FEE64s slow comparator 0x64
|
Tue Jul 22 18:00:45 2025, CC, NK, MP, FWHM aida FEE 
|
AIDA05 completely disconnected, all the others FEEs64 are fully connected
Attachment 1: aida05, FWHM= 95 ch, 63 keV
Attachment 2: aida15, FWHM= 108 ch, 74 keV |