AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 32 of 37  ELOG logo
Entry  Thu Jun 12 13:15:25 2025, GB, CC, NK, MP, TD, Thursday 12 June 2025 Screenshot_from_2025-06-12_14-39-35.pngScreenshot_from_2025-06-12_14-33-26.png

EMC tests with NK (Orsay)
Entry  Fri Mar 13 15:48:11 2020, Friday 13th 16:00 - 24:00, OH, TD 11x
ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
Entry  Thu Jun 13 23:04:01 2024, Dan Judson, TD, 0.00-8.00 14/6/24 40x
0.00 checks - all looks ok

Voltage/currents - attachment 1

Rates attachment 2 + 3
Entry  Mon Jun 10 07:15:48 2024, Dan, 08.00-16.00 Monday 10th June 50x
8am checks

temps ok - attachment 2

rates ok - attachment 8
Entry  Fri Apr 16 15:52:08 2021, DSJ , 16 April 16.00 shift 12x
Clock status test result: Passed 12, Failed 0

Understand status as follows
Entry  Fri Apr 23 15:13:28 2021, DSJ, 23 April 16.00-20.00 shift 6x
16:00 taking over from Muneerah

16:15 - temp, ucesb, database, stats etc. look ok.

16:41 - Nic restarting MBS
Entry  Mon May 17 23:17:16 2021, DSJ, Tuesday 18 May 0.00-8.00 shift 39x
0.00 - Taking over from Lewis 

00.30 - Rates look ok (fig1), Ran R14_147 through analyser, dead times all good (fig2)

01.00 - Rates look ok (Fig3), Ran R14_153 through analyser, dead times all good (fig4)
Entry  Mon Apr 22 15:17:07 2024, DSJ, 16.00-0.00 22/04/24 26x
First checks of shift. All looks ok.

Screenshot of HV, temps, rates, Merger attached. Attachments 1-4.

Screenshots of all spectrum Layout IDs taken before zeroing at 16.35. (Attachments 5-12)
Entry  Sat Mar 14 07:13:59 2020, DK, TD, LS, CG, Saturday 14th March 08:00 - 24:00 41x
8:15
    All system wide checks passed
    Leak currents are continuing to creep up - attachment #1
Entry  Sat Dec 7 02:39:02 2019, DK, NH et al., 34Si Fragments PID 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp
See attached

Tentative PID (DK) as attachment #3
Entry  Tue Mar 10 23:17:31 2020, DK, LS, PW, TD, CA, Wednesday 11 March 2020 43x
00:15 Shift change near AIDA R6_475

  We continue with spill cycles around 0.2 Hz or one beginning once each ~5 seconds.
Entry  Thu Mar 12 23:44:48 2020, DK, PID Plots pid.pngpid.pngpid.pdf
Labelled PID plots.  Note that the A/Q calibration is shifted by +0.02 units, and Z calibration is offset by about +5.

There was an error in the printouts for Cd isotopes, but the below attachments are corrected.
Entry  Fri Mar 13 08:01:53 2020, DK, Friday 13th 8:00 to 16:00 shift 8x
8:00 - See previous shift's elog entry.  All good.

9:00
Entry  Sat Apr 17 19:39:56 2021, DJ, TD, Saturday 17 April 20.00-00.00 13x

19.37 per FEE64 rate spectra - attachments 1 & 2
      1.8.L spectra - attachments 3 & 4
Entry  Sun Apr 18 07:30:20 2021, DJ, TD, Sunday 18th April 08:00-12:00 7x
---- 09-26
FEE64 module aida06 failed
FEE64 module aida07 failed
Entry  Thu Apr 22 23:17:46 2021, DJ , Friday 23rd April 00:00-08:00 27x
Took over from TD ... All is well.

00:45 System Wide Checks

Clock: 12 passed, 0 failed.
Entry  Fri Jan 31 09:37:47 2025, CC, TD, MP, Friday 31 January 26x
Implantation stack mounted - BB18(DS)-1000 + bPlas + bPlas + 3x BB7(DS)-1000

N.B. aida02, aida09 & aida15 have grounded copper screen (3M 1245 - aluminimum braid to copper screen of ribbon cables) for Kapton PCBs connecting the
Entry  Fri Jan 31 17:26:47 2025, CC, TD, MP, Friday 31 January contd. 16x

18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server and re-test
Entry  Fri Jun 13 12:42:39 2025, CC, TD, Friday 13 June 2025 10x

13.42 ASIC settings 2025Jun12-13.53.04
      *all* FEE64s slow comparator 0x64
Entry  Tue Jul 22 18:00:45 2025, CC, NK, MP, FWHM aida FEE Screenshot_from_2025-07-22_18-59-26.pngScreenshot_from_2025-07-22_18-59-45.png
AIDA05 completely disconnected, all the others FEEs64 are fully connected

Attachment 1: aida05, FWHM= 95 ch, 63 keV

Attachment 2: aida15, FWHM= 108 ch, 74 keV
ELOG V3.1.3-7933898