| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
703
|
Thu Jun 12 13:15:25 2025 |
GB, CC, NK, MP, TD | Thursday 12 June 2025 |
EMC tests with NK (Orsay)
|
 |
|
|
149
|
Fri Mar 13 15:48:11 2020 |
Friday 13th 16:00 - 24:00 | OH, TD | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
11x |
|
|
661
|
Thu Jun 13 23:04:01 2024 |
Dan Judson, TD | 0.00-8.00 14/6/24 | 0.00 checks - all looks ok
Voltage/currents - attachment 1
Rates attachment 2 + 3 |
40x |
|
|
647
|
Mon Jun 10 07:15:48 2024 |
Dan | 08.00-16.00 Monday 10th June | 8am checks
temps ok - attachment 2
rates ok - attachment 8 |
50x |
|
|
231
|
Fri Apr 16 15:52:08 2021 |
DSJ | 16 April 16.00 shift | Clock status test result: Passed 12, Failed
0
|
12x |
|
|
267
|
Fri Apr 23 15:13:28 2021 |
DSJ | 23 April 16.00-20.00 shift | 16:00 taking over from Muneerah
16:15 - temp, ucesb, database,
stats etc. look ok. |
6x |
|
|
322
|
Mon May 17 23:17:16 2021 |
DSJ | Tuesday 18 May 0.00-8.00 shift | 0.00 - Taking over from Lewis
00.30 - Rates look ok (fig1), Ran
R14_147 through analyser, dead times |
39x |
|
|
588
|
Mon Apr 22 15:17:07 2024 |
DSJ | 16.00-0.00 22/04/24 | First checks of shift. All looks ok.
Screenshot of HV, temps,
rates, Merger attached. Attachments 1-4. |
26x |
|
|
151
|
Sat Mar 14 07:13:59 2020 |
DK, TD, LS, CG | Saturday 14th March 08:00 - 24:00 | 8:15
All system wide checks passed
Leak currents are continuing to creep |
41x |
|
|
105
|
Sat Dec 7 02:39:02 2019 |
DK, NH et al. | 34Si Fragments PID | See attached
Tentative PID (DK) as attachment #3
|
   |
|
|
140
|
Tue Mar 10 23:17:31 2020 |
DK, LS, PW, TD, CA | Wednesday 11 March 2020 | 00:15 Shift change near AIDA R6_475
We continue with spill cycles around 0.2 |
43x |
|
|
147
|
Thu Mar 12 23:44:48 2020 |
DK | PID Plots | Labelled PID plots. Note that the A/Q calibration
is shifted by +0.02 units, and Z calibration
is offset by about +5.
|
  |
|
|
148
|
Fri Mar 13 08:01:53 2020 |
DK | Friday 13th 8:00 to 16:00 shift | 8:00 - See previous shift's elog entry. All
good.
|
8x |
|
|
236
|
Sat Apr 17 19:39:56 2021 |
DJ, TD | Saturday 17 April 20.00-00.00 |
19.37 per FEE64 rate spectra - attachments
1 & 2
|
13x |
|
|
238
|
Sun Apr 18 07:30:20 2021 |
DJ, TD | Sunday 18th April 08:00-12:00 | ---- 09-26
FEE64 module aida06 failed
FEE64 module aida07 failed |
7x |
|
|
263
|
Thu Apr 22 23:17:46 2021 |
DJ | Friday 23rd April 00:00-08:00 | Took over from TD ... All is well.
00:45 System Wide Checks
Clock: 12 passed, 0 failed. |
27x |
|
|
695
|
Fri Jan 31 09:37:47 2025 |
CC, TD, MP | Friday 31 January | Implantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
|
26x |
|
|
697
|
Fri Jan 31 17:26:47 2025 |
CC, TD, MP | Friday 31 January contd. |
18.18 bPlas and BB7 installs complete
Restart AIDA DAQ, Merger, Tape Server |
16x |
|
|
704
|
Fri Jun 13 12:42:39 2025 |
CC, TD | Friday 13 June 2025 |
13.42 ASIC settings 2025Jun12-13.53.04
*all* FEE64s slow comparator 0x64
|
10x |
|
|
709
|
Tue Jul 22 18:00:45 2025 |
CC, NK, MP | FWHM aida FEE | AIDA05 completely disconnected, all the
others FEEs64 are fully connected
Attachment 1: aida05, FWHM= 95 |
 |