  703   Thu Jun 12 13:15:25 2025 GB, CC, NK, MP, TDThursday 12 June 2025
EMC tests with NK (Orsay)
 Screenshot_from_2025-06-12_14-39-35.pngScreenshot_from_2025-06-12_14-33-26.png 
  149   Fri Mar 13 15:48:11 2020 Friday 13th 16:00 - 24:00OH, TDASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 11x 
  661   Thu Jun 13 23:04:01 2024 Dan Judson, TD0.00-8.00 14/6/240.00 checks - all looks ok

Voltage/currents - attachment 1

Rates attachment 2 + 3
 40x 
  647   Mon Jun 10 07:15:48 2024 Dan08.00-16.00 Monday 10th June8am checks

temps ok - attachment 2

rates ok - attachment 8
 50x 
  231   Fri Apr 16 15:52:08 2021 DSJ 16 April 16.00 shiftClock status test result: Passed 12, Failed
0
 12x 
  267   Fri Apr 23 15:13:28 2021 DSJ23 April 16.00-20.00 shift16:00 taking over from Muneerah

16:15 - temp, ucesb, database,
stats etc. look ok.
 6x 
  322   Mon May 17 23:17:16 2021 DSJTuesday 18 May 0.00-8.00 shift0.00 - Taking over from Lewis 

00.30 - Rates look ok (fig1), Ran
R14_147 through analyser, dead times
 39x 
  588   Mon Apr 22 15:17:07 2024 DSJ16.00-0.00 22/04/24First checks of shift. All looks ok.

Screenshot of HV, temps,
rates, Merger attached. Attachments 1-4.
 26x 
  151   Sat Mar 14 07:13:59 2020 DK, TD, LS, CGSaturday 14th March 08:00 - 24:008:15
    All system wide checks passed
    Leak currents are continuing to creep
 41x 
  105   Sat Dec 7 02:39:02 2019 DK, NH et al.34Si Fragments PIDSee attached

Tentative PID (DK) as attachment #3
 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp 
  140   Tue Mar 10 23:17:31 2020 DK, LS, PW, TD, CAWednesday 11 March 202000:15 Shift change near AIDA R6_475

  We continue with spill cycles around 0.2
 43x 
  147   Thu Mar 12 23:44:48 2020 DKPID PlotsLabelled PID plots.  Note that the A/Q calibration
is shifted by +0.02 units, and Z calibration
is offset by about +5.
 pid.pngpid.pngpid.pdf 
  148   Fri Mar 13 08:01:53 2020 DKFriday 13th 8:00 to 16:00 shift8:00 - See previous shift's elog entry.  All
good.
 8x 
  236   Sat Apr 17 19:39:56 2021 DJ, TDSaturday 17 April 20.00-00.00
19.37 per FEE64 rate spectra - attachments
1 & 2
 13x 
  238   Sun Apr 18 07:30:20 2021 DJ, TDSunday 18th April 08:00-12:00---- 09-26
FEE64 module aida06 failed
FEE64 module aida07 failed
 7x 
  263   Thu Apr 22 23:17:46 2021 DJ Friday 23rd April 00:00-08:00Took over from TD ... All is well.

00:45 System Wide Checks

Clock: 12 passed, 0 failed.
 27x 
  695   Fri Jan 31 09:37:47 2025 CC, TD, MPFriday 31 JanuaryImplantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
 26x 
  697   Fri Jan 31 17:26:47 2025 CC, TD, MPFriday 31 January contd.
18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server
 16x 
  704   Fri Jun 13 12:42:39 2025 CC, TDFriday 13 June 2025
13.42 ASIC settings 2025Jun12-13.53.04
      *all* FEE64s slow comparator 0x64
 10x 
  709   Tue Jul 22 18:00:45 2025 CC, NK, MPFWHM aida FEEAIDA05 completely disconnected, all the
others FEEs64 are fully connected

Attachment 1: aida05, FWHM= 95
 Screenshot_from_2025-07-22_18-59-26.pngScreenshot_from_2025-07-22_18-59-45.png 