AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 33 of 36  ELOG logo
Entry  Sat May 14 01:52:03 2022, ML, 2h-Shift Checks Stats_Screenshot_from_2022-05-14_02-48-14.pngTemp_Screenshot_from_2022-05-14_02-47-31.pngHV_LC_Screenshot_from_2022-05-14_02-46-42.pngucesb_rates_Screenshot_from_2022-05-14_02-50-36.pngGrafana_Screenshot_from_2022-05-14_03-50-00.png
AIDA stats ok

Leakage current ok

Temperatires ok
Entry  Tue Mar 26 14:59:30 2019, NH, 26.03.2019 20190326Temps.pngaidambsrelay-error.png
Fig1: FEE temperatures from 26.03.2019  all OK

AIDA has been on today and merger setting fixed (see previous ELOG entry https://elog.ph.ed.ac.uk/DESPEC/36)

Still diagnosing issues with MBS (figure 2) but local data acquisition should be functional.
Entry  Fri Jan 25 09:54:12 2019, CA, TD, NH, VP, 25th January 2019 8x
09.30: AIDA still running, not writing to file
       Still running ok
       No water leaks
Entry  Sun Jun 9 22:49:56 2024, TD, 23:00-07:00 Monday 9 June  27x

23.47 DSSSD bias & leakage current OK - attachments 1-2
Entry  Fri Apr 23 15:13:28 2021, DSJ, 23 April 16.00-20.00 shift 6x
16:00 taking over from Muneerah

16:15 - temp, ucesb, database, stats etc. look ok.

16:41 - Nic restarting MBS
Entry  Wed Apr 21 23:05:39 2021, CA, 22nd April 00:00 - 08:00 16x
00:07 stats/ucesb/DB checks all ok

00:30 all system wide checks ok *except* fpga errors
Entry  Mon Apr 22 11:43:55 2024, TD, 21-22.4.24 overnight MIDASsort online sort  7x

Attachment 1 - per DSSSD LEC e_p versus e_n (20keV/channel)
Entry  Mon Apr 19 23:01:02 2021, OH, 20th April 00:00-08:00 17x
23:52 Noticed AIDA07 has dropped out of the merger and is producing no statistics
      Powercycling to recover
Entry  Tue Apr 23 19:23:42 2024, PP, 20:30 checks 8x
All looks good.

Screenshots attached.
Entry  Wed Nov 20 20:36:14 2019, CA, CB, DK, NH, 20/21 November Night Shift 17x
21:35 (NH) - A few merger timestamp errors were appearing - Decided to powercycle all FEE64s, all checks OK.
 No Screenshot due to forgetting before I closed merger 
 FEEs were often not stopping properly and needing merger reset as well.
Entry  Wed Apr 24 18:44:05 2024, PP, 19:30 checks 8x
All seems smooth.

Screenshots attached.
Entry  Tue Nov 19 21:22:06 2019, CA, CB, DK, NH, 19/20 November 2019 - overnight shift 15x
19 November

Waiting for 40Ar beam to be delivered for tests.
Entry  Wed May 19 09:12:52 2021, Muneerah, Betool, LS, 17th May 00:00-12:00 17x
Auther: Muneerah and Betool
02:00 The dead time have been checked every 30 min from the start of the shift, it seemes Ok
      Statistics ok - 210517_0202_Stats
Entry  Wed Dec 18 02:44:27 2019, NH, 17.12.19, 18.12.19  7x
Beam: 238U (850 MeV/u)
Fragment: 168Re
Entry  Wed Apr 24 15:37:59 2024, PP, 16:00-00:00 shift Wednesday 24 April 8x
All seems OK.

Screenshots attached.
Entry  Tue Jun 11 15:01:07 2024, PP TD, 16:00-00:00 shift Tuesday 11/06/24 13x
All seems OK

Screenshots attached.
Entry  Mon Jun 10 15:07:24 2024, Marc, 16:00-00:00 shift Monday 10/06/24 31x
Evening shift


5pm full checks:
DSSSD bias & leakage current  ok - attachment # 1-2
FEE64 temperatures  ok - attachment # 3
ADC
data item stats - attachment # 4
per FEE64 Rate spectra - attachment # 5
Merger ok - Attachement # 6
Tape service - attachement # 7



7pm
Entry  Sun Apr 28 16:26:47 2024, Betool Alayed, 16:00-00:00 Sunday 28 April 10x
19:24 pm screenshots

and

17:18 pm screenshots
Entry  Wed Jun 12 15:41:07 2024, Betool Alayed, 16:00-00:00 Wed 12 Jun 24 27x
5pm full checks:
DSSSD bias & leakage current  ok - attachment # 1-2
FEE64 temperatures  ok - attachment # 3
Entry  Thu Jun 13 21:06:44 2024, Robert Page, 16:00 to 00:00 shift on 13/6/2024 26x
Elog went down around the end of the last shift, so final screenshots were not uploaded at that point.

However, AIDA appears to have contuned running smoothly in the interim (at least until 22:00).

 
ELOG V3.1.4-unknown